Status report on MURAY telescope R&D

Slides:



Advertisements
Similar presentations
Wang Yi, Tsinghua University SoLID collaboration meeting, Status of MRPC-TOF 1 Wang Yi Department of Engineering Physics Tsinghua University,
Advertisements

NLC – The Next Linear Collider Project Colorado Univ. - Boulder Calorimetry Cornell-ALCPG Calorimetry Detector Study Plans at Colorado Uriel Nauenberg.
The “Shadow” of the Vesuvius 32 scintillator strips 0.5 m Opto-electronic connector to photo-multipliers WLS optical fibers The Basic Module Idea.
Mechanical Status of ECAL Marc Anduze – 30/10/06.
3/1/05 Status of the SHBD for the NUMI OPERA exposure D. Autiero IPN Lyon  Reminder about the proposed setup for the SHBD  Status of the sub-detectors.
The Design of MINER  A Howard Budd University of Rochester August, 2004.
The LHCb Inner Tracker LHCb: is a single-arm forward spectrometer dedicated to B-physics acceptance: (250)mrad: The Outer Tracker: covers the large.
Mauro Raggi Status report on the new charged hodoscope for P326 Mauro Raggi for the HODO working group Perugia – Firenze 07/09/2005.
Naba K Mondal, TIFR, Mumbai ICAL ( conceptual) INO Peak at Bodi West Hills Prototype ICAL at VECC 2mX2m RPC Test Stand at TIFR ASIC for RPC designed at.
The Transverse detector is made of an array of 256 scintillating fibers coupled to Avalanche PhotoDiodes (APD). The small size of the fibers (5X5mm) results.
Status of EIC Calorimeter R&D at BNL EIC Detector R&D Committee Meeting January 13, 2014 S.Boose, J.Haggerty, E.Kistenev, E,Mannel, S.Stoll, C.Woody PHENIX.
1 Coordinate Detector: prototype design The Coordinate Detector (CDET): Three independent vertical planes with 15 cm plastic shield in front, all planes.
CALICE Meeting DESY ITEP&MEPhI status report on tile production and R&D activities Michael Danilov ITEP.
20/10/2008A. Alici - ALICE TOF Festival1 Electronics and data acquisition of the ALICE TOF detector A.Alici University and INFN, Bologna.
VC Feb 2010Slide 1 EMR Construction Status o General Design o Electronics o Cosmics test Jean-Sebastien Graulich, Geneva.
Status of the NO ν A Near Detector Prototype Timothy Kutnink Iowa State University For the NOvA Collaboration.
1 CLAS12/Central Tracker review. Saclay 12/09 Stéphan AUNE Central Tracker review Micromegas central & forward tracker  R&D and prototypes  CAD implantation.
Mechanical Status of EUDET Module Marc Anduze – 05/04/07.
Cristina Lo Bianco - LLR Cosmics test for the W-Si prototype (CALICE) Why the test in cosmics? The cosmics test-bench DAQ for the cosmics test-bench All.
Fiber Tracker Update Edward McKigney Imperial College July 3 rd, 2002.
Scintillator tile-SiPM system development for CALICE Engineering AHCAL Prototype Michael Danilov, ITEP & CALICE LCWS10 Beijing March 2010 Outline New scintillator.
Design and optimization of Electromagnetic particle Detectors (EDs) in LHAASO-KM2A Xiangdong Sheng, Jia Liu, Jing Zhao on behalf of the LHAASO collaboration.
Scintillating Tiles for the Muon Inner regions LHCb Muon Upgrade meeting, CERN May Wander Baldini for the Ferrara LHCb group.
CLAS12-RICH Mechanical Design Status-Report CLAS12 RICH Review September 5-6 th 2013 S. Tomassini, D. Orecchini1 D. Orecchini, S. Tomassini.
STATUS OF MUV3 CONSTRUCTION A joint IHEP Protvino – Mainz – Pisa project MUV3  Proposed by Italo Mannelli: Thick scintillator tiles with direct light.
THE GAMMA-400 PROJECT Direct measurements of the primary gamma- radiation in the energy range 30 GeV – 1 TeV GAMMA-400 COLLABORATION: Lebedev Physical.
EUDET JRA3 ECAL in 2007 : towards “The EUDET module” C. de La Taille IN2P3/LAL Orsay.
CALICE / Silicon PM activities Detector and readout electronics development Development of a system for mass production of AHCAL “HBU” scintillator/PCB.
Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/10/20102.
D. M. Lee, LANL 1 07/10/07 Forward Vertex Detector Overview Technical Design Overview Design status.
Update on CHANTI F.Ambrosino, M.B. Brunetti*, F. Canfora*, T. Capussela**, D. Di Filippo, P. Massarotti, M. Napolitano, L. Roscilli, G. Saracino Università.
1. Efficient trigger for many B decay topologies Muon System CALORIMETERS PRS + ECAL+ HCAL RICH1 VERTEX LOCATOR Efficient PID Good decay time resolution.
SiD Muon Detector Progress. Overall concept 2 There are slots in the iron. We will insert modules of orthogonal strips of appropriate size into the slots.
FT Prototype Test Purpose: test the prototype of the FT Calorimeter and Scintillator Hodoscope Technique: prototype is installed under the Hall B photon.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
Strip-scintillator/Si avalanche photo-diode Muon System Fermilab Test beam + Inst INFN Udine APDs Notre Dame Scint /WLS Baseline: Resistive Plate Chambers.
Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/23/20102electro-mechanical.
1 Plannar Active Absorber Calorimeter Adam Para, Niki Saoulidou, Hans Wenzel, Shin-Shan Yu Fermialb Tianchi Zhao University of Washington ACFA Meeting.
7 october 20111T. Schneider Test bench for digital sensor New Philips Digital Light Sensor Outer dimensions 32.6*32.6mm 2 8*8 pixel array Pixel pitch 4*4mm.
Paul Rubinov on behalf of Gene Fisk, Kurt Krempetz 22 Aug 2012.
EMC BWE Proto18 - Orsay Meeting 1 PANDA EMC BWE Proto18 Mikel Catania Goikoetxea, Javier Navarro Medrano, David Rodríguez Piñeiro, Yue Ma, Frank.
Status of NEWCHOD E.Guschin (INR), S.Kholodenko (IHEP), Yu.Kudenko (INR), I.Mannelli (Pisa), O.Mineev (INR), V.Obraztsov (IHEP), V.Semenov(IHEP), V.Sugonyaev.
Upgrade of the MEG liquid xenon calorimeter with VUV-light sensitive large area SiPMs Kei Ieki for the MEG-II collaboration 1 II.
Baby MIND, Large Area Trigger Counters E. Noah WA105 General Meeting 21 January 2015.
1 Projectile Spectator Detector: Status and Plans A.Ivashkin (INR, Moscow) PSD performance in Be run. Problems and drawbacks. Future steps.
Status of Prototype Preparation (I) Wander Baldini On behalf of the Ferrara SuperB group SuperB Workshop, LNF Dic. 2-nd 2009.
Baby MIND Scintillator modules 11 November 2015 Revision E. Noah.
N. Anfimov a, V. Anosov a, I. Chirikov-Zorin a, D. Fedoseev a, O. Gavrishchuk a, N. Khovanskiy a, Z. Krumshtein a, R. Leitner b, G. Meshcheryakov a, A.Nagaytsev.
SiW Electromagnetic Calorimeter - The EUDET Module Calorimeter R&D for the within the CALICE collaboration SiW Electromagnetic Calorimeter - The EUDET.
R&D activities on a double phase pure Argon THGEM-TPC A. Badertscher, A. Curioni, L. Knecht, D. Lussi, A. Marchionni, G. Natterer, P. Otiougova, F. Resnati,
Marc Anduze – EUDET Meeting – PARIS 08/10/07 Mechanical R&D for EUDET module.
Prototype Assemblying, SiPM Characterization and QC
The dynamic range extension system for the LHAASO-WCDA experiment
The design of a photodetector unit of a new Shashlyk EM
IFR Detector R&D status
Wander baldini on behalf of the SHIP Muon Group
Roberto Calabrese Ferrara University and INFN
Experimental Method: 2 independent detectors on both sides of IP
ASTRI camera status Giovanni LA ROSA
EURONu Collaboration Board,
IFR Status Summary W. Baldini on behalf of the IFR Group
Status of Prototype Preparation and SiPM Characterization
Institute of High Energy Physics, CAS
GRPC activity for EuDHCAL in IHEP-Protvino
IHEP group Shashlyk activity towards TDR
Strawman module design
Tao Hu, Jianbei Liu, Haijun Yang, Boxiang Yu For the CEPC-Calo Group
IFR detector mechanics
OPERETTE TEST BEAM EXPERIMENT :
Experimental Method: 2 independent detectors on both sides of IP
Presentation transcript:

Status report on MURAY telescope R&D Pasquale Noli on behalf of Mu-Ray collaboration

Outline Motivation Measurement principles The MURAY telescope Fiber optical connector SiPM hybrid connector SiPM from IRST-FBK test Front End electronic and DAQ Conclusions 23/09/2010 SIF 2010 Bologna

Motivation 1631 eruption Pompei eruption Muon radiography: few hundreds m Seismic, gravimetric, electromag. methods: Several km Volcano-eruption dynamics mostly depend on the gas content the chemical composition of the magma the lava-conduit dimensions and shape. Traditional measurement methods : gravimetric seismological electromagnetic Have spatial resolutions of the order of several hundredmeters. Muonradiographycan improve resolutions by one order of magnitude. 50 300 200 Conduit length = 8000m Gas content = 5 wt% 20 1631 eruption Pompei eruption 100,000 ton/s 100 Simulated Mass eruption rate vs. Conduit 23/09/2010 SIF 2010 Bologna

Muon Radiography Muon radiography is based on the measurement of the absorption of cosmic muons inside matter. “The first application was realized in 1971 by Alvarez and collaborators for the search of unknown burial cavities in the Chephren pyramid.” In recent years Tanaka and collaborators, from University of Tokyo, have demonstrated the possibility to use this technique, to study the internal structure of volcanoes. The spatial resolution that can be obtained with this method is of the order of 10 m. 23/09/2010 SIF 2010 Bologna

Measurement principles (I) (No background hypothesis) The observed number of muons is a function of the muon flux crossing the volcano volume seen along the direction (,) the absorption factor A, and the detector efficiency  : In the limit of neglecting the  dependence of cosmic ray flux, the product of the muonflux times detector efficiency can be measured using special runs pointing to “free” sky region Then the absorption can be evaluated as: 23/09/2010 SIF 2010 Bologna

Measurement principles (II) Starting from the theoretical muon flux distribution f (Thompson and Whalley expression) , we compute the expected muon transmission rate through water meter equivalent for each  direction. For each (θ,) direction we can obtain the mean rock density from the ratio between: the water meter equivalent length relative to A. thickness of montain. . 23/09/2010 SIF 2010 Bologna

The MURAY telescope (I) Two 2x2 m2 X-Y stations Triangular shape scintillators (from Fermilab) Scint. light collected by WLS one-side mirrored fiber (BCF92 fast response fibers from Bicron) Dedicated 32 fibers optical connector Dedicated SiPM from FBK-IRST . They have 1.4 mm diameter and 70x70 mm2 cell size, with 292 cells in total Dedicated hybrid hosting 32 SiPMs SiPM temperature control by Peltier Cells SPIROC 0 ASIC FEE (from Orsay group) Dedicated read-out and acquisition board Expected performances: ≈3 mm space resolution (by measurement of charge sharing between two adjacent strips) ≈ 1ns time resolution O(10) W power consumption 23/09/2010 SIF 2010 Bologna

The MURAY telescope (II) 32 scintillator bars module (0.5 m large), with bars glued together and on a G11 fiberglass support plate 0.5 m Fibers’ connector 2 m SiPM hybrid connector 23/09/2010 SIF 2010 Bologna

The MURAY telescope prototype (I) A prototype is under construction 3 X-Y stations 1x1 m2 area SPIROC 1 ASIC FEE A special tool designed and built for precision assembly of the 32 bars in a plane 23/09/2010 SIF 2010 Bologna

Fiber optical connector A special connector (made of black Plexiglas) has been developed for high-precision positioning of the fibers in front of the SiPMs. 32 fibers are glued on the connector that will be fixed to the module chassis. The fiber connector is mechanically coupled with a hybrid circuit hosting the SiPMs. Al PROTOTIPE SIPM SIDE FIBER SIDE Al prototype O RING SEAT MAGNIFICATION OF THE GLUE TANKS Reference hole 23/09/2010 SIF 2010 Bologna

SiPM hybrid connector In order to optimize the cooling by Peltier cells, we decided to group together 32 die SiPM in a single PCB. One side of the Peltier cells is thermally in contact with the back side of the PCB. A rubber O-ring ensures light and air tightness. Two temperature sensors are located on the PCB for the Peltier cells control circuit. The first 5 hybrid PCB have been produced in Florence. 23/09/2010 SIF 2010 Bologna

First test on SiPM We studied the V break-down of the SiPM of first hybrid connector. 23/09/2010 SIF 2010 Bologna

Front End electronic and DAQ (I) Spiroc 1: we have 18 chips, enough for the 1x1 m2 prototype The FE board (Slave) and the trigger-DAQ board (Master) have been designed. The first prototypes have been realized and are under test. SLAVE MASTER 23/09/2010 SIF 2010 Bologna

Conclusions We are presently assembling the first MU-RAY prototype module The SiPMs produced at IRST-FBK are assembled on hybrid connector and are under test in Naples. A special optical connector with SiPMs and Peltiercooling has been designed and built. The readout electronics has been designed and is under test. 23/09/2010 SIF 2010 Bologna