APRPP review committee 24oct13 Telescope status 2013 APRPP review committee Phil Perillat.

Slides:



Advertisements
Similar presentations
Get. through back much go good new write out.
Advertisements

Hardware Integration of the Prototype Wes Grammer NRAO September 24-26, 2012EOVSA Prototype Review1.
ESLS 04 Daresbury Laboratory
Summary of 74 MHz Test with “Power Down” at Parkes Site ( ) New Data file: _1120_z20s.rpf (apparently no matched load data taken this.
RMM Systems, LLC By Sam Rietta RMM Systems, LLC is a manufacturer's representative firm focused on providing value added sales solutions by providing.
BEPCII RF POWER SYSTEM RF group, IHEP Sep ~ April 1.The 1 st transmitter had finished installing,commissioning and SAT (Site Acceptance Test).
CABB Observations Preparations and Observing Mark Wieringa.
CALICE WHCAL testbeam at SPS H8 27 sep – 03 oct: 6 days for energies up to 180 GeV (+ polarity)
NAIC AUSAC Meeting – April 19-20, 2010 Telescope and Datataking status 2010 Visiting Committee Meeting Phil Perillat.
AOUC committee 03APR14 Telescope status & RFI 2014 AOUC committee Phil Perillat.
NAIC AOUC Meeting – April 25-26, 2012 Telescope and Datataking status 2012 Visiting Committee Meeting Phil Perillat.
3mm amplitude test by Cheng-Jiun Ma. Observation Source : Orion SiO Frequency: GHz 256 channels within 64MHz bandwidth Ant 3 & Ant 4 no Tsys correction.
SIW 2003 The antenna element Ravi ATNF, Narrabri 1.The role of the antenna in a Fourier synthesis radio telescope 2.The Compact array antenna.
Teachers workshop 21feb09 arecibo observatory The Arecibo radio telescope 2009 teachers workshop Phil Perillat.
Exploring Events. Try this Start Alice and create a blank world using the grass template. Add an instance of a BlueBallerina. Add an instance of a PinkBallerina.
NAIC Visiting Committee Meeting · February 19-21, 2007 Telescope Performance 2007 Visiting Committee Meeting Phil Perillat.
1 Calice Analysis Meeting 13/02/07David Ward Just a collection of thoughts to guide us in planning electron analysis In order to end up with a coherent.
PHYS16 – Lecture 36 Ch. 15 Oscillations Xkcd.com.
PH 105 Dr. Cecilia Vogel Lecture 2. OUTLINE  Mechanics  Force  Pressure  energy  power  Oscillation  period  frequency  amplitude.
1 Live Sound Reinforcement Audio measurements. 2 Live Sound Reinforcement One of the most common terms you will come across when handling any type of.
Tent Update 5 Feb 2008 Matt Durham for tent crew.
High Frequency Words The second 100 get through.
Advanced MWA tile beam models Randall Wayth – ICRAR/Curtin University.
Arizona Superintendent of Public Instruction John Huppenthal Fixing the ADE Computer System to Improve Student Achievement.
Spectral Line Calibration Techniques with Single Dish Telescopes K. O’Neil NRAO - GB.
Michigan/MIKE Fiber System (MMFS) – Update Apr 2005.
1 CIRCULAR MOTION 2  r s IN RADIANS length of the arc [ s ] divided by the radius [ r ] subtending the arc.
GBT Spectral Baselines – Tuesday, 11 March 2003 GBT Spectral Baseline Investigation Rick Fisher, Roger Norrod, Dana Balser (G. Watts, M. Stennes)
Puerto Rican Spectrum Users Group Sept 23, 2010 Living with RFI at AO (aka rfi snooping) Puerto Rican Spectrum Users Group 23sep10 meeting Phil Perillat.
ALFA Surveys Workshop: december 2009 CIMA STATUS Rfi update 2009 ALFA Surveys Workshop Phil Perillat.
NAIC AUSAC Committee Meeting · March Telescope Performance and Datataking 2009 AUSAC Committee Meeting Phil Perillat.
NAIC Visiting Committee Meeting February 15-16, 2005 Telescope Performance Pointing the telescope. Gain curves for all receivers Recent high frequency.
Spectral Line Calibration Techniques with Single Dish Telescopes K. O’Neil NRAO - GB.
Background and Status of the Water-Vapour Radiometer at Effelsberg A. Roy U. Teuber R. Keller.
NanoBPM Signals Second Mini-Workshop on Nano Project at ATF December 11-12, 2004 Toyoko Orimoto Yury Kolomensky Lawrence Berkeley Laboratory & University.
US SKA TDP DVA-1 June 28-29, 2012Dish Verification Antenna No. 1 Critical Design Review, Penticton, BC Overview Of DVA-1 Optics Lynn Baker Bill Imbriale.
RFI2010, March Groningen R. Ambrosini et al. 1 Roberto Ambrosini IRA-INAF “Old” hints to mitigators from the latest RFI.
NAIC Visiting Committee Meeting · April Telescope Performance and Datataking 2009 Visiting Committee Meeting Phil Perillat.
Car Audio Systems. Car Audio Install: FAIL What you need to know! Speakers Subwoofers Tweeters Amplifiers Crossovers Head Units / Receivers Installation.
The Telescope (pointing) Pointing background Current pointing errors. Some problems with pointing. Can we point during the painting project. For more info:
LASER CALIBRATION SYSTEM for STAR TPC Alexei Lebedev (BNL) for STAR collaboration  Design and description  Performance  Goals and results  Future developments.
AGS/Booster Status March 11, 2014 Time Meeting Haixin Huang.
5 July 2010Ivo Polák, FZU, Prague LED notched fibre distributing system Calibration system for SiPM Ivo Polák, Ji ř í Kvasni č ka
Reflector Antennas Antenna and Microwave Laboratory In the name of God
7 November 2003 Status of CNGS NBI presented by K. Elsener 1 Status of CNGS Konrad Elsener CERN – Accelerators+Beams Division.
AUSAC Meeting 9-10 March 2009 RFI & Spectrum Management Murray Lewis.
LCLS LLRF System October 10-13, 2005 LLRF05 B. Hong, R. Akre, A. Hill, D. Kotturi, H. Schwarz SLAC, Stanford, Menlo Park, CA 94025, USA Work supported.
System Performance Metrics and Current Performance Status George Angeli.
ALFA Installation & Status Steve Torchinsky GALFA Meet3, Arecibo August 29, 2004.
AOUC committee 30apr15 RFI issues at AO 2015 AOUC committee Phil Perillat.
AUSAC Meeting March 2-3, 2005 Telescope Performance Pointing the telescope. Gain curves for all receivers Reflector alignment Recent high frequency results.
MICE Target Failure UKNFIC Meeting Adam Dobbs - when and why 4 th July 2008.
Rick PerleyEVLA Feeds CDR 17 February Performance of the L-Band Feed Rick Perley.
The inference and accuracy We learned how to estimate the probability that the percentage of some subjects in the sample would be in a given interval by.
1 Chapter 8 Operational Amplifier as A Black Box  8.1 General Considerations  8.2 Op-Amp-Based Circuits  8.3 Nonlinear Functions  8.4 Op-Amp Nonidealities.
An H- stripping laser using commercial, diode-pumped Nd:YAG amplifiers Russell Wilcox Laser Stripping Workshop, April 11, 2011.
Cosmic Microwave Technology, Inc.
LED notched fibre distributing system Calibration system for SiPM
Stringing your car to determine wheel alignment is decidedly old school, but it's also effective, efficient and cheap. Begin by placing your car in a level.
2015 NanoGrav meeting Phil Perillat
Discussion today Using Lumerical INTERCONNECT we will simulate a full 50Gbps (25Gbps X 2) 2-channel WDM optical link. Today we will look at the following:
HERA Imaging and Closure
Linear Motion Earth spins on axis at 700 mph Are you moving?
Telescope Performance and Datataking
2015 AOUC committee Phil Perillat
LGS Project Meeting December 21, 2006 Agenda SWIFT update - A. Bouchez
©G Dear 2008 – Not to be sold/Free to use
Imperial laser system and analysis
TIMELINE NAME OF PROJECT Today 2016 Jan Feb Mar Apr May Jun
Main Linac Beam Optics and Tolerances
Presentation transcript:

APRPP review committee 24oct13 Telescope status 2013 APRPP review committee Phil Perillat

APRPP review committee 24oct13 Talk Outline Timeline of some events during 2013 Performance: Gain,Tsys,SEFD, surface error. Pointing error. Issues. RFI: Misc: Online:  oct13_aprpp

APRPP review committee 24oct13 Timeline of some events DateEvent 01apr13Remy carsr radar up. (1269,1274),(1327,1332) 12jul13Dome drag link comes loose. 25jul13Testing ao19 on telescope 01aug13Sbn 1 st stage amps fried by xmter (shutter bypassed) 05aug13430 dome turnstile junction damaged. Replaced with old one. 08aug13Faa carsr radar up (1252,1257),(1344,1349) 17sep13430 dome polA cavity filter repaired.

APRPP review committee 24oct13 Gain and pointing error vs az,za Data from calibration runs jan13 to oct13 Use selected frequencies: lbw,sbn,cb,cbhi,xband Gain, pointing errors vs za. Gain falloff za > 15 is spillover Gain, pointing errors vs az Az shows gain drop off for high frequencies. Could be: Td 4 losing tension Platform tilt (but don’t see 180 deg symmetry). Dish motion caused by southeast fill area.

APRPP review committee 24oct13 Gain,Tsys, SEFD vs freq Limit za 5-15 deg (spillover,collimation) Spread in value from az,za variation Gain,Tsys depend on accurate cal values SEFD (Tsys/Gain) only depends on srcFlux. 430 had tsys problems from cavity filter. SEFD variation cbh,xb coming from gain, not Tsys. Use gain vs freq to measure surface errror.

APRPP review committee 24oct13 Gain vs Freq:ruze curves

APRPP review committee 24oct13 Pointing error Arrow plot of pointing errors Length of error is pnt error (1tick=10asecs) Direction of arrow is error direction Color is frequency/receiver Rms pointing error by freq/receiver Dips are freq with few measurements Gain loss from pointing error assumes gaussian Remember:Rms error is only 68% of the time

APRPP review committee 24oct13 Issues: performance Distomats need to be replaced. Current distomats no longer available and they are starting to fail. Possible replacements make rfi. We need to start surveying the optics again. Horns, tertiary, secondary, dome position. Would be great if we could continually monitor the position of the dome with an automated theodolite (could replace distomats) We also need to learn to use or rewrite lynn bakers old programs to analyze the data. Dome is still over weight.

APRPP review committee 24oct13 RFI: CARSR radars CARSR (Common Air Route Surveillance Radar) are replacing the FAA and Punta Borinquen radars. Rfi from hilltop monitor spectrum 22oct13 00:00 thru 10:00 shows: Unblanked FAA Radar Blanked punta borinquen radar The FAA radar is probably weaker than the punta borinquen radar because it is shielded by some hills and it is twice the distance. Faa radar should start blanking soon… RadarFreqBandwdDuty cycle Sector BlankingDist nmi Old FAA1330, Mhz.5%no57 CARSR FAA , , Mhz chirped 9%Yes (but not yet) +/-2 deg 57 Old Punta Borinquen 1270 or Mhz.5%no24 CARSR PuntaBor , , Mhz Chirped 9%Yes (01oct13) +/- 2 deg 24

APRPP review committee 24oct13 Dome drag link comes loose On 12jul13 one of the 4 drag links on the dome came loose. The drag links connect the motors to the dome The drag links only pull,push the dome. They do not support the dome’s weight. The small cotter pin probably snapped (from play in the drag link). Eventually the pin came loose on one side and bent the connection plate. Fix: New plates and drag links were constructed. The cotter pin was replaced with something that won’t break.

APRPP review committee 24oct13 Any questions?