Take 5 for Safety E. Lessard April 1, 2014. Radiological Posting Issue Summary  Accelerator Posting of Enclosures: Post for beam-off or non-fault conditions.

Slides:



Advertisements
Similar presentations
Safety Software QA at BNL’s Collider-Accelerator Department (C-AD) Accelerator Safety Workshop E. Lessard Collider-Accelerator Department August 12-14,
Advertisements

EMPLOYEE GRIEVANCE POLICY SUMMARY FACTS Goals of the Employee Grievance Policy: Provide procedural consistency across the agencies and universities of.
Facility Authorization Basis at BNL Safety Photos of the Week Collider-Accelerator Department Take 5 for Safety.
The Midhurst Ratepayers Association Delegation to Springwater Township Council April 16,
Grant Writing 101 Carla Littlefield August 20, 2013.
Credited Controls at C-AD Photo of the Week E. Lessard Collider-Accelerator Department Take 5 for Safety.
ODH Fans and Work Planning Protecting Against the Big Event 10 Questions Before Starting a Job at C-AD Photo of the Week Collider-Accelerator Department.
School for drafting regulations Nuclear Safety Decommissioning Vienna, 2-7 December 2012 Tea Bilic Zabric.
LCLS Transition to Science DOE Status Review of the LUSI MIE Project LCLS NEH ARR John Arthur LCLS Experimental Facilities Division August 11, 2009 Welcome.
Arithmetic with integers (Day 1) Add, subtract, multiply, and divide.
Bully Free Freshman Class Session 3 Today all students will: Discuss reasons bullying must be stopped. Discuss the concepts of community and unity and.
Grant Writing/Comprehensive Workshop Paul R. Albert, Ph. D
Sandia National Laboratories is a multi-program laboratory managed and operated by Sandia Corporation, a wholly owned subsidiary of Lockheed Martin Corporation,
USDA regulations require that "all individuals working in or frequenting any portion of a radiation area shall be informed of the location of radioactive.
Posting of Accelerator Enclosures Vashek Vylet and Keith Welch DOE Accelerator Workshop SLAC, August 17 – 19,
Protecting Number Resources Draft Policy Advisory Council Shepherds: Marc Crandall Scott Leibrand.
NFPA 70E - Awareness Training1 NFPA 70E Standard for Electrical Safety in the Workplace Article 130.7(C)(1-7) – Personal Protective Equipment.
Accelerator Safety Workshop SLAC John Blaikie Health Physics Program Manager – SC Office of Science, U.S. Department of Energy Access Control and.
Welcome! 2008 DOE Accelerator Safety Workshop. Speakers Please pre-load your talk during break prior to your presentation See Cynthia for assistance.
1 BROOKHAVEN SCIENCE ASSOCIATES Part 851 & Vacuum Systems W.R. Casey NSLS-II Project Brookhaven National Laboratory August 12, 2008 Office of Science Accelerator.
SUMMARY OF INFORMAL COMMENTS Temporary Waiver of Terms Regulations May 2006.
THE PRACTICUM AND THE MASTER'S PAPER. April 11, 2014.
Small Modular Reactor Licensing Design Specific Review Standards 11/29/20121 Joseph Colaccino Acting Deputy Director Division of Advanced Reactors and.
Establishig a national Rn program Mark Brennock, Murray Consultants, Ireland Communicating with decision makers The Irish experience.
Release of Materials from Accelerators Accelerator Safety Workshop E. Lessard Collider-Accelerator Department August 12-14, 2008.
Executive Session Director’s CD-1 Review of the Mu2e Project April 3, 2012 Elaine McCluskey.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Edward T. Lessard ESHQ.
Threats, Challenges, and Opportunities Taking the Long-Term Perspective for Wildland Fire Management.
ASO Revision Key Discussion Topics Session A. Key Topics Equivalencies/Exemptions Responsibilities Definitions –USI CRD content and structure.
Critical Thinking Lesson 8
September 19-20, 2007 E. Lessard EBIS Safety EBIS Project Safety Ed Lessard September 19-20, 2007 DOE Annual Review.
Health Delivery Services May 29, Eastern Massachusetts Healthcare Initiative Policy Work Group Session 2 May 29, 2009.
ITSS Conference 2007 ICT Strategy Programme Update almost there… Paul Jeffreys
NASPA Faculty Council Online Faculty Forum Monday, November 30, 2015 Welcome Audio: To mitigate background noise and reverberation in the system, all participant.
J. Donald Cossairt Fermi National Accelerator Laboratory Batavia, IL Operated by Fermi Research Alliance, LLC under Contract No. DE-AC02-07CH11359 with.
Update on DOE Nuclear Materials Management Dale Dunsworth Office of Nuclear Materials Integration (NA-58)
January 4, 2007 RHIC II Project Internal Cost Review Ed Lessard ESH D R A F T Project Overview.
Accelerator Safety Workshop SLAC John Blaikie Health Physics Program Manager – SC Office of Science, U.S. Department of Energy Access Control and.
March 2010 – IAASB to consider issues paper and task force proposals June 2010 – IAASB first read of exposure draft (prior to next IESBA meeting) September.
Accelerator Safety Workshop SLAC Scott L. Davis Accelerator Safety Program Manager – SC Office of Science, U.S. Department of Energy Summary and.
ASO Revision Key Discussion Topics Session A and Session B Follow-up.
RER/9/111: Establishing a Sustainable National Regulatory Infrastructure for Nuclear and Radiation Safety TCEU School of Drafting Regulations November.
Notebook Page What are 5 renewable natural energy resources? 2. What is a lobbyist? 3. How do you think lobbyists affect the total amount of natural.
Slide 1/5 Safety of Operations Jefferson Lab operates the accelerators in accordance with the Accelerator Safety Order, DOE O 420.2B, guided by DOE G
Program Manager’s Review Name of Program: Radiation Protection Field Operations Group Program Manager: Jim Allan Date: 19 September 2005.
Accelerator Safety Order Revision Process Frank Kornegay, ORNL SNS Dennie Parzyck, DOE FSO.
English 100 Tuesday, and Wednesday, On a sheet of paper, write about the following prompt… you will keep this in your notebook: Education.
MHA Receipt & Scrutiny Training for Qualified Nurses & MHPs Presented by: Sharon Long Deputy MHA Manager Version 1.
Audits & DOE Walkthroughs ISO and OHSAS surveillance audits August 18 th – 20 th –CD, ESH&Q, and FESS organizations to be audited Software.
BOARD MEETING Lethbridge School District No. 51 POLICY SEXUAL ORIENTATION, GENDER IDENTITY AND GENDER EXPRESSION.
Ray Karol 2/26/2013. Annual Audit Next week BNL is conducting the annual internal assessment of our environmental and safety programs and compliance assessments.
PIP-II Environment, Safety, Health & Quality Assurance Strategy John Anderson Jr. DOE Independent Project Review of PIP-II 16 June 2015.
SEC 330 mart Expect Success/sec330martdotcom FOR MORE CLASSES VISIT
Radiation Protection Standards for Prompt Radiation Don Cossairt, Radiation Protection Manager, ESH&Q Section October 1, 2013.
NRC’s 10 CFR Part 37 Program Review of Radioactive Source Security
Update on the Latest Developments in Government Auditing Standards
Proposed Revisions to 10 CFR Part 61
FDA’s IDE Decisions and Communications
The European Strategy for Particle Physics
Safeguards- Feedback on Safeguards ED-2 and Task Force Proposals
NRC Export and Import Licensing 10 CFR Part 110
SEC 330 Education for Service-- snaptutorial.com.
SEC 330 Teaching Effectively-- snaptutorial.com
Background (history, process to date) Status of CANs
EMPLOYEE GRIEVANCE POLICY SUMMARY FACTS
Revisions to the Concentration Averaging and Encapsulation Branch Technical Position A. Christianne Ridge Division of Decommissioning, Uranium Recovery,
Accelerator Safety Workshop SLAC
How to write good. How to write good Background: Reading Read the papers. Then read them again. Then again. Write out the structure of the paper. If.
Accelerator Safety Workshop SLAC
The Transport standards
Presentation transcript:

Take 5 for Safety E. Lessard April 1, 2014

Radiological Posting Issue Summary  Accelerator Posting of Enclosures: Post for beam-off or non-fault conditions SC community argues enclosures or beams are “inaccessible” during operations, therefore posting for beam-on or fault conditions not required Accepted practice over last 15 years SC labs assume they are in compliance with 10CFR835 2

Posting – Significant Issues (HMI, Cost, Up/Down Posting, Etc.)  10CFR835 §835.2 Controlled area means any area to which access is managed by or for DOE to protect individuals from exposure to radiation and/or radioactive material  § Controlled areas Each access point to a controlled area (as defined in § 835.2) shall be posted whenever radiological areas or radioactive material areas exist in the area…  § Radiological areas and radioactive material areas Each access point to radiological areas and radioactive material areas (as defined at § 835.2) shall be posted with conspicuous signs bearing the wording provided in this section… 3

Radiological Posting Issue Summary  10CFR835 does not define accessible or inaccessible  Current DOE Accelerator Guide – contains weak statement on accessibility  New (draft) Guide – Explicitly addresses stance on accessibility/posting  DOE General Council (GC) non-concurred on accessibility/posting language in new (draft) Guide 4

ISSUE: How Best To Respond To GC Non-concurrence On Draft Guide?  Background - Much has been said and written about accelerator posting issue over last 3 years JLAB – HSS threatened violation, but withdrew prior to issuance (2011) ASW 2011 sessions w/GC and HSS, White Paper, etc. Discussions between General Council, SC, and Joe McBrearty (DOE Deputy Director for Field Operations) NNSA is not supportive (LANL, SANDIA up/down post)  New (draft) Guide – needed, supported by SC and NNSA, in use for many practices (ARR, ASE, USI) 5

Option 1 – Attempt To Retain Current Language  Strategy C-AD management motivates BNL DDO Jack Anderson to action Jack Anderson coordinates with other SC COOs COOs lobby McBrearty McBrearty motivated to confront General Council McBrearty takes Guide to impasse process, wins impasse decision 6

Option 2 – Remove Paragraph From Draft Guide – Go Mute  Option 2a - Wait and See SC Accelerator Community believes we are in compliance with 835 Don’t fight issue now – wrong forum, heels dug in Fight the battle when/if we are challenged Inform COOs Prepare for challenge Unify SC Accelerators – agree to approach  Option 2b – Pursue BNL exemption from 835  Option 2c – Pursue programmatic exemption – Some in SC have expressed support - it is thought McBrearty will not  Option 2d – BNL self-declares 835 violation – develop Implementation Plan 7

Photos of the Week Accessible?Inaccessible? 8

Photos of the Week Accessible?Inaccessible? 9

1000 Acre Scale of Issue for C-AD 10