THEMIS-SCM - PER THEMIS Instrument Suite PERSCM- 1 UCB, May 2, 2005 Search Coil Magnetometer Alain Roux, CETP.

Slides:



Advertisements
Similar presentations
January 6. January 7 January 8 January 9 January 10.
Advertisements

2012 JANUARY Sun Mon Tue Wed Thu Fri Sat
THEMIS INSTRUMENT PER 1 UCB, May, 2005 EMC / Mag Instrument Test Plan & Results Michael Ludlam University of California - Berkeley.
Solar Probe Plus FIELDS Monthly Management Telecom Sep 17, 2012.
THEMIS Mission CDRInstrument I&T 1 UCB, June , 2004 Instrument Integration and Test Rick Sterling / Sharon Jelinsky University of California – Berkeley.
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 Integration and Test Critical Design Review Rick Sterling University of California – Berkeley Thm_CDR_IT_Revc.
THEMIS-SCM THM – SCM – CDR – 08-April-2004 in Velizy
PACS IHDR 12/13 Nov 2003 PACS FPU Distribution Boards and FPU Harness Concept R. Graue, D. Kampf Kayser-Threde.
THEMIS F2/F3 IPSR and F4/F5 IPER 1 By Telecon, November 10, 2005 THEMIS INSTRUMENT SUITE FM2/FM3 PRE-SHIP REVIEW FM4/FM5 PRE-ENVIRONMENTAL REVIEW Thermal.
THEMIS Instrument Suite PERSuite T-V- 1 UCB, May 2, 2005 THEMIS Instrument Suite Thermal Vac Test Rick Sterling University of California, Berkeley.
Office of Science Coupling Coil Status S. Gourlay August 1, 2012.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Test Plan Michael Ludlam Space Sciences Laboratory.
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 THEMIS Electric Field Instrument Fabrication, Integration, and Testing.
FM4/FM5 PSRSCM - 1UCB, May 5 th, 2006 THEMIS FM4/FM5 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) SEARCH COIL MAGNETOMETER (SCM) Michael Ludlam University of.
THEMIS peer Instrument CDR 1 CETP, Paris, April 8, 2004 THEMIS Mission Status at Peer UCB Instrument Critical Design Review UCB, April 19/20, 2004 Vassilis.
THEMIS Mission CDR -UCB, June 14-18, 2004 Search Coil Magnetometer (SCM) MCDR Alain Roux, CETP-Velizy Co-i: O.Le Contel Technical Manager: B.de la Porte*
THEMIS Mission PDR/CAR 1 UCB, November 12-14, 2003 Search Coil Magnetometer (SCM) Mission PDR/CAR Alain Roux CETP-Velizy Co-i: O.Le Contel Technical Manager:
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW Boom PER 30 June RBSP EFW Spin Plane Booms Greg Dalton Space Sciences.
THEMIS SCM CDR MC VASSAL - 3D PLUS CETP 04/08/ Preamplifiers in 3D Technology EM manufacturing Part list and component Lot Acceptance Tests FM manufacturing.
FM1 Instrument Suite Pre-Ship Review (PSR)Thermal-1UCB, September 21, 2005 THEMIS FM1 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) THERMAL Chris Smith University.
Presented by A.B. Galvin STEREO SWG NOAA Boulder, Co 22 March 2004 PLASTIC Activities.
FM2 PPSRAGENDA 1 UCB, March ??, 2006 THEMIS PROBE FM2 PRE-ENVIRONMENTAL REVIEW INTRODUCTION Paul Turin LME University of California - Berkeley.
THEMIS Instrument FM2/FM3 PERFGM 1 Teleconference 8/30/2005 THEMIS Instrument FM2/3 Pre-Environmental Review Fluxgate Magnetometer (FGM) Dr Ellen Taylor.
CEA-Grenoble / DSM / DRFMC / SBT / Lionel DUBAND - Instrument Baseline Design Review - PACS and SPIRE Cooler - Feb. 27/ SPIRE & PACS SORPTION COOLERS.
CubeSat for Ions, Neutrals, Electrons and Magnetic Fields PI Robert Lin, SSL Project Manager Thomas Immel, SSL Systems Engineer Jerry Kim, SSL Mechanical.
THEMIS PER 1 UCB, May 02, 2005 Magnetometer Booms Pre Environmental Review Prof. Hari Dharan Berkeley Composites Laboratory (Presenter: David Pankow) Department.
PACS IIDR ESTEC 01/02 March 2001 System Engineering 1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher System Engineering DDVP, Model.
THEMIS Mission PDR/CAR 1 UCB, November 12-14, 2003 Instrument Integration & Test Dr. Ellen Taylor University of California - Berkeley.
PFP Instrument Status All PFP Instruments Except SWEA have been delivered, integrated, and tested; supporting environmental tests Issues: –EUV alignment.
THEMIS Instrument FM2/FM3 PEREnvironments- 1 Teleconference 8/30/2005 THEMIS Instrument FM2/3 Pre-Environmental Review Environments Jeremy McCauley University.
Dept. Physics & Astronomy Space Research Group Nick Nelms Space Research Group Dept. Physics & Astronomy University of Leicester UK GERB International.
THEMIS IDPU PDR I&T REQUIREMENTS- 1 UCB, October 16, 2003 I&T REQUIREMENTS Ellen Taylor University of California - Berkeley.
Solar Probe Plus Fluxgate Magnetometer QSR – Oct SPF MAG Quarterly Report – Oct 2014 The MAG EM1 (EQM) (board and frame at right) was successfully.
THEMIS INSTRUMENT CDR Peer ReviewSYSTEM- 1 UCB, April 19, 2004 TITLE: Test Flow RFA CODE: UCB-10 REQUESTED BY: Preble SPECIFIC REQUEST: We recommend that.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
SWGTemplate- 1 UCB, Nov 15/16, 2006 THEMIS SCIENCE WORKING TEAM MEETING Search Coil Magnetometer (SCM) team Co-i: A. Roux, O. Le Contel Technical Manager(*):
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 Flux Gate Magnetometer and Boom Thermal Christopher Smith Thermal Engineer
THEMIS SCM PDR CETP 10/10/ Parts and materials Christophe Coillot 1)Parts Preliminary definition of part list 3D+ modules appear as a component Most.
STEREO PLASTIC PLASTIC: The Plasma and Suprathermal Ion Composition Investigation on STEREO A.B. Galvin, E. Moebius, L. Kistler, M. A. Popecki, J. Quinn.
FM1 Instrument Suite Pre-Ship Review (PSR)Magbooms- 1 UCB September 21, 2005 THEMIS FM1 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) MAGNETOMETER BOOMS Paul.
FM1 Instrument Suite Pre-Ship Review (PSR)INT- 1 UCB September 21, 2005 THEMIS FM1 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) INTEGRATION AND TEST PLANS Jeremy.
Solar Probe Plus FIELDS Fluxgate Magnetometer QSR – June 2015 June 16, SPF MAG Quarterly Report – June 2015 MAG FM1 electronics PCB assembled (see.
June 16, 2015SPP/FIELDS SOC CDR: Integration & Test SPP/FIELDS Integration and Test SOC Critical Design Review Keith Goetz University of Minnesota
FM2/FM3 PSR FM4/FM5 PERSCM - 1UCB, November 10, 2005 THEMIS FM2/FM3 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) THEMIS FM4/FM5 INSTRUMENT SUITE PRE- ENVIRONMENTAL.
FGM peer CDR FGS - 1 Berlin, April 6, 2004 FGS Mechanical Design Hans-Ulrich Auster Institut für Geophysik und Meteorologie TU Braunschweig.
THEMIS Instrument PDRMission Assurance- 1 UCB, October 15-16, 2003 THEMIS Mission Assurance Preliminary Design Review Ron Jackson University of California.
FIELDS Fabrication Review Board FRB SearchCoil Magnetometer SENSOR S/N 4 Ferrite cores cracks P. LEROY 1MMS SCM FRB, 20 APR 2012.
THEMIS Instrument Pre-Environmental Review 1 UCB 5/02/2005 THEMIS Instrument Pre-Environmental Review Project Status May 2, 2005 Peter R. Harvey THEMIS.
THEMIS MRRSystems - 1 GSFC, Jan 5, 2007 Systems Engineering.
July 2007 SundayMondayTuesdayWednesdayThursdayFridaySaturday
FM1 Instrument Suite PSRSCM - 1UCB, September 21, 2005 THEMIS FM1 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) SEARCH COIL MAGNETOMETER (SCM) Michael Ludlam.
1 SWEA pre-CDR Peer Review Particles and Fields Package (PFP) SWEA pre-CDR Peer Review Integration with PFP, Qualification, ATLO 2011 March 28 Dave Curtis.
Double Star meeting ESTEC 25/26 March Hardware Status Engineering breadboard fabricated to validate the FPGA concept – Using an ACTEL A1280 – Tested.
1 PFP IPDR 2010/6/ Particles and Fields Package (PFP) Instrument Preliminary Design Review Integration & Test David Curtis, PF Package Manager.
THEMIS-SCM SCM – OVERALL RESSOURCES – STATUS versus REQUIREMENTS ItemSpecificationStatus Sensor Bandwith Sensor Sensitivity Up to 4 kHz 1 pT/√Hz at 10.
THEMIS INSTRUMENT SUITE
FIELDS MEP Thermal Vacuum Cycling iPER
Double Star: Experiment Activities
SPF MAG Quarterly Report – Feb 2015
Solar Probe Plus – FIELDS Main Electronics Package
Search Coil Magnetometer (SCM) CDR/Peer review CETP-Velizy
Solar Probe Plus – FIELDS Verification Instrument mini-PER (V5)
THEMIS INSTRUMENT SUITE
FIELDS SCM Thermal iPER
THEMIS Solid State Telescope Instrument (SST)
Summary FM design overview (As built) Documentation FM performances.
PHI Status Report SO Cleanliness Working Group #24
7E: Tower test plans GLAST Large Area Telescope: Tracker Subsystem
2015 January February March April May June July August September
Presentation transcript:

THEMIS-SCM - PER THEMIS Instrument Suite PERSCM- 1 UCB, May 2, 2005 Search Coil Magnetometer Alain Roux, CETP

THEMIS-SCM - PER THEMIS Instrument Suite PERSCM- 2 UCB, May 2, 2005 ItemModelTest typeQ/A level Report referenceResult SCM- PA EM (ETU) Functional Vibrations Thermal Physical QQQQQQQQ Covered by Thermal Test THM-SCM-PA-TST-01 THM-SCM-PA-TST-02 THM-SCM-PA-TST-03 Success SCM- Pre-Amplifier QUALIFICATION The design of the PA has been qualified with the ETU Model (EM) In addition, the SCM-PA has been (will be ?) tested in Thermal Vacuum, mounted on the IDPU ALL TEST REPORTS ARE INCLUDED IN THE ACCEPTANCE DATA PACKAGE DELIVERED WITH THE EM THM-SCM-ADP-0a section 06

THEMIS-SCM - PER THEMIS Instrument Suite PERSCM- 3 UCB, May 2, 2005 ItemModelTest typeQ/A level Report referenceResult SCM- SC EM (ETU) Functional / Calibration Vibrations Thermal Physical Thermal Potting only QQQQQQQQQQ THM-SCM-SC-TST-05 THM-SCM-CAL-EM1.0 THM-SCM-SC-TST-06 THM-SCM-SC-TST-07 THM-SCM-SC-TST-08 THM-SCM-SC-TST-09 Success Success (*) Success SCM- Search Coil QUALIFICATION The design of the SC has been qualified with the ETU Model (EM) ALL TEST REPORTS ARE INCLUDED IN THE ACCEPTANCE DATA PACKAGE DELIVERED WITH THE EM THM-SCM-ADP-0b section 06 (*) in this test, only the functional properties of the Sensor were validated in thermal. A few cracks being observed in the external potting, the design of the potting was modified and qualified in the test TST-09

THEMIS-SCM - PER THEMIS Instrument Suite PERSCM- 4 UCB, May 2, 2005 ItemModelTest typeQ/A level Report referenceResult SCM- PA F1Functional Vibrations Thermal Physical AAAAAAAA Covered by Thermal Test THM-SCM-PA-TST-11 THM-SCM-PA-TST-12 THM-SCM-PA-TST-03 EM measurements, not repeated with FMs Success See EM ACCEPTANCE TESTS of SCM - Pre-Amplifier The PA, Model F1, has been tested at Acceptance level In addition, the SCM-PA has been (will be ?) tested in Thermal Vacuum, mounted on the IDPU ALL TEST REPORTS ARE INCLUDED IN THE ACCEPTANCE DATA PACKAGE DELIVERED WITH THE FM1 THM-SCM-ADP-1a

THEMIS-SCM - PER THEMIS Instrument Suite PERSCM- 5 UCB, May 2, 2005 ItemMod el Test typeQ/A level Report referenceResult SCM- SC F1Functional / Calibration Vibrations Thermal Vac Physical AAAAAA THM-SCM-SC-TST- 15 THM-SCM-SC-TST-13 THM-SCM-SC-TST-14 THM-SCM-SC-TST-08 EM measurements, not repeated with FMs Success See EM ACCEPTANCE TESTS of SCM- Search Coil The SC, model F1, has been tested at Acceptance level ALL TEST REPORTS ARE INCLUDED IN THE ACCEPTANCE DATA PACKAGE DELIVERED WITH THEFM1 THM-SCM-ADP-1b

THEMIS-SCM - PER THEMIS Instrument Suite PERSCM- 6 UCB, May 2, 2005 ItemTestlevelspecification PA/SCVibration Sine Vibration Random Vibration Sine Vibration Random QQAAQQAA According to SAI-STM Qualification According to SAI-STM-2510 – Qualification According to SAI-STM Acceptance According to SAI-STM Acceptance PA SC PA SC Thermal Thermal Vacuum QQAAQQAA 3 cycles; 4 h/step; -45, +60 °C 6 cycles; 4 h/step; -100, +80 °C 3 cycles; 4 h/step; -45, +55 °C 2 cycles; 4 h/step; -70, +45 °C CalibrationQ/AAccording to the scientific requirements THM TESTS SPECIFICATIONS The SCM FM1, FM2, FM3 have been tested all together

THEMIS-SCM - PER THEMIS Instrument Suite PERSCM- 7 UCB, May 2, 2005 THEMIS SCM SCHEDULE ItemModelDelivery DateDelivery Status SCM (SC-PA & Harness) ETU : PA ETU : SC FM1 FM2 FM3 FM4 FM5 Spare Model August 04, 2004 November 24, 2005 January 01, 2005 March 22, 2005 April 04, 2005 May 2005 (tbc) Delivered Qualification under progress The SCM FM1 & FM2 have been delivered together The SCM FM3 & FM4 have been delivered together

THEMIS-SCM - PER THEMIS Instrument Suite PERSCM- 8 UCB, May 2, 2005 SC Vibration test

THEMIS-SCM - PER THEMIS Instrument Suite PERSCM- 9 UCB, May 2, 2005 SC Thermal vacuum test

THEMIS-SCM - PER THEMIS Instrument Suite PERSCM- 10 UCB, May 2, 2005 PA Vibration test

THEMIS-SCM - PER THEMIS Instrument Suite PERSCM- 11 UCB, May 2, 2005 PA Thermal test