Managing Landslide Hazard Risk in Sub Tropical Countries Keith Tovey

Slides:



Advertisements
Similar presentations
Numbers Treasure Hunt Following each question, click on the answer. If correct, the next page will load with a graphic first – these can be used to check.
Advertisements

AGVISE Laboratories %Zone or Grid Samples – Northwood laboratory
Accredited Supplier Communications Plan FY09-10 Q1 to Q4 May 2009, v2.0 Home Access Marketing & Stakeholder Engagement Team.
AP STUDY SESSION 2.
1
Feichter_DPG-SYKL03_Bild-01. Feichter_DPG-SYKL03_Bild-02.
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 6 Author: Julia Richards and R. Scott Hawley.
Author: Julia Richards and R. Scott Hawley
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
STATISTICS HYPOTHESES TEST (I)
Properties Use, share, or modify this drill on mathematic properties. There is too much material for a single class, so you’ll have to select for your.
UNITED NATIONS Shipment Details Report – January 2006.
Continuous Numerical Data
Whiteboardmaths.com © 2004 All rights reserved
1 RA I Sub-Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Casablanca, Morocco, 20 – 22 December 2005 Status of observing programmes in RA I.
Process a Customer Chapter 2. Process a Customer 2-2 Objectives Understand what defines a Customer Learn how to check for an existing Customer Learn how.
CALENDAR.
1 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt BlendsDigraphsShort.
Landslip Preventative Measures Development of the Hong Kong System
1 ENV-3A1Y/ENVF3A1Y: Natural Hazards: Landslide Hazards N.K. Tovey Н.К.Тови Landslide on Main Highway at km 365 west of Sao Paulo: August 2002.
Landslide Warning: Development of the Hong Kong System Major Landslide at Maracas, Trinidad - Late December 2002.
Chapter 7 Sampling and Sampling Distributions
1 Click here to End Presentation Software: Installation and Updates Internet Download CD release NACIS Updates.
Photo Slideshow Instructions (delete before presenting or this page will show when slideshow loops) 1.Set PowerPoint to work in Outline. View/Normal click.
Break Time Remaining 10:00.
This module: Telling the time
The basics for simulations
PP Test Review Sections 6-1 to 6-6
Bright Futures Guidelines Priorities and Screening Tables
EIS Bridge Tool and Staging Tables September 1, 2009 Instructor: Way Poteat Slide: 1.
1 Slides revised The overwhelming majority of samples of n from a population of N can stand-in for the population.
Insert the title of your presentation here Presented by Name Here Job Title - Date A reduction in fatal casualties Who, why and what does this mean? Louise.
Bellwork Do the following problem on a ½ sheet of paper and turn in.
Oil & Gas Final Sample Analysis April 27, Background Information TXU ED provided a list of ESI IDs with SIC codes indicating Oil & Gas (8,583)
Exarte Bezoek aan de Mediacampus Bachelor in de grafische en digitale media April 2014.
15. Oktober Oktober Oktober 2012.
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
1 RA III - Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Buenos Aires, Argentina, 25 – 27 October 2006 Status of observing programmes in RA.
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
1..
CONTROL VISION Set-up. Step 1 Step 2 Step 3 Step 5 Step 4.
Adding Up In Chunks.
MaK_Full ahead loaded 1 Alarm Page Directory (F11)
MOTION. 01. When an object’s distance from another object is changing, it is in ___.
1 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt Synthetic.
Model and Relationships 6 M 1 M M M M M M M M M M M M M M M M
Subtraction: Adding UP
Equal or Not. Equal or Not
Slippery Slope
: 3 00.
5 minutes.
1 hi at no doifpi me be go we of at be do go hi if me no of pi we Inorder Traversal Inorder traversal. n Visit the left subtree. n Visit the node. n Visit.
Analyzing Genes and Genomes
1 Titre de la diapositive SDMO Industries – Training Département MICS KERYS 09- MICS KERYS – WEBSITE.
Essential Cell Biology
Clock will move after 1 minute
Intracellular Compartments and Transport
PSSA Preparation.
Essential Cell Biology
Immunobiology: The Immune System in Health & Disease Sixth Edition
Physics for Scientists & Engineers, 3rd Edition
Energy Generation in Mitochondria and Chlorplasts
Select a time to count down from the clock above
Murach’s OS/390 and z/OS JCLChapter 16, Slide 1 © 2002, Mike Murach & Associates, Inc.
1 McGill University Department of Civil Engineering and Applied Mechanics Montreal, Quebec, Canada.
Aviation Management System 1 2  Silver Wings Aircraft Aviation Management System represents a functional “high – end” suite of integrated applications.
Landslip Preventative Measures Development of the Hong Kong System
Presentation transcript:

Managing Landslide Hazard Risk in Sub Tropical Countries Keith Tovey Reader in Environmental Sciences, HSBC Director of Low Carbon Innovation. University of East Anglia, Norwich, UK, NR4 7TJ Acknowledgements: British Council, University of East Anglia, University of West Indies (Trinidad) Hong Kong Government Major Landslide at Maracas, Trinidad - Late December 2002.

Managing Landslide Hazard Risk in Sub Tropical Countries Introduction Modelling Methods Engineering Models GIS Methods Statistical Methods Management Issues Conclusions

Landslides: Introduction Consequences of Landslides Injury Death Economic Loss Disruption to Transport Links Stability Assessment Landslide Preventive Measures Temporarily Safe Landslide Warning Landslide Design Cost Build Consequence Remedial Measures Remove Consequence Safe at the moment

Landslides: Removing the Consequence Manchester Main Manchester – Sheffield Road (A625) Alternative route – only suitable for light vehicles – gradient of 1 in 4 1 km

Landslides: Removing the Consequence Landslides in Kowloon East 28th - 31st May 1982

Landslide Landslides: Engineering Modelling Methods Geology Man’s Influence (Agriculture /Development) Geology Hydrology Material Properties (Shear Strength) Slope Angle Loading Stability Assessment Landslide Preventive Measures Temporarily Safe Landslide Warning Landslide Design Cost Build Consequence But only for specific slopes Remedial Measures Remove Consequence Safe at the moment

Landslides: Engineering Modelling Methods Applicable to very specific locations only Can have moderate to good accuracy for spatial predictions where information exists Moderate accuracy for temporal predictions (good if accurate ground water temporal variations are available) Poor for overall spatial coverage Is costly to implement. But one must not be complacent

berms Landslide in man made Cut Slope at km 365 west of Sao Paolo - August 2002

Landslides: GIS Modelling Methods Hydrology Geology Soil Type General Slope (and aspect) Land Use Cataloguing slopes and landslides Database of existing Landslides Classification into potential Areas of Risk Identification of areas for detailed Engineering Study General Planning Guidelines of Landslide Risk

Landslides: GIS Modelling Methods Good spatial (geographic) coverage of likelihood of landslides Poor to moderate prediction of precise locations of landslides Effective use of resources Poor accuracy for temporal predictions i.e. precisely when landslides occur Accuracy is dependant on existence of a good unbiassed database of landslides and slopes

Landslides: Categorisation of Slopes e.g. North Coast Road, Trinidad “Natural” Slope Cut Slope Fill Slope Retaining Wall

December 2004 – note the slide is much more extensive Landslide at Maracas December 2002 December 2004 – note the slide is much more extensive

3 km beyond Las Cuevas as seen on TV half of road blocked December 9th Landslide 3 km beyond Las Cuevas as seen on TV half of road blocked Landslide 11th December 2004 at approximately 13:00 1 km before Las Cuevas half of road blocked

Slope before failure at Couva Slope after Landslide Slide by Derek Gay, UWI

Landslides: GIS Modelling Methods: Requirements for the future Landslides triggered by anthropogenic activity Cut Slopes Fill Slopes Retaining Walls Hybrids: Cut/Retaining Wall / Fill/Retaining Wall “Natural” Slopes - is there a better word? slopes where there has been no anthropogenic activity, or where there is such activity it causes small changes to the geometry of the slope so that the Factor of Safety is largely unaffected. Deep seated landslide unaffected by anthropogenic activity

Landslides: Statistical Methods Historical Database of Landslide Occurrence Rainfall Data Research to correlate Rainfall with Landslide Incidence Antecedent Rainfall Current/ Predicted Rainfall Prediction of exactly when landslides are likely to occur Issue warnings to affected people Mobilise Emergency Teams Aim: to minimise injury and loss of life

Landslides: Statistical Methods Landslide Warning System Poor prediction for spatial location of Landslides. Potentially effective use of resources to minimise death and injury. Moderate ability to predict when landslides are likely to occur. Requires automatic recording of rainfall over short periods of time (e.g. 5 – 15 minute intervals). Requires a robust historic database of landslides and associated rainfall. Method aims to alert people to impending danger so they can seek safety during critical periods – it will not prevent landslides

Rain Gauge Network in Hong Kong Built Up Areas

Landslides: Management Hong Kong Approach Historically: Reactive Approach to Landslides Similar to present situation in Trinidad and Tobago From 1977 onwards: approach became progressively more pro-active Proactive Control of all New Developments > Engineering / Geotechnical Control Categorisation of Slopes and Landslides > Develop a Robust Database > Identify critical issues and areas affected: GIS > Planning Policies > Identification of Critical regions for Preventative Measures Development of Landslide Warning System.

Landslides: Management Click once on Slope to display data for 11SW-A/CR175 Slope Catalogue: Slope 11SW-A/CR175: Po Shan Road

Landslides: Management Centred Map for Cut Slope 11SW-A/CR175: Po Shan Road

Landslide Preventative Measure Feature Registration Form for Po Shan Road Slope 11SW-A/CR175 Major Disaster in June 1972 Landslide Preventative Measure

Landslides: Management Centred Map for Cut Slope 11SW-A/CR175: Po Shan Road

Landslides: Management Failure of slope in June 1972 Aerial Photograph of Slopes 11SW-A/CR175 and 11SW-A/FR30

Landslides: Landslide Warning System Requirements: It should: 1) provide sufficient warning of an event to alert general public to mobilise Emergency Services to open temporary Shelters 2) predict IN ADVANCE all serious EVENTS 3) minimise number of false alarms Three criteria can be in conflict: How long should warning be? Longer the time, the less accurate will be prediction – more false alarms

Landslides: Landslide Warning System Background to Warning System Two Approaches Detailed Warning - e.g. 1. Conduit Road Warning based solely on Rainfall automatic piezometer gives warning when ground water level gets above a critical level as determined by Slope Stability Analysis Aim to give warning when a significant number of landslides are likely to occur. (>10)

Landslides: Statistical Methods Landslide Warning System (continued) Research needed to correlate incidence of landslides with rainfall antecedent current predicted Hong Kong scheme ~ mid 1980s Research needed to adapt ideas to local conditions in Trinidad and Tobago. Emergency Services need clear guidelines on how to react. Reporting system needed to notify public (via radio/ television)

ANTECEDENT CONDITIONS. Are Slopes more susceptible to failure if there has been prolonged rainfall on preceding days? How should Antecedent rainfall Conditions be incorporated. Lumb (1975) - 15-day antecedent conditions. charts for Warning Purposes based both on Rainfall on Day AND Antecedent conditions. Most simple model uses simple cumulative 15-day antecedent rainfall. Could use a weighted system with days more distant weighted less. Lumb favoured simple approach.

Basis of Lumb’s Predictor 24 – hour criteria Cummulative Rainfall Cumulative Rainfall over previous 15 days 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Day

Rainfall Profile and Onset of Landslides Cumulative Rainfall 4 hours 20 hours Landslip Prediction Criteria (LPC) Landslip Time (LT) (The time when first landslip is reported to FSD). Warning Time (WT) (Rainfall predicted to reach LPC in 4 hours) Criteria Time (CT) The time when LPC are actually reached. Actual Cumulative Rainfall Predicted Cumulative Rainfall

First Landslide Warning System (1977 - 1979) AMBER and RED Warnings issued when predicted 24 hour rainfall would plot above relevant line. A Problem: Difficult to use without direct access to Chart.

Landslide Warning System 2: (1980 - mid 1983) Advantage: Much easier to identify whether WARNING should be called - even when chart is not to hand.

Landslide Event 28 - 29th May 1982 400 300 200 100 09 04 Landslide Warning: 1/82 Issued at 09:00 on 29/05/82 Landslides reported: Total: 223 Squatters: 107 Rainfall on Landslip Day (mm) 00 20 16 12 0 100 200 300 400 500 600 700 800 Antecedent Rainfall in previous 15 days (mm)

Landslide Event 28 - 29th May 1982 Even with 24hr day plotting, the plot for 29th May should have been as follows 400 300 200 100 Landslide Warning: 1/82 Issued at 09:00 on 29/05/82 Landslides reported: Total: 223 Squatters: 107 09 04 Rainfall on Landslip Day (mm) 00 20 16 12 0 100 200 300 400 500 600 700 800 Antecedent Rainfall in previous 15 days (mm)

Landslide Event 28 - 29th May 1982 Situation with running 24 hr criterion 400 300 200 100 09 04 00 20 16 12 Landslide Warning: 1/82 Issued at 09:00 on 29/05/82 Landslides reported: Total: 223 Squatters: 107 Criterion was reached at approx 03:00 BUT 1st Landslide was reported at 02:00 when rainfall was about 220mm Rainfall on Landslip Day (mm) Even if Warning procedure has been operated correctly, warning would have been 1 hour too late! 0 100 200 300 400 500 600 700 800 Antecedent Rainfall in previous 15 days (mm)

Antecedent Rainfall in previous 15 days (mm) All Landslide Warning Incidents in 1982 400 300 200 100 09 04 00 20 16 12 Landslide Warning: 1/82 Issued at 09:00 on 29/05/82 Landslides reported: Total: 223 Squatters: 107 20 16 12 08 04 00 20 16 12 16 12 08 04 LW 5/82 05:50 – 16/08/82 Total: 98 Sq: 32 LW 2/82 06:15 – 31/05/82 Total: 91/ Sq: 40 LW 7/82 23:52 – 16/09/82 Total: 3 Sq: 3 00 LW 4/82 11:00 – 03/08/82 Total: 9 Sq: 5 LW 6/82 06:35 – 18/08/82* Total: 8 Sq: 2 16 06 LW 3/82 11:00 – 02/06/82* Total: 28/Sq: 12 16 0 100 200 300 400 500 600 700 800 Antecedent Rainfall in previous 15 days (mm)

Performance of All LandSlip Warnings 1982 - 1983 Red Landslides with No Warning! Green Landslide Warnings with Several Hours Warning Blue Landslide Warnings with 1 Hour Warning

All Rainstorm Events: Daily Rainfall vs Antecedent Rainfall Criteria for low antecedent rainfall reduced to conform to actual 1st landslide in Event 1/82 Disastrous > 50 reported Landslides: Severe 10 - 50 Landslides Minor < 10 Landslides : Null Event: No reported Landslides

Landslide Warnings: The Problems 1. Antecedent Condition leads to confusion - (Incident 1/82) 2. Must use rolling 24 hour scheme 3. Previous Analysis (e.g. Lumb) has been based on 24 hr day basis 4. Total Rainfall in day will not generally be a good correlator as final cumulative 24 hr rainfall (whether day or rolling) will occur AFTER Landslides have occurred. 5. Some Landslides Events will occur after very low Antecedent Rainfall 6. Some Landslides Events occur after short periods of very intense rainfall. 7. It is difficult to predict with accuracy future rainfall. Is it sensible to continue with Antecedent Rainfall Condition??

Severe and Disastrous Landslide Events: with 1984 Scheme Existing Criteria Line - in use mid 1982 - mid 1984 Warning and Landslide Lines in use from mid 1984

Landslides: Landslide Warning System Landslide Warnings: The Final (1984) Approach 1. Abolish Antecedent Criteria - base solely on Rolling 24hr approach. 2. When Rainfall exceeds 100 mm in a period of 24 hours and is expected to exceed 175 mm (total) within 4 hours: CONSIDER issuing a LANDSLIDE WARNING. If weather conditions suggest that Rainfall will cease shortly then issue could be delayed. 3. If Rainfall exceeds 175 mm then Landslides are likely and Warning should now be issued regardless of whether rain is likely to cease shortly 4. Landslide Warning should be issued regardless of above if rainfall in any one hour exceeds 70 mm in any one hour in Urban Area.

Landslides: Landslide Warning System The 1984 Warning Scheme Simple to understand On average ~ 0 - 7 Warnings in a Year up to one third are false alarms identifies all serious/disastrous events about one third of warnings classified as minor (i.e. less than 10 landslides). Further Improvements were introduced in 1999

Landslides: The Way Forward the Engineering Approach is justified in a few cases New developments / highways etc GIS methods are powerful and cost effective BUT Requires development of a robust Database Catalogue of Slope Types (whether failed on not) Catalogue of Landslides Trinidad and Tobago (Carribean) can build on an improve on the scheme developed in Hong Kong. Research needed to enhance GIS prediction of landslides Incorporate Geotechnical information

Landslides: Conclusions Interdisciplinary Research incorporating all three approaches is important for effective management of slopes and mitigation of adverse effects of landslides. Proactive Management of slope hazards will be more cost effective in the long term. Hong Kong woke up to the seriousness of the issues following disastrous landslides in 1972. Caribbean Countries should learn from their experience. Important to begin and resource fully the research needed to achieve these aims.