DOE Review of LARP – February 17-18, 2014 Coil Design and Fabrication Miao Yu February 17, 2014 1.

Slides:



Advertisements
Similar presentations
LQ & LM Status & Plan for FY08 – Fred Nobrega 1 LARP Collab. Meeting – SLAC, Oct , 2007 BNL - FNAL - LBNL - SLAC Long Quadrupole (LQ)-Long Dipole.
Advertisements

LQ Reaction & Impregnation Tooling Internal Review F. Nobrega, N. Andreev August 13, 2007.
LHQ Coil 02 Winding and Curing Plan Miao Yu 03/21/13.
LHQ Coil 1 OL Curing LHQ Coil 1 Shipping Miao Yu 02/28/2013.
QXFSM1 Mirror Shim System R. Bossert Dec. 1, 2014 LARP Teleconference.
SQXF Practice Winding 1 L2 winding Miao Yu 01/23/2014.
EuCARD-HFM ESAC review of the high field dipole design, 20/01/2011, Maria Durante, 1/40 EuCARD-HFM ESAC Review of the high field dipole design Fabrication.
COIL & ASSEMBLY READINESS REVIEW, SEPT 2013 D. Smekens.
Preliminary Design of Nb 3 Sn Quadrupoles for FCC-hh M. Karppinen CERN TE-MSC.
Superconducting Large Bore Sextupole for ILC
Coil working group video-meeting P. Ferracin, J. C. Perez, S. Izquierdo Bermudez, X. Sarasola February 4th, 2014.
Curing Mold Laminations Miao Yu 05/17/2012. QC on the cross-section 30/30 samples before production 16/500 samples during production 2.
Design and Plans for Introducing Flexible End Parts Steve Krave 15 October 2013.
SQXF 25 m Cable Practice Winding at LBNL Miao Yu Dan Cheng 10/31/2013.
LHQ Coil Fabrication Experience and Plan Miao Yu 04/08/2013.
Coil Design and Fabrication Miao Yu Outline Introduction Coil Design –Coil Pole –Coil End Parts –Coil Insulation Coil Fabrication –Winding.
HQ Coil 23 and 25 Status LARP Video Meeting September 19, 2013 Dan Cheng.
H. Felice - P. Ferracin – D. Cheng 09/19/2013 Update on structure CAD model.
H. Felice - P. Ferracin – D. Cheng 09/11/2013 Update on structure CAD model.
DOE Review of LARP – February 17-18, 2014 Helene Felice P. Ferracin, M. Juchno, D. Cheng, M. Anerella, R. Hafalia, Thomas Sahner, Bruno Favrat 02/17/2014.
Fred Nobrega. 9 Dec 2014 Model Design & Fabrication – FNAL Fred Nobrega 2 Outline Background Mechanical Design Model Magnet Features Coil Technology and.
Design Features: still to be determined and open questions P. Ferracin 4 th Joint HiLumi LHC-LARP Annual Meeting November 17-21, 2014 KEK, Tsukuba.
Development of the EuCARD Nb 3 Sn Dipole Magnet FRESCA2 P. Ferracin, M. Devaux, M. Durante, P. Fazilleau, P. Fessia, P. Manil, A. Milanese, J. E. Munoz.
LQ status and plans – G. Ambrosio 1 LARP Collaboration Meeting - LBNL, April , 2006 BNL - FNAL - LBNL - SLAC OUTLINE: Goals, Input and Output Sub-tasks.
FNAL QXF Curing Mold Miao Yu, FNAL 05/07/2013. FNAL Short Curing Press 2 2 meter long Capacity (pump psi) Max. force/cylinder kN (ton) Spacing cm(inch)
LARP Prototype Assembly Steps Towards Q1 and Q3 Production Dan Cheng MQXF Design Review December 10-12, 2014 CERN.
11 T Nb3Sn Demonstrator Dipole R&D Strategy and Status
11 T Dipole Experience M. Karppinen CERN TE-MSC On behalf of CERN-FNAL project teams The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded.
Plans and schedule for QXF Giorgio Ambrosio and Paolo Ferracin Joint LARP/CM20 HiLumi meeting Napa Valley, CA, USA 8-10 April, 2013 The HiLumi LHC Design.
LHQ Coil 02 Winding and Curing Miao Yu 07/11/2013.
Fred Nobrega, Nikolai Andreev 21 September, 2015.
S. Caspi, LBNL HQ Progress and Schedule Shlomo Caspi LBNL LARP Collaboration Meeting – CM13 Port Jefferson November 4-6, 2009.
Helene Felice 11/16/2011 LARP Collaboration Meeting 17 1 st HiLumi Collaboration Meeting CERN Status on HQ Coil Design and Fabrication.
E. Cavanna, N. Bourcey, P. Ferracin, S. Izquierdo Bermudez, J. Mazet, J. C. Perez, F.O Pincot, X. Sarasola
Large Hadron Collider Accelerator Research Program Dimensional Changes of Nb 3 Sn Cables during Heat Treatment LBNL: Ian Pong Dan Dietderich.
D. Cheng Feb 11, 2014 QXF Instrumentation Trace Update.
LARP Magnets FNAL contribution to LARP (LHC Accelerator Research Program) FNAL core-program support to LARP DOE Annual Program Review - May 16-18, 2006.
D. Smekens. 2 Coil ID  CableCu DUMMY Cu DUMMY WST DUMMY RRP 54/61 DUMMY RRP 108/127 RRP 108/127 RRP 108/127 RRP 132/169.
1 Quench Protection Workshop - 04/29/2014 QXF heater design M. Marchevsky, D.W. Cheng (LBNL) E. Todesco (CERN) T. Salmi (Tampere UT) G. Chalchidze, G.
Long Quadrupole – G. Ambrosio 1 LARP Collaboration Meeting – FNAL, Oct , 2008 BNL - FNAL - LBNL - SLAC Long Quadrupole Giorgio Ambrosio LARP Collaboration.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
MQXFS Coil V1 Fabrication Status -Winding and Curing Miao Yu
LHQ Coil 03 Winding and Curing Miao Yu, Steven Krave 05/23/2014.
QXF Coil Fabrication: Baseline Decisions QXF Coil Working Group Video Meeting (Revised from discussion during presentation) Dan Cheng April 16, 2013.
SQXF1 End Parts Mini Review G. Ambrosio and P. Ferracin October,
Fabrication of test coil for D1 2m model Michinaka SUGANO KEK WP3 meeting 08/10/2014.
SQXF Cu Cable Winding Test at LBNL Dan Cheng Dec 17, 2013.
QXF Coil Insulation during Each Step QXF Coil WG Miao Yu 08/22/2013.
Long Quad (LQ) & High Gradient (HQ) Series Alexander Zlobin bnl - fnal- lbnl - slac US LHC Accelerator Research Program DOE LARP review Fermilab, June.
DOE Review of LARP – February 17-18, 2014 SQXF Coil Design and Fabrication Winding and Curing Miao Yu February 17,
CERN MBHSM0101 and Plan for Future Models F. Savary on behalf of the 11T Dipole Project Team.
DOE Review of LARP – February 17-18, 2014 Helene Felice P. Ferracin, M. Juchno, D. Cheng, M. Anerella, R. Hafalia, Thomas Sahner, Bruno Favrat 02/17/2014.
QXF Reaction / Impregnation Fixtures J. Schmalzle 4/9/13.
QXF Winding/Curing Tooling and Curing Mold Miao Yu, FNAL 04/09/2013 CM20_Napa Valley, CA.
LHQ Coil Design and Features Miao Yu Fermilab May 09, 2012.
2 nd LARP / HiLumi Collaboration Mtg, May 9, 2012LHQ Goals and Status – G. Ambrosio 11 LHQ Goals and Status Giorgio Ambrosio Fermilab 2 nd LARP / HiLumi.
1 Long QXF Mirror Fabrication (MQXFPM1) Rodger Bossert HiLumi-LARP Collaboration Meeting May 18-20, 2016 SLAC R. Bossert - HiLumi Collaboration Meeting.
LHQ Coil Fabrication Experience and Plan Miao Yu 04/08/2013.
QXF Coil Fabrication & Tooling Reaction / Impregnation
Procurement Status Miao Yu 11/19/2013.
Coil Design and Fabrication
MQXF Goals & Plans G. Ambrosio MQXF Conductor Review
QXF Cable Winding Test and End Parts Design
11T Dipole – Single Aperture 2m Model
11 T dipole coil features and dimensions
Mechanical stability and QXF coil winding
P. Ferracin and G. Ambrosio
the MDP High Field Dipole Demonstrator
MQXF updates P. Ferracin October 9th, 2014.
QXF schedule and milestones
Presentation transcript:

DOE Review of LARP – February 17-18, 2014 Coil Design and Fabrication Miao Yu February 17,

DOE Review of LARP – February 17-18, 2014 Outline Introduction QXF Coil Design – Coil Cross-section – Coil Layout – Coil Pole and End Parts QXF Coil Fabrication – Winding and Curing Tooling – Winding and Curing Traveler – Winding Test FY14 Schedule Summary 2

DOE Review of LARP – February 17-18, 2014 Introduction Based on LARP successful R&D Quadrupole coil TQ/LQ/HQ/LHQ. – Coil parts design (BEND program) – Fabrication technology (winding – curing – reaction – impregnation) – Coil size at each fabrication step (insulation and shim) to reach the final coil size To meet CERN’s requirement – Magnetic length (coil length) – Electrical requirement (plasma coating the end parts) – Energy deposition (coil cooling channel in the pole) 3

DOE Review of LARP – February 17-18, 2014 QXF Coil Design - Coil Cross-section 4 Magnetic designFabricated Coil Backup slides: Coil cross-section at each step for ground insulation

DOE Review of LARP – February 17-18, 2014 QXF Coil Design - QXF Coil Layout 5 Cooling channel RELE 1.51 m Ti-6Al4V pole and phosphor bronze wedge: used for HQ/LHQ. SS316L end spacer, saddle and splice block: accelerator magnet requirement, for HQ/LHQ SS304 was used. LQXF is 4.3 m long by adding 7 more center pole pieces.

DOE Review of LARP – February 17-18, 2014 QXF Coil Design - Coil Pole 6 > 80 % of the heat is evacuated via the pole piece with Φ8 mm holes and 50 mm spacing

DOE Review of LARP – February 17-18, 2014 QXF Coil Design - Coil End Parts 7 End parts are designed based on the nominal coil size During coil winding, the coil is not fully constrained inside the envelop, and when both the aperture and cable size are getting larger, the coil has more springback effect at the end. To fit the part without removing material from the tip during winding, the flexible feature-accordion slits are introduced into the design. End parts are plasma coated to increase the dielectric strength. temporary saddle during W&C QXF slits design with bridges

DOE Review of LARP – February 17-18, 2014 QXF Coil Fabrication - SQXF Winding and Curing Tooling Design 8 Rollover Station Curing Mold Coil Inner Layer

DOE Review of LARP – February 17-18, 2014 QXF Coil Fabrication - SQXF Winding and Curing Tooling Design 9 Rollover Station Curing Mold Winding Coil Outer Layer

DOE Review of LARP – February 17-18, 2014 QXF Coil Fabrication - Winding and Curing Tooling 10 Tooling for SQXF coil are inspected and assembled. Winding and Curing Tooling Rollover Fixture Curing Mold

DOE Review of LARP – February 17-18, 2014 QXF Coil Fabrication - LQXF Winding and Curing Tooling 11 The design of LQXF W&C tooling was finished Procurement will be started this summer Curing mold is lamination based 5-section stacking Welding Section inspection Final assembly and inspection Use the same rollover fixture for SQXF Winding table will be tested in April Selva winder will be commissioned by this Dec

DOE Review of LARP – February 17-18, 2014 QXF Coil Fabrication - Winding Test 12 Two 1 m coils, winding-curing – Check tooling – End parts inspection and design optimization Winding and curing procedure – Online version – Based on HQ/LHQ winding and curing traveler – Check the procedure

DOE Review of LARP – February 17-18, 2014 QXF Coil Fabrication - Winding Test 13 Cured Coil Coil Winding Reduce the risk of turn-turn short due to popped strands

DOE Review of LARP – February 17-18, 2014 FY 14 Schedule 14 Start the fabrication of the 1 st practice coil in the end of February.

DOE Review of LARP – February 17-18, 2014 FY 14 Schedule 15

DOE Review of LARP – February 17-18, 2014 Summary SQXF coil is designed based on HQ/LHQ coil Tooling are ready for SQXF coil winding and curing Winding and curing procedure is based on HQ/LHQ coil procedure SQXF coil fabrication will be started in the end of this February. LQXF coil winding and curing tooling will be procured this summer. 16

DOE Review of LARP – February 17-18, 2014 Backup Slides - Coil Size at Each Step 17

DOE Review of LARP – February 17-18, 2014 IL Winding and Curing 18 Midplane 760 µm (30 mil) = 3 layers 10 mil Mylar 250 µm (10 mil) 1.5 mm (60 mil) Curing Retainer 250 µm (10 mil) SS shim Curing Shell OR: mm IR: mm 250 µm (10 mil) Mylar µm (4mil) shrink wrap

DOE Review of LARP – February 17-18, 2014 OL Winding and Curing 19 Midplane OR: mm 760 µm (30 mil) = 100 µm shrink wrap µm SS Shim 250 µm (10 mil) 1.5 mm (60 mil) Curing Retainer 250 µm (10 mil) SS shim 250 µm (10 mil) SS shim

DOE Review of LARP – February 17-18, 2014 Coil Reaction µm (5 mil) MICA 125 µm (5 mil ) MICA 125 µm (5 mil) MICA 125 µm (5 mil) MICA Midplane 250 µm (10 mil) S2 glass 125 µm (5 mil) MICA 125 µm (5 mil) MICA

DOE Review of LARP – February 17-18, 2014 Coil Impregnation µm (6 mil) S2 glass 100 µm (4 mil ) Polyimide trace 150 µm (6 mil) S2 glass 100 µm (4 mil) Polyimide trace 250 µm (10 mil) MYLAR (mold released, removed after impregnation) 125 µm (5 mil) MYLAR (mold released, removed after impregnation) 125 µm (5 mil) G11 Midplane RTV (removed after impregnation)