Reliability and Operations Subcommittee Report Presentation to the ERCOT Technical Advisory Committee January 6, 2005.

Slides:



Advertisements
Similar presentations
NAESB Strawman January 24-25, Problem Statement Enough generators must have fuel to meet peak load New England Cold Snap crisis heightened interest.
Advertisements

BAL-002-WECC-1 Contingency Reserves
Intra Hour Tagging/Oasis During System Contingencies The transmission tagging process was initially developed to solve an after the fact accounting issue.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 1 Network Operating Committee (NOC) June 12 th, 2014.
Retail Market Subcommittee Update to TAC Kathy Scott April 24,
NPRRs NPRR680 Allow QSEs to Self-Arrange AS Quantities Greater Than Their AS Obligation. This Nodal Protocol Revision Request (NPRR) proposes to allow.
May 29, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott June 3, 2014 TAC Update to RMS 1.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee September 7, 2006.
April 23 rd OWG UFLS Survey & Power Factor Review.
July 30, 2015 TAC Meeting Update to COPS Michelle Trenary August 12, 2015.
March 26, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott April 7, 2015 TAC Update to RMS 1.
RMS Update to TAC January 8, Voting Items From RMS meeting on 12/10/2008  RMGRR069: Texas SET Retail Market Guide Clean-up – Section 7: Historical.
Role of Account Management at ERCOT 2007 TAC Goal Input February 01, 2007.
NPRR XXX: PRR 307 Inclusion in Nodal…Part II. Questions Raised 06/26/06 Section 3 –COP (resource parameters) –CLR participation limits –Telemetry Requirements.
Long Term Solution Task Force TAC Report 5/5/07 Presented by: Bob Wittmeyer - LTSTF Co-Chair.
Commercial Operations Subcommittee (COPS) January 2014 Update to TAC 1/29/2015.
RCWG Update to WMS December 5, General Update Agenda Items for Today: Verifiable Cost Manual clarifications (vote) White Paper on Long Term Fuel.
December 18, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott January 6, 2015 TAC Update to RMS 1.
Transmission Outage Process April Purpose In compliance with the Protocols and the Electric Reliability Council of Texas (ERCOT) Operating Guides,
TAC Meeting Update. Board Update and TAC Voting Item Kenan Ogelman, Vice Chair of TAC gave the Board Update. It included recommendation that TAC.
Item 5: PRS Report John Varnell 2014 PRS Chair Technical Advisory Committee (TAC) Meeting ERCOT Public August 28, 2014.
Generation Adequacy Task Force Update to WMS November 18, 2009.
Standards Review Subcommittee Update August 17, 2010.
COMPLIANCE UPDATE ERCOT ROS Meeting April 9, 2002.
August 28, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott September 9, 2014 TAC Update to RMS 1.
March 27, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott April 1, 2014 TAC Update to RMS 1.
July 30, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott August 4, 2015 TAC Update to RMS 1.
Item 3: PRS Report John Varnell 2013 PRS Chair Technical Advisory Committee (TAC) Meeting ERCOT Public November 7, 2013.
January 29, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott February 3, 2015 TAC Update to RMS 1.
1 TAC Report to the ERCOT Board February 16, 2005.
Technical Advisory Committee (TAC) update to RMS Kathy Scott January 3, 2013Technical Advisory Committee 1.
October 3, 2013 Technical Advisory Committee (TAC) Update to RMS Kathy Scott October 16, 2013TAC Update to RMS 1.
Protocol Revision Subcommittee Report to ERCOT Technical Advisory Committee December 5, 2002.
1 Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee January 6, 2004.
August 27, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott September 1, 2015 TAC Update to RMS1.
Technical Advisory Committee Presentation to the ERCOT Board of Directors March 21, 2007.
February 3, 2011 TAC ERCOT Planning Go-Live Update Jay Teixeira Manager, Model Administration.
COPS Communication Working Group Conference call on 3/8/05 from 1:00 – 2:00 Reviewed scope document and 2005 Goals Reviewed Notification Template.
ROS Report to TAC October 5, Outline  General Items  Nodal Operating Guides  OGRR192  Document control issues  Proposed revisions to Texas.
February 27, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott March 4, 2014 TAC Update to RMS 1.
Role of Account Management at ERCOT 2006 TAC Subcommittee Review ERCOT Board February 21, 2006.
Wind Operations Task Force Overview for ROS Feb 2009 mtg: WOTF has drafted a scope for ROS to consider. WOTF recommendations for Chair & Vice Chair: Chair.
1 TAC Report to the ERCOT Board November 14, 2006.
ROS Report Bill Hatfield 2014 ROS Chair Technical Advisory Committee (TAC) Meeting ERCOT Public June 26, 2014 TAC Meeting.
Capacity, Demand and Reserves Report Bill Bojorquez May 4, 2007.
TAC Update April 7, Update Nodal Protocol Revision Requests (NPRRs) (Vote): –NPRR306, Revisions to Protected Information to Include Black Start.
Operations Update Kent Saathoff TAC Meeting March 6, 2003.
TAC 2012 Meetings Update (March & April) to Commercial Operations Subcommittee Harika Basaran 5/8/2012.
COPS SEPTEMBER 2014 UPDATE TO TAC 9/25/2014 Harika Basaran, Chair Tony Marsh, Vice Chair.
June 26 and July 31, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott August 5, 2014 TAC Update to RMS 1.
December 3, 2013 Technical Advisory Committee (TAC) Update to RMS Kathy Scott December 18, 2013TAC Update to RMS 1.
11/3/2011 Technical Advisory Committee TAC Update Kyle Patrick.
Kenan Ögelman & Randa Stephenson TAC Leadership Retreat TAC Meeting September 5, 2013.
Page 1 of 21 Texas Regional Entity ROS Presentation June 11, 2009 T EXAS RE ROS P RESENTATION J UNE 2009.
February 25, 2016 Technical Advisory Committee (TAC) Update to RMS Kathy Scott March 1, 2016 TAC Update to RMS 1.
ROS Meeting – 06/12/081Texas Nodal Program - TPTF Update Texas Nodal Transition Plan Task Force ROS Meeting Stacy Bridges, ERCOT Thursday, 06/12/08.
TPTF Update Trip Doggett TAC March 9, TPTF Update Meetings February 6 & 7, February 20 Attendance approximately 40 Completed review of ERCOT’s clarification.
Wind Operations Task Force Overview for ROS Jan 2009 mtg: WOTF is continuing work on issues #1a/b/c, 1d, 3e, and 5. The WOTF makes no recommendation to.
February 26, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott March 3, 2015 TAC Update to RMS 1.
Technical Advisory Committee Commercial Operations Subcommittee Update to TAC Debbie McKeever COPs Chair 2011.
RELIABILITY AND OPERATIONS SUBCOMMITTEE Report to TAC Austin, TX December 1, 2011 Kenneth A. Donohoo, P.E. Chairperson Oncor Electric Delivery Company.
TAC Update Kyle Patrick. 2 Nodal ERCOT Program Update –Nodal Market Go-Live (Vote)- vote passed in which TAC certified full nodal systems for Dec 1, 2010.
Long Term Solution Task Force TAC Report 5/5/07 Presented by: Bob Wittmeyer - LTSTF Co-Chair.
Reliability and Operations Subcommittee Report on Reliable Fuel Operations in ERCOT Presentation to the ERCOT Technical Advisory Committee February 3,
Protocol Revision Subcommittee
TAC Report to the ERCOT Board
Appeal of PRS Rejection of NPRR 667
ERCOT – Southern Cross Transmission ROS/WMS Working Group Assignments
2011 Prioritization Update to Market Subcommittees
Cold Snap Task Force Update
Presentation transcript:

Reliability and Operations Subcommittee Report Presentation to the ERCOT Technical Advisory Committee January 6, 2005

Voting Items OGRR 157 – Delete Test Form for Non- Spin - Remove unit specific non-spin test form from Operating Guides. No comments received.OGRR 157 – Delete Test Form for Non- Spin - Remove unit specific non-spin test form from Operating Guides. No comments received. OGRR 158 – Consistent UF Relay Trip Time Language - Revise Operating Guide (Automatic Firm Load Shedding) to be consistent with approved OGRR150 (Clarification of UF Relay Trip Time for Load Shedding).OGRR 158 – Consistent UF Relay Trip Time Language - Revise Operating Guide (Automatic Firm Load Shedding) to be consistent with approved OGRR150 (Clarification of UF Relay Trip Time for Load Shedding).

Other ROS Activities A Double Circuit Outage Contingency Ad Hoc group was formed to review Operating Guide 4.3 Operation to Maintain Transmission and draft a recommendation to the ROS in February/March.A Double Circuit Outage Contingency Ad Hoc group was formed to review Operating Guide 4.3 Operation to Maintain Transmission and draft a recommendation to the ROS in February/March. First meeting January 18, 2005.

Reliable Fuel Operations in ERCOT Update Task Force has had two conference calls since the last TAC meeting to discuss perspectives on the Alternative Fuel Survey. To better determine system reserves, the Task Force has asked ERCOT to provide “raw data” behind survey results. All units will be listed by fuel type, not name. The Task Force is also trying to determine the current status of gas availability in ERCOT. Survey has not been fully vetted at ROS.

Reliable Fuel Operations in ERCOT Update Variables: Generation – no obligation to serveGeneration – no obligation to serve Maintenance Schedules – no coordination of planned Resource maintenanceMaintenance Schedules – no coordination of planned Resource maintenance Loads – Relaxed Balanced SchedulesLoads – Relaxed Balanced Schedules ERCOT Emergency Procedures – no notification in advance of need for oilERCOT Emergency Procedures – no notification in advance of need for oil Gas curtailments of generation can also curtail some loads.Gas curtailments of generation can also curtail some loads.

Reliable Fuel Operations in ERCOT Update Variables continued: While there are known gas capability or supply problems during periods of high demand, there are market incentives to continue to build efficient gas units.While there are known gas capability or supply problems during periods of high demand, there are market incentives to continue to build efficient gas units. The market incentive to “mothball” older units with poor heat rates may also reduce those units with dual fuel capability.The market incentive to “mothball” older units with poor heat rates may also reduce those units with dual fuel capability.

Reliable Fuel Operations in ERCOT Update Discussion Topics for Possible Recommended Solutions: Re-examine ERCOT Emergency ProceduresRe-examine ERCOT Emergency Procedures Gas transmission system status – improvements, pre-determined priorities for users, etc.Gas transmission system status – improvements, pre-determined priorities for users, etc. Provide incentives for Alternate Fuel unitsProvide incentives for Alternate Fuel units