ACS-R Optimization Campaign Dry Run: Status Report David Golimowski TIPS/JIM 19 March 2009.

Slides:



Advertisements
Similar presentations
Toolkit for testing CCD cameras
Advertisements

Controller Tests Stephen Kaye Controller Test Motivation Testing the controller before the next generation helps to shake out any remaining.
Transistors (MOSFETs)
Marianna Vaiman, V&R Energy
In situ testing of detector controllers Roger Smith Caltech
Design and Implementation a 8 bits Pipeline Analog to Digital Converter in The Technology 0.6 μm CMOS Process Eri Prasetyo.
Application of the SIDECAR ASIC as the Detector Controller for ACS and the JWST Near-IR Instruments Markus Loose STScI Calibration Workshop July 22, 2010.
CHARGE COUPLING TRUE CDS PIXEL PROCESSING True CDS CMOS pixel noise data 2.8 e- CMOS photon transfer.
Astronomical Detectors
DC Characterization of CCD-Based Detectors for Use in Multi-Chip Focal Plane Arrays SDW 2005 June 2005, R. PhilbrickBall Aerospace & Technologies Corp.
1D or 2D array of photosensors can record optical images projected onto it by lens system. Individual photosensor in an imaging array is called pixel.
Signal vs Noise: Image Calibration First… some terminology:  Light Frame: The individual pictures you take of your target.  Dark Frame: An image taken.
UVP BioImaging Systems Solutions for the Science of Life Digital CCD Cameras 101.
CCD and CCD readout : Engineering diagnostics during development, commissioning and operation Pierre Antilogus C. Juramy, H.Lebbolo, S. Russo, V.Tocut.
S. Baggett, J. Anderson, K. S. Long, J. W. MacKenty, K. Noeske, J. Biretta, and the WFC3 team (STScI) WFC3 : Understanding and mitigating UVIS charge.
AST3 detector properties
TIPS - October Updates on ACS-R Marco Sirianni October 18, 2007.
Pipeline calibrations of ACS data Max Mutchler Hubble Space Telescope Calibration Workshop October 2005.
ISUAL Long Functional Test H. Heetderks. TRR December, 20012NCKU UCB Tohoku ISUAL Long Functional Test Heetderks Basic DPU Function Verify Power on Reset.
Advanced Concepts & Science Payloads Office Eddicam/EST MeetingPage 1 CCD Procurement Schedule driven Review off-the shelf availability Specific mode of.
NGC 6217 in DSI mode with F658N Mosaic before new superbias why we don’t release images until after SMOV! ACS CCD monitoring and pipeline calibration review.
Electronics for PS and LHC transformers Grzegorz Kasprowicz Supervisor: David Belohrad AB-BDI-PI Technical student report.
D. Neff, expts done This report shows 2rh window origami (two rhodamine labeled staples/origami). Massud annealed and stored this origami at 4.
CCDs in space: the effects of radiation on Hubble’s Advanced Camera for Surveys (ACS) Max Mutchler, David Golimowski (Space Telescope Science Institute),
Analog to Digital conversion. Introduction  The process of converting an analog signal into an equivalent digital signal is known as Analog to Digital.
Data Acquisition Systems
Differential Amplifiers.  What is a Differential Amplifier ? Some Definitions and Symbols  Differential-mode input voltage, v ID, is the voltage difference.
Differential Preamp Stephen Kaye New Preamp Design Motivation Move preamplifier from controller to the Vacuum Interface Board (VIB) Amplifies.
CCD Detectors CCD=“charge coupled device” Readout method:
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Status FUV Detector “1-bounce design” NUV Detector HST aberration fully-corrected Calibration.
NIRSpec Operations Concept Michael Regan(STScI), Jeff Valenti (STScI) Wolfram Freduling(ECF), Harald Kuntschner(ECF), Robert Fosbury (ECF)
String-18 New-DAQ Commissioning Azriel Goldschmidt AMANDA Collaboration Meeting Berkeley, March 2002.
May 21, 2009John MacKenty, STScI1 WFC3 SM4 Events and Current Status.
10/26/20151 Observational Astrophysics I Astronomical detectors Kitchin pp
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 Boom Electronics Board (BEB) Engineering Peer Review Apr. 20, 2004 Hilary Richard.
ACS Drizzling Overview J. Mack; DA Training 10/5/07 Distortion Dither Strategies MultiDrizzle ‘Fine-tuning’ Data Quality Photometry.
Radiometric Correction and Image Enhancement Modifying digital numbers.
CDE CDR, September 14, 2004 Your Position, Your Name 1 GATS AIM Science Team Meeting January 23-24, 2007 CIPS Calibration Review, Aimee Merkel, Bill McClintock.
Brazilian Tunable Filter Imager (BTFI) Preliminary Design Review (PDR)‏ USP-IAG Universidade de São Paulo 18-19th June 2008 Julian David Rodriguez Javier.
TIPS/JIM 20 Aug ACS Status Update Norman Grogin (TIPS/JIM 20 Aug 2009) WFC Post-SM4 Performance Recap Day 174 Suspend : Determinations and Corrective.
D. Golimowski2010 STScI Calibration Workshop1 ACS after SM4: New Life for an Old Workhorse David Golimowski Space Telescope Science Institute 22 July 2010.
ACS-R Readiness Status Marco Sirianni TIPS - September
ACS STATUS Linda Smith (thanks to David Golimowski for providing the slides)
Alexei SemenovGeneric Digitizer Generic Digitizer 10MHZ 16 bit 6U VME Board.
UPDATED CTE CORRECTION FORMULAE FOR ACS Marco Chiaberge Pey Lian Lim, Vera Kozhurina-Platais, Marco Sirianni Ron Gilliland, Jennifer Mack.
Dec.11, 2008 ECL parallel session, Super B1 Results of the run with the new electronics A.Kuzmin, Yu.Usov, V.Shebalin, B.Shwartz 1.New electronics configuration.
1 TIPS May 17, 2007 WFC3 Ambient Calibration #2 Results H. Bushouse.
The WFPC2 WF4 Anomaly John Biretta 15 Dec Overview Discovery of the Anomaly Historical Evolution Imaging Impacts GO Science Impacts Image Repair.
TIPS - Oct 13, 2005 M. Sirianni Temperature change for ACS CCDs: initial study on scientific performance M. Sirianni, T. Wheeler, C.Cox, M. Mutchler, A.
Sensor testing and validation plans for Phase-1 and Ultimate IPHC_HFT 06/15/ LG1.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
Click to Change Title Here is a text box to present information in paragraph format, instead of bulleted lists. We’ve left space to the right for an image.
WFC3 SMOV Report for TIPS 16 July 2009 John MacKenty This presentation contains material that is embargoed until after the SM4 ERO press conference. Images/spectra.
The InGaAs IR Array of Chunghwa Telecom Laboratory Chueh-Jen Lin and Shiang-Yu Wang, Optics and Infrared Laboratory In 2006, Advanced Technology Laboratory.
February 21, 2002TIPS meeting1 "Data contained herein is exempt from ITAR regulations under CFR 125.4(13) -- data approved for public disclosure." TIPS.
Installation of the ACS Guido De Marchi – TIPS meeting – Guido De Marchi - ESA/STScI - ACS Group The ACS was installed on board the HST on the.
STIS STATUS Charles Proffitt TIPs May 21, STIS Status - Status of Repair Results of FT Amp B Bias Anomaly Changes to SMOV Plan.
M. TWEPP071 MAPS read-out electronics for Vertex Detectors (ILC) A low power and low signal 4 bit 50 MS/s double sampling pipelined ADC M.
Hawkeye CCD University
Application of a Charge Transfer Model to Space Telescope Data Paul Bristow Dec’03
Ivan Perić University of Heidelberg Germany
R&D activity dedicated to the VFE of the Si-W Ecal
Detectors of JWST Near IR Instruments
Σ-D Analog to Digital Converter for CMOS Image Sensors Nonu Singh (RIT, MicroE Co-Op) Background After fabricating an imaging sensor it needs to be characterized.
SIDECAR ASIC Characterization Dan Pontillo
Background Developed by Teledyne Scientific & Imaging, LLC
BESIII EMC electronics
Turning photons into bits in the cold
M. Kezunovic (P.I.) S. S. Luo D. Ristanovic Texas A&M University
SIDECAR ASIC characterization
Presentation transcript:

ACS-R Optimization Campaign Dry Run: Status Report David Golimowski TIPS/JIM 19 March 2009

ACS-R Flight Hardware During SM4 (EVA-3) four elements of the ACS will be replaced or modified: CCD Electronics Box Replacement (CEB-R) is the heart of the ACS-R hardware: it will control and read out the ACS WFC CCDs.

Schematic Diagram of CEB-R CEB-R features Teledyne SIDECAR* ASIC** that permits optimization of WFC performance via adjustment of CCD clocks, biases, and pixel transmission timing Built in oscilloscope mode (O-mode) allows sensing of analog signal from each output amplifier * System for Image Digitization, Enhancement, Control, and Retrieval ** Application Specific Integrated Circuit

Sample O-scope Image Reset Gate DSI output B Raw video B Raw video A

ACS-R Optimization Campaign Background: ACS-R Optimization Campaign (OC) in SMOV begins ~10 days after ACS-R installation and AT/FT 8 iterations over 24 days designed to optimize CCD read noise, dark current, CTE, full-well depth, linearity, cross-talk, and data transmission timing Bias, dark, flat, EPER, and subarray images taken at different gain, CDS modes (DSI and Clamp & Sample), and readout speeds. Teledyne and GSFC will analyze O-mode data; STScI will analyze image data.

Optimization Campaign Timeline Visits A and G (general performance tests) are executed in all iterations Visits B, C, D, E, and F optimize specific performance characteristics (settling times, clock coupling, voltages) and are not executed in all iterations Visits A, B, D, E, and F contain image data Visits B, C, and G contain O-mode data OC may be truncated at SMS boundary (currently between Iters 5 & 6)

ACS-R OC Dry Run Complicated technical and logistical issues demand Dry Run rehearsal of OC in February/March time frame    Completed yesterday! GSFC, Teledyne, and STScI participated GSFC configured EM-3 unit (CEB-R and LVPS-R) and Build-5 WFC in ESTIF Only first 4 iterations of the OC were simulated All iterations were SMS driven Dry Run dates and durations: Iteration 1: Feb hr SMS Iteration 2: Feb 23, Mar hr SMS Iteration 3: Mar 5-6, hr SMS Iteration 4: Mar 12-13, hr SMS

Dry Run Personnel Olivia Lupie, Steve Arslanian, Kevin Boyce, Rick Burley, Darryl Dye, Dennis Garland, Mike Kelly, Kathleen Mil, Barbara Scott, Beverly Serrano, Colleen Townsley, Augustyn Waczynski, Erin Wilson GSFC: ACS-R PI: Ed Cheng (Conceptual Analytics) Teledyne: Markus Loose, Raphael Ricardo STScI: David Golimowski, Linda Smith, Marco Sirianni (ESTEC), Carl Biagetti, George Chapman, Marco Chiaberge, Tyler Desjardins, Norman Grogin, Tracy Ellis, Pey-Lian Lim, Ray Lucas, Aparna Maybhate, Max Mutchler, Anatoly Suchkov (JHU), Mike Swam, Tom Wheeler

Dry Run Results (1) Iteration 1 : a bumpy start All performance and optimization tests executed to assess baseline Bias & clock voltages set for WFC#4 (Flight build) Problems found in several areas: 1) ESTIF: Lamp too bright (saturated data); “un-dark” biases and darks 2) SMS: No 1-min delay between changes of gain or CDS 3) OPUS: Crashes and incorrect keywords exposed outdated EUDL and CCDTAB reference files 4) FT: Mismatched gain/offset parameters; subarray readout problem Items 1-3 fixed for Iteration 2; FT issues now resolved Despite limited data, STScI correctly assessed read noise and limited full-well depth expected for non-optimal initial voltage configuration.

Dry Run Results (2) Iteration 2: General performance tests (A & G) and one optimization test (C) Bias & clock voltages set for WFC#5 (flight spare) Full-speed read noise e – (DSI); e – (C&S) Variable striation in bias images attributed to 1/f noise from MOSFET Lamp now too faint; full-well exposure not obtained Full-well depth raised to > 60K e – Bias offset for half-speed DSI frames too low; ADC saturated at low end High frequency vertical striping in half-speed, C&S A-amp bias frames Lack of hot pixels & cosmic rays preclude CTE and cross-talk tests

Iteration 2: Bias Frames Full speed, Dual-Slope IntegratorFull speed, Clamp & Sample

Iteration 2: Bias Frames Half speed, Dual-Slope IntegratorHalf speed, Clamp & Sample

Dry Run Results (3) Iteration 3: General performance tests (A & G) and 2 optimization tests (D and E) Bias & clock voltages set for WFC#5 (flight spare) Lamp brightness well matched to on-orbit cal lamp Full-well depth measured at nominal ~80K e – Visit D — Bias Voltage Optimization Test: Read noise lower, amp gains more consistent with  V OD =  V DD = +1 V Visit E — Clock Voltage Optimization Test: CTE too good for analysis software; need to improve algorithm Half-speed read noise e – (DSI); e – (C&S) DSI: ~0.5 e – better than full-speed C&S: significantly worse than full-speed

Iteration 3: Photon Transfer Test Full-well depth measured at nominal ~80K e – Gain = 2.3 e – /DN Excellent linearity

Dry Run Results (4) Iteration 4: General performance tests (A & G) and 2 optimization tests (C and F) “Up-linked” new default V OD and V DD for Iteration 4 Visit F — Science Data Transmission Optimization Test: Find optimal size and delays of bit transfers from CEB-R to MEB

Summary and Imminent Tasks Dry Run was extremely useful for testing analysis software, training analysts, verifying communication and data flow, and exposing bugs and features. STScI is well prepared to tackle “The Real Thing.” Need to verify and summarize analysis of all Iterations for Dry Run debrief Need to revise some analysis software with newly exposed flaws Rerun all data through OPUS to ensure proper keyword population Insert 1-extra day of analysis for each iteration into SMOV timeline SMSes take longer than expected to execute; data will come to us less promptly and frequently during OC; need more thinking time. Ensure that successful implementation of FT is captured in EVA-3 command plan Review of revised CP occurred yesterday; all proposed changes found to be in order and accepted.