Operations and Analysis Division Field Operations Branch Norfolk, VA.

Slides:



Advertisements
Similar presentations
Aeronautical Survey Training Workshop Corbin Training Facility AC Geodetic Control November 14-18, 2011.
Advertisements

Protecting the Public, Astronauts and Pilots, the NASA Workforce, and High-Value Equipment and Property Mission Success Starts With Safety “September 11th.
Solutions Summit 2014 Compliance Update Month-by-Month Compliance Obligations Mark Vogel – Chesapeake Systems.
National Ocean Service Budget Update for the NOAA Hydrographic Services Review Panel Glenn Boledovich, Chief NOS Policy, Planning and Analysis Division.
US Army Corps of Engineers BUILDING STRONG ® 5/7/2015 Adopting National Standards for Tidal and Geodetic Datums Jim Garster US Army Corps of Engineers.
Assistant Administrator National Oceanic and Atmospheric Administration National Ocean Service September 18, 2008 John H. Dunnigan Toward National Height.
Department of Transportation Support Services Branch ODOT Procurement Office Intergovernmental Agreements 455 Airport Rd. SE, Bldg K Salem, OR
Alabama Height Modernization Project, NAD 83(2011), and GEOID 12 in Alabama Overview of Height Modernization Project Overview of Height Modernization.
Mission Statement SC Height Modernization Status In the NGS Database (Height Mod Project) In progress Proposed.
Tidal Datums Text and Figures Source: NOAA/NOS CO-OPS Tidal Datums related publications.
Federal Geodetic Control Subcommittee Update Federal Geographic Data Committee Coordination Group Meeting Tuesday, November 3, 2009 Juliana Blackwell Director,
2015 Height Modernization Partner Meeting April 14, 2015.
National Geodetic Survey NOAA’s National Geodetic Survey
Better Positions and Improved Access to the National Spatial Reference System  Multi-Year CORS Solution  National Adjustment of 2011  New NGS Datasheet.
Federal Geodetic Control Subcommittee Update to Coordination Group Ronnie Taylor alternate Subcommittee Chair Deputy Director, National Geodetic Survey.
Texas Height Modernization and Texas Spatial Reference Center Gary Jeffress, Ph.D., RPLS Director, Conrad Blucher Institute for Surveying and Science Texas.
GIS Director: Gina Herbst Principal : Victor M. Rasgado, PLS 8113 Certified DBE/MEB
NGS role in supporting to FAA
Education for Height Modernization Dr. Stacey D. Lyle, RPLS.
Illinois Height Modernization Sheena K. Beaverson.
Juliana Blackwell, Director National Geodetic Survey, NOAA
GPS Survey Equipment GPS Trimble R6 or R8 Legs+Bipod Controller* Base Station or VRS Competencies #1-5.
1  Wisconsin Height Modernization Program (HMP) Update  WisDOT Survey Equipment Information  Central Office Survey Equipment Inventory Jacob J. Rockweiler,
Streamgage Datum Conversion Great Lakes Region Height Modernization Consortium meeting New Cumberland, PA April 13, 2011.
Mission Statement SC Height Modernization Status In the NGS Database (Height Mod Project) In progress Proposed.
FSM Dept. Transportation, Communications & Infrastructure AIR CARRIERS IN THE FSM On August 01, 2004, a FSM Foreign Air Carrier Permit (FACP) was issued.
NGS HSRP Update Ronnie Taylor, Acting Director National Geodetic Survey, NOAA October 13, 2010.
National Geodetic Survey Update Providence, RI May 6, 2010 Juliana Blackwell Director, National Geodetic Survey.
Puerto Rico Airborne Gravity Data Modeling
A New & Improved National Spatial Reference System Refinements of the North American Datum of 1983 through the Multi-Year CORS Solution and the National.
Construction MATOC Information Briefing. Agenda Source Selection Award Administration.
New Vertical Datum Implementation Plan FGDC Silver Spring, MD. July 30, 2013 Mark C. Eckl Chief of the Observation and Analysis Division, National Geodetic.
2010 Hydrographic Services Review Panel David Steele, PLS DNR Geodetic Survey Director & Spatial Reference Center of Washington.
Height Modernization Making the Most of the Indiana HARN and the INDOT CORS March 14, 2007 By William A. Schmidt, PE, LS Manager of Aerial Engineering,
1 Support Capabilities for Advanced Launch Systems RDT&E and Operations November 6, 2010.
AEC Summit NOAA’s National Geodetic Survey Update Brian Shaw Geodesist.
Alliance Texas Small Business Fair GSA, PBS Fort Worth, TX June 26 th, 2008.
At Lewis Field Glenn Research Center 0530 Safety Directors Meeting Glenn Safety Office Manuel B. Dominguez March 6, 2001.
NOAA – NGA Synergy Stephen Malys Senior Scientist for Geodesy and Geophysics National Geospatial-Intelligence Agency NOAA Hydrographic Services Review.
SITECH (WA) PTY LTD Site Positioning Systems Supervisor System Sub Station Demo Guide.
RMI Ports Authority Pacific Aviation Directors Workshop April 5-7, 2005 Radisson Prince Kuhio Hotel, Honolulu, HI Pacific Aviation Directors Workshop April.
The National Geodetic Survey Gravity Program Benefits and Opportunities Juliana Blackwell, Director National Geodetic Survey (NGS)
Design, Construction and Implementation of a Statewide Real Time Kinematic GPS Network John A. Ray Administrator Office of Aerial Engineering Ohio Department.
NATIONAL READJUSTMENT WHAT WHY HOW WHEN NAD83(NSRS)
Use of High-Rate CORS for Airborne Positioning Theresa M. Damiani NOAA- National Geodetic Survey, Geosciences Research Division CGSIC 2013, Nashville 1b.
The Importance of Accurate Elevations & Case Studies Edward Carlson Pacific Region Geodetic Advisor National Geodetic Survey (808)
MISSISSIPPI HEIGHT MODERNIZATION PROJECT JUNE 11, 2009 By Ronnie L. Taylor Chief, Geodetic Advisor Branch NOAA, National Geodetic Survey.
NGS INTERNATIONAL PROGRAMS Agency for International Development Federal Aviation Administration Individual Countries.
The INDOT CORS Indiana GIS Conference February 19, 2008 By William A. Schmidt, PE, LS Manager of Aerial Engineering, INDOT Thomas A. Mahon, PE, LS Survey.
2015 International Great Lakes Datum Height Modernization Project Dave Rigney NGS Geodetic Advisor Michigan Great Lakes Region Height.
NOAA’s CENTER for OPERATIONAL OCEANOGRAPHIC PRODUCTS and SERVICES Updating the International Great Lakes Datum Laura Rear McLaughlin Center for Operational.
National Ocean Service NGS, NOS, NOAA Real-Time GPS Positioning of Ships To Integrate Navigation Services Real-Time GPS Positioning of Ships To Integrate.
Revolution in Earth Measurement Traditional Surveying uses benchmarks as reference points Global Positioning uses fixed GPS receivers as reference points.
Mark Howard October, 2008 NGS ORIENTATION NOAA/NGS Aeronautical Survey Program.
National Readjustment DALE PURSELL ACSM NATIONAL READJUSTMENT WHAT? WHY HOW WHEN POST QUESTIONS.
National Geodetic Survey Update Hydrographic Services Review Panel Honolulu, HI May 4, 2011 Juliana Blackwell Director National Geodetic Survey.
Understanding your reference datum – it can be a cost saver!
Presented to: By: Date: Hydrographic Service Review Panel FAA use of NOAA Services HSRP George P. Sempeles 17 September 2015.
Improving Communication and Coordination in Highway Work Zones Kimberly Peters Incident Management Program Director, INDOT Event Date.
Geodetic Applications of GNSS within the United States Dr. Gerald L. Mader National Geodetic Survey NOS/NOAA Silver Spring, Maryland USA Munich Satellite.
Arizona Height Modernization Program - AZHMP Dave Minkel NGS Geodetic Advisor to Arizona Geospatial Professional Member, APLS Dave Minkel NGS Geodetic.
Jeffrey Simmons Senior Deputy Director The Bahamas Department of Meteorology RA-IV WIGOS Implementation Workshop (English), 1.
New Datum: Vertical (Geopotential) FGCS Silver Spring, MD. July 24, 2011 Mark C. Eckl NGS Chief of Observation and Analysis Division, New Vertical Datum.
111 Media General Cable Year 2000 Project Chief Executive Officer Status Report Briefing.
GRAV-D: NGS Gravity for the Re- definition of the American Vertical Datum Project V. A. Childers, D. R. Roman, D. A. Smith, and T. M. Diehl* U.S. National.
Mike Quinn – ADSO-Narragansett Bay –
Colorado Height Modernization Forum Zelda LeCoat Zelda LeCoat.
Federal Geodetic Control Subcommittee Update to Coordination Group Juliana Blackwell Subcommittee Chair Director, National Geodetic Survey
Rear Admiral Shepard M. Smith, NOAA
TxMAG presentation
Presentation transcript:

Operations and Analysis Division Field Operations Branch Norfolk, VA

NGS – OAD – FOB Workforce Our workforce consists of –16 field personnel – 2 supervisors – 2 secretaries – 1 staff person – 1 IT person We are roughly divided into two groups –one in support of the Airport Survey Program (ASP) –the other in support of Special Projects. Personnel from both sections interact on a daily basis to help us fulfill our required missions and to meet NGS and FAA milestones.

Norfolk, VA FOB Office

The ASP group does a variety of different types of surveys for the FAA’s National Air Space under an Interagency Agreement –Responsible for conducting surveys at the nation’s airport, both big and small. –The Norfolk field office, in one form or another, has been surveying airports for the FAA since –Working with the FAA on doing QA Reviews for the FAA TPSS (Third Party Surveys done by private survey companies) Our field crews currently consist of two, NGS FTE, 2 man survey crews. We are winding down on a three year contract involving two private survey companies to assist NGS in these surveys. Last year we performed surveys from coast to coast, Alaska and Puerto Rico. In the past, we have also surveyed the airports in Hawaii, the US Virgin Islands, Guam, Micronesia and American Samoa.

Typical observations for these surveys include a daily mix of – GPS observations, both Static and RTK – classical observations – In addition, our crews are also well versed in Cartography Photogrammetry aerial photo interpretation Geodesy on-site observation analysis for both GPS and classical field work.

Typical Survey Observations

Our crews interact on a daily basis with FAA officials and Airport Authorities. Their work requires them to work directly on the airport, including working both on and around the active runways and aircraft, where they have to be safety conscience at all times.

Typical Survey Observations

Special projects have included –HARN processing –Supporting the Hurricane Mitch project in Honduras –GPS and level projects in Puerto Rico and in the US Virgin Islands –Grav-D support –NERS project sites –Commemorative Marks setting throughout the US and Alaska In addition we have supported testing in GRAV_D, mmGPS, LIDAR and other new technologies now being used in NGS and NOAA … and the list just goes on and on.

In order to accomplish our mission for NGS and OAD, we have two outdoor testing and training sites available. The first is our downtown Norfolk office. –This site consists of six NGS published control stations we have set One B-order horizontal station Two 1st-order horizontal stations Three GPS stations of lesser accuracy. All six have published 1st-order elevations

One of our first tasks was to monument 3 of those 6 stations. –One is a 3-D rod mark –the second is a poured-in-place mark –the third is a mark set in a drill hole.

Setting a 3-D Rod Mark at FOB

FOB Control Stations

The second phase for these stations was to position them with GPS observations and submit them to the NGS database. Elevations were established on all six as part of a 1st-order level training program. We also established 3rd-order positions on additional stations by both GPS static and RTK methods and by classical observations. These stations provide us great flexibility in observations for our testing and training sessions.

This network of control stations is used for a variety of observations. They are often used by –Other government agencies –Private surveyors for construction work in the area, including the new Norfolk light rail system that will run adjacent to our property. We also use these stations for testing our own equipment prior to sending it to our field crews.

1 st Order Level Training to FOB

Level Training at Nauticus Downtown Norfolk, VA

GPS- RTK Training at FOB Office

Jack Dunnigan recently visited our facility in July 2008 and was introduced to the various types of our surveying equipment, many of which he had never seen used before. His visit was included in the NGS Directors Update dated

Jack Dunnigan Using Digital Level at Norfolk FOB

Jack Dunnigan Using GPS RTK Equipment at Norfolk FOB

Jack Dunnigan Looking at Various Surveying Equipment at Norfolk FOB Used in the Airport Surveys Program

Our second site is located at the Suffolk Executive Airport in Suffolk, VA (home of the Suffolk Peanut Festival held every September) located 25 miles from our office. This is a public airport with two active runways and one closed runway. Most of our work is done on the closed runway but does include work on both active runways at various times. The airport has two 1st-order bench marks one with a GPS position established by FOB and numerous other GPS determined control points scattered thorough out the airfield.

Suffolk Executive Airport Suffolk, VA

Besides testing and training, and in partnership with the NGS Corbin office, the Norfolk staff uses the Suffolk airport for –Product demonstrations and training from vendors – Application development of new technologies such as: APPLANIX – in conjunction with the Corbin facility mmGPS – in support of the NGS Coastal program LIDAR – including our new Riegl Terrestrial LIDAR system

Level Training on Rwy at SFQ

mmGPS Testing at SFQ

LIDAR Testing at SFQ

LIDAR Truck at Corbin, VA

In the past two we have helped to enhanced the NGS presence in –Puerto Rico for the new Puerto Rico Vertical Datum –the US Virgin Islands leveling and GPS observations in support of the forthcoming Terrestrial Gravity project.

Leveling in Puerto Rico

On site training for our new Airport Data Logger software, developed by NGS was conducted last year at the Rochester International Airport, Rochester, MN and the Albany International Airport, Albany NY for our two NGS FTE survey crews. Our three NGS Contractor survey crews were trained at the two Amarillo, TX airports and one of the Oklahoma City, OK airports. We are currently doing a precise level project with the New York and Canadian Power Authorities in Massena, New York for the CO_OPS group located in Chesapeake, VA. Quite a few of the NGS State Advisors, Silver Spring and Corbin personnel, and the new Grav-D section have worked in the Norfolk Office.

Norfolk, VA Field Operations Branch Questions?