Application of SRA for Pipeline Design Operation & Maintenance Andrew Francis Advantica Technologies ASRANeT, 2 nd Annual Colloquium, 9 th July 2001.

Slides:



Advertisements
Similar presentations
Joe Killins & Associates, LLC Pipelines & Risk Based Management How Safe is Safe?
Advertisements

Fracture Mechanics Overview & Basics
Crack Management – Part II Feedback From In-Service Inspections Based upon OTC “FPSO Fatigue Assessment: Feedback From In-Service Inspections” Clemens.
Materials Engineering Research Laboratory Ltd Tamworth Road Hertford SG13 7DG Tel.+44 (0) Fax+44 (0)
Binomial Random Variable Approximations, Conditional Probability Density Functions and Stirling’s Formula.
Calculation of rubber shock absorbers at compression at middle deformations taking into account compressibility of elastomeric layer. V. Gonca, Y. Shvabs.
1 Exponential Distribution and Reliability Growth Models Kan Ch 8 Steve Chenoweth, RHIT Right: Wait – I always thought “exponential growth” was like this!
1 Failure modes, effects and rates and remote maintenance/downtime Introduction –Failure is defined as the ending of the ability of a design element to.
Structural Reliability Analysis – Basics
Helicopter System Reliability Analysis Statistical Methods for Reliability Engineering Mark Andersen.
Unit 3: Solid mechanics An Introduction to Mechanical Engineering: Part Two Solid mechanics Learning summary By the end of this chapter you should have.
3-1 Introduction Experiment Random Random experiment.
Unit III Module 4 - Hard Time Task
PIPELINE ENGINEERING COURSES DISTANCE LEARNING 12 WEEKS DR. ESAM AM AL-MATOUQ.
Distribution of Defects in Wind Turbine Blades & Reliability Assessment of Blades Containing Defects Authors: Henrik Stensgaard Toft, Aalborg University.
DELIVERING SAFE & RELIABLE OPERATION
Pipeline Qra Seminar Title slide Title slide.
13.4. GENERAL DESIGN CONSIDERATIONS: PRESSURE VESSELS
Software Reliability Growth. Three Questions Frequently Asked Just Prior to Release 1.Is this version of software ready for release (however “ready” is.
Effect of finite size of component The SIF derived earlier is for cracks in an infinite body. However the finite size, geometry of the component, loading.
SCC DA Program Stress-corrosion-cracking direct assessment (SCCDA) is a structured process that contributes to pipeline company’s efforts to improve.
1 HPHT Equipment Development Process Presented by Jim Raney Based on the work from 6HP.
Engineering Doctorate – Nuclear Materials Development of Advanced Defect Assessment Methods Involving Weld Residual Stresses If using an image in the.
Definitions, Goals and Objectives
Fracture and Creep in the All-Tungsten ARIES Divertor
Software Reliability SEG3202 N. El Kadri.
API 6HP Process1 API 6HP Example Analysis Project API E&P Standards Conference Applications of Standards Research, 24 June 2008.
Application of the Direct Optimized Probabilistic Calculation Martin Krejsa Department of Structural Mechanics Faculty of Civil Engineering VSB - Technical.
Section 8.1 Estimating  When  is Known In this section, we develop techniques for estimating the population mean μ using sample data. We assume that.
High strength materials are being increasingly used in designing critical components to save weight or meet difficult service conditions. Unfortunately.
West Virginia University Towards Practical Software Reliability Assessment for IV&V Projects B. Cukic, E. Gunel, H. Singh, V. Cortellessa Department of.
M. Frize, Winter 2003 Reliability and Medical Devices Prof. Monique Frize, P. Eng., O.C. ELG5123/ February 2003.
1 Let X represent a Binomial r.v as in (3-42). Then from (2-30) Since the binomial coefficient grows quite rapidly with n, it is difficult to compute (4-1)
OPS - SCC Workshop R&D Past and Present December 2, 2003 Jerry Rau - Panhandle Energy.
STATISTICAL ANALYSIS OF FATIGUE SIMULATION DATA J R Technical Services, LLC Julian Raphael 140 Fairway Drive Abingdon, Virginia.
1 PED: equivalent overall level of safety PED Annex 1, clause 7: The following provision apply as a general rule. However, where they are not applied,
FRACTURE MECHANICS AND FATIGUE DESIGN HANS MF PANJAITAN Marinteknisk Senter Otto Nielsens Veg Trondheim Norway Mobile:
1 Probabilistic Scenario Analysis (PSA) 2 PSA -History In 1940’s - work on the atomic bomb In the 1950's - used as "what if" scenarios for nuclear proliferation.
Preparing for the Hydrogen Economy by Using the Existing Natural Gas System as a Catalyst // Project Contract No.: SES6/CT/2004/ NATURALHY is an.
ILLINOIS COMMERCE COMMISSION Darin Burk Manager – Pipeline Safety 1.
Managing Rotorcraft Safety During Frequently Performed Unique Missions September 28, 2005 AHS International Helicopter Safety Symposium 2005 Philip G.
1 TenStep Project Management Process ™ PM00.9 PM00.9 Project Management Preparation for Success * Manage Quality *
Mechanical Design of Process Equipment FUNDAMENTAL PRINCIPLES AND EQUATIONS Principal stresses Theories of failure
METAL LOSS IN-LINE INSPECTION SURVEYS LIMITS AND INACCURACIES.
I. M. DMYTRAKH and V. V. PANASYUK Karpenko Physico-Mechanical Institute, National Academy of Sciences of Ukraine 5 Naukova Street, Lviv, 79601, UKRAINE.
Mechanical & Aerospace Engineering West Virginia University Statistics of Brittle Fracture.
Trigonometric Equations OBJECTIVES: Use standard algebraic techniques to solve trigonometric equations Solve trigonometric equations of quadratic type.
IAEA International Atomic Energy Agency INTRODUCTION Module 2.
1 CHAPTER (7) Attributes Control Charts. 2 Introduction Data that can be classified into one of several categories or classifications is known as attribute.
DESIGN AND IN-SERVICE INSPECTIONS Guy BAYLAC Technical Advisor to EPERC TAIEX Workshop, Working Group 4 Bratislava – 12 April 2005.
SCC Management 16” Camas to Eugene 26” Sumas to Washougal.
Chapter 1 Introduction Concept of Stress. Road Map: Statics  Mechanics of Materials  Elasticity  Plasticity Fracture Mechanics Fatigue Creep Mechanics.
Bay Zoltán Foundation for Applied Reseach Institute for Logistics and Production Systems BAY-LOGI Assessment of crack like defect in dissimilar welded.
Pertemuan Ke-2. Reliability Function Reliabilty Function.
19-1 POD Is Not Reliability Reproducibility –Achieved by rigid calibration Repeatability –Achieved by rigid process control Capability –First principles.
ON “SOFTWARE ENGINEERING” SUBJECT TOPIC “RISK ANALYSIS AND MANAGEMENT” MASTER OF COMPUTER APPLICATION (5th Semester) Presented by: ANOOP GANGWAR SRMSCET,
Quantification of the reliability of flaw detection (NDT) using probability of detection (POD) based on synthetic data - Validation of the ultrasonic.
New Design Concepts for Aeronautical Applications by Friction Stir Welding Sergio M. O. Tavares Engineering Design and Advanced Manufacturing focus area.
DATA ANALYSIS: THEORY AND PRACTICE by Vicki M. Bier.
JCSS Model Code Fatigue, inspection and reliability
Turbo Power Life Prediction- Overview
Ignacio Aviles Santillana
TIME TO FAILURE AND ITS PROBABILITY DISTRIBUTIONS
Quality Risk Management
GE 6757 TOTAL QUALITY MANAGEMENT
Evaluating Non-Leak Threats
Updating the failure probability of miter
SR 1 and 2 Hay Point Fatigue Damage Structural Risk
Determination of Fracture Toughness
Hydrology and Precipitation (a review and application)
Presentation transcript:

Application of SRA for Pipeline Design Operation & Maintenance Andrew Francis Advantica Technologies ASRANeT, 2 nd Annual Colloquium, 9 th July 2001

INTRODUCTION l Uses of SRA l Wall thickness determination l Uprating l Life extension l Risk Based Inspection l Generally l Determination of required level of failure mitigation

Present Study l Failure Mode Fatigue Crack Growth l Uncertainty Construction Defect Depth l Mitigation Measures Construction process Weld Inspection Hydrostatic Test

Mitigation effects using Bayes Theorem l Conditional probability l p( X | Y ) is the probability of event X occurring given prior knowledge that event Y has already occurred p (X  Y) is the probability that both X and Y will occur before any prior knowledge has been obtained p ( Y ) is the probability that Y will occur before any prior knowledge is obtained

Construction Process l For a given weld constructed to an appropriate standard, the probability of having a defect of depth a is p(D) is the probability that the weld contains a defect and p(a) is the probability that the defect has depth a

Construction Process

Pre-Service Weld Inspection l Objective: To detect any defects, which are unacceptable according to the appropriate criteria l Issue: Inspection techniques often only 70% - 80% reliable, sometimes lower

Pre-Service Weld Inspection l We want to know probability, p(D  a | I) l Event I: Weld was inspected and no defect was found l Using Bayes Theorem

Pre-Service Weld Inspection l Probability, p ( I | D  a), that the weld was inspected and nothing was found given that the weld contains a defect of depth a is given by l PoD(a) is the probability of detection of a defect of depth a

Pre-Service Weld Inspection

l Probability of inspecting weld and finding nothing is given by

Pre-Service Weld Inspection Probability that the weld contains a defect of depth a, given that the weld was inspected and nothing was found is given by

Pre-Service Weld Inspection

Pre-Service Hydrostatic Test l Objective: To give assurance integrity of the pipeline prior to gassing up

Pre-Service Hydrostatic Test l We want to know the probability, P(D  a | H) l Event H: Survival of the Hydrostatic Test l Using Bayes Theorem

Pre-Service Hydrostatic Test l Now the probability p(H | D  a), that the weld survived the hydrostatic test given that the weld contains a defect of depth a is given by l H is the Heaviside step function defined by l a H is the depth of defect that would just fail under the hydrostatic test pressure

Pre-Service Hydrostatic Test l The value of a H depends on geometrical and material parameters and can be evaluated using fracture mechanics procedures such as BS7910 l Since geometrical and material parameters are subject to uncertainty, a H is also subject to uncertainty. This is not considered here for simplicity

Pre-Service Hydrostatic Test l Probability of surviving the hydrostatic test is given by

Pre-Service Hydrostatic Test l Probability that the weld contains a defect of depth a given that the hydrostatic test was survived is given by

Pre-Service Hydrostatic Test l Combining with effects of inspection leads to

Pre-Service Hydrostatic Test

Fatigue Crack Growth l Fatigue crack growth rate is dependent on the instantaneous defect depth, a, giving l Function f depends on stress intensity factor which is dependent on depth and the magnitude of the cyclic loading

Fatigue Crack Growth l Underlying assumption: the following continuity equation is satisfied: l This equation states that all defects which lie within the interval [a(t), a(t) +da(t)] at time t will lie within the interval [a(t+dt), a(t+dt) + da(t+dt)] at time t+dt

Fatigue Crack Growth

l Distribution at time t based on distribution at time of commissioning following inspection and hydrostatic test

Fatigue Crack Growth

Probability of Failure l Probability of failure in time interval[0, T] l a op is the defect size that would fail at the specified operating conditions

Probability of Failure

Conclusions l SRA & Bayes theorem used to systematically quantify effect of hydro test on construction defects taking account of inspection l An acceptable fatigue life may be achieved without any pre-service inspection if a hydrostatic test pressure of 105%SMYS is used.

Conclusions l If test pressure of 90%SMYS then pre-service inspection using a technique such as radiography or better is likely to be required. l If sophisticated TOF is used then may be possible to achieve an acceptable fatigue life without the need for a hydrostatic test. l Results are preliminary and further validation work required