1 WP3: Synthesis and Animation John Glauert Background Interaction with other WPs Organisation of Work Resources Available Resources Needed Coordination.

Slides:



Advertisements
Similar presentations
Synthesis workshop 1: Geographical synthesis May Tromsø
Advertisements

SAFEFOODERA – SSA – integration project Expansion of SAFEFOODERA – Fully integrated or Associated partnership in 12 months.
SAFEFOODERA – SSA – integration project Expansion of SAFEFOODERA – Fully integrated or Associated partnership in 12 months.
The vision To build a staircase to European excellence in food safety research programming through trust and mutual understanding.
W.Koch: REGNET; 10/19991 Creation of digital goods (domain: Cultural Heritage, including libraries, museums, archives, galleries, etc) with emphasis on.
Cultural Heritage in REGional NETworks REGNET Project Management and Coordination.
Expanding LTE for Devices European Commission Information Society and Media The aim of EXATED is to realise the vision of a new scalable.
Virtual Biodiversity ViBRANT Scripting Life: goals & logistics for day 2 Vince Smith Natural History Museum, London ViBRANT Virtual Biodiversity.
Contents of the EHES Joint Action Hanna Tolonen EHES JA Kick-off meeting, 21 January 2010, Luxembourg.
Curating Research: problems and policy Dale Peters Scientific Technical Manager DRIVER II.
European Commission DG Information Society Info Day Brussels, 2 June 2005 Focal points: 1. Concepts, methods and core services 2. Tools in Rich Environments.
COntent Mediator architecture for content-aware nETworks Concertation Meeting, Brussels, 3rd February 2010Slide 1© COMET Francisco Javier Ramón Salguero.
TOURBOT - Interactive Museum Tele- presence Through Robotic Avatars Wolfram Burgard Department of Computer Science University of Freiburg TOURBOT Coordinator:
Proposal of Choogle (working title) Integrated cultural heritage knowledge base Phase I: Small core with connectors to individual databases Easy and open.
VDL Mode 4 Performance Simulator (DLS enhancements) presented by EUROCONTROL Montreal, 26 October 2004.
Alvis status report: Index DataMike Taylor Alvis status report: Index Data Check out the exciting things to come! 1. Technical contribution.
OPUS OPUS Optimising the Use of Partial Information in Urban and Regional Systems Professor John Polak Imperial College London Katalysis Systematica.
Andrew McNab - Manchester HEP - 22 April 2002 EU DataGrid Testbed EU DataGrid Software releases Testbed 1 Job Lifecycle Authorisation at your site More.
1 Synthetic animation of deaf signing Richard Kennaway University of East Anglia.
EnIRaF (Marie Curie Project): enhanced information retrieval and filtering for analytical systems Ying Ding.
CATHI Marie Curie Initial Training Network Cryogenics, Accelerators and Targets at HIE-ISOLDE Yacine Kadi (EN) Kick-off Meeting, 23 May 2011.
1/23 Dipl.-Ing. (EUR ING) Jan Kai Dobelmann MSc DGS-Vize-Präsident MicroCHEAP Kopenhagen MicroCheap Work Package 5.
EGov-Bus 1st year review Advanced eGovernment Information Service Bus eGov-Bus, FP6-IST STP 1st Formal Review Meeting , Brussels eGov-Bus.
Biotechnology for Metal bearing materials in Europe
EUROCHIP 3 WP1 and WP3 Meeting Feeding the project Evaluation 17 September 2010 Sofia, Bulgaria.
TENCompetence Management Issues: WP1 Eric Kluijfhout.
ROBOVOLC A ROBOT FOR VOLCANO EXPLORATION IST Prof. Giovanni Muscato, Università degli Studi di CATANIA,
Results from the UK The National Ecosystem Assessment and its utilisation Dr. Robert Bradburne Department for Environment, Food and Rural Affairs May 2013.
BD SKILLS – Skills for Local Biodiversity Introduction to the Project Mark Snethlage Project Manager, ECNC.
Andrew McNab - Manchester HEP - 2 May 2002 Testbed and Authorisation EU DataGrid Testbed 1 Job Lifecycle Software releases Authorisation at your site Grid/Web.
Forschungszentrum Karlsruhe in der Helmholtz-Gemeinschaft T. Jordan EC Network of Excellence (NoE) HySafe “Safety of hydrogen as an energy carrier” Background.
PERFORMER KO MEETING NICE - 12 th & 13 th September 2013 WP1short presentation.
Slide: 1 Welcome to the workshop ESRFUP-WP7 User Single Entry Point.
European Rail Agency Workshop 29 th September 2011 (Lille) Dr Björn Paulsson (UIC) Dr Stephen Ingleton (Newcastle University) REDUCING THE OCCURRENCES.
Proactively Preventing Freight Wagon Derailment Innotrans | Berlin| 18 th September Dr Björn Paulsson (UIC) Grigory Kozyr(UIC) Gordana Vasic (NewRail.
ViSiCAST- 5 th General Consortium Meeting January RNID, London WP1 Progress MPEG-4 advanced broadcasting system INT.
ViSiCAST 2001 Technical Audit 8 October 2001, Brussels Michele Wakefield - Project Manager, ITC.
ViSiCAST 2002 Technical Audit 4 October 2002, Brussels Michele Wakefield - Project Manager, ITC.
VERRES VLTA Emergency Requirement Research Evaluation Study Crew Co-operation in VLTA The Fourth Triennial International Aircraft Fire and Cabin Safety.
SAFe Automotive aRchItecture SAFARI. SAFARI_Presentation_Short_v1.ppt 2 / /P. Cuenot/ © Continental AG ARTEMIS/Call2 R&D Project Proposal Project.
OULU MINING SCHOOL Two example research projects from Control Engineering: MineSense and EnSaCo 1 Jari Ruuska.
HCI in the software process Chapter 6
SiGML, Signing Gesture Mark-up Language, is the notation developed at UEA over the past three years to support the work of the EU-funded ViSiCAST and eSIGN.
The CrossGrid project Juha Alatalo Timo Koivusalo.
Why we need Motion Capture in 3D Animation and Film.
WP7 - Architecture and implementation plan Objectives o Integrating the legal, governance and financial plans with technological implementation through.
H.U. Hoppe: About the relation between C and C in CSCL H.U. Hoppe: About the relation between C and C in CSCL Part 1: ______________________________ Computational.
An Overview of ViSiCAST zVirtual Signing: Capture, Animation, Storage and Transmission zJohn Glauert, Andrew Bangham, Stephen Cox, Ralph Elliott, Ian Marshall.
Kick-off meeting Rome, March 2013 AthenaPlus.
ISLE: International Standards for Language Engineering A European/US joint project Martha Palmer University of Pennsylvania Tides Kickoff March 22, 2000.
Knowledge Platform for Assessing the Costs and Benefits of Flood Prevention Measures (FLOOD CBA) FLOOD CBA Task B: Building the Stakeholders’ Capacity.
CLARIN work packages. Conference Place yyyy-mm-dd
Chapter 3 Object Oriented Systems and Open GIS. Objectives of the Chapter Establish place of O-O in OpenGIS cover basics of O-O emphasise design issues.
17 th October 2005CCP4 Database Meeting (York) CCP4(i)/BIOXHIT Database Project: Scope, Aims, Plans, Status and all that jazz Peter Briggs, Wanjuan Yang.
Distribution and components. 2 What is the problem? Enterprise computing is Large scale & complex: It supports large scale and complex organisations Spanning.
ECOGEM Cooperative Advanced Driver Assistance System for Green Cars Burak ONUR Project Coordinator R&D Support Executive
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
1 Implementing a Knowledge Cycle for Best Practices in Health Promotion and Chronic Disease Prevention Kerry Robinson, Vincent Turgeon, Dexter Harvey,
Modelling the Process and Life Cycle. The Meaning of Process A process: a series of steps involving activities, constrains, and resources that produce.
Chapter 5 – Software Tools. 5.1 Introduction Tools valuable for –Specification –Interface Building –Evaluation.
A framework that describes the activities performed at each stage of a software development project. A life-cycle or a software process is the organisational.
Thomas Gutberlet HZB User Coordination NMI3-II Neutron scattering and Muon spectroscopy Integrated Initiative WP5 Integrated User Access.
Pedro Emanuel Botelho Espadinha da Cruz
An Overview of ViSiCAST
Building A Repository for Digital Objects
Sectoral Qualification Framework
ESS roadmap on Linked Open Data State of play
Towards lifelike Computer Interfaces that learn
ESS.VIP Validation Item 5.1
CORE outcomes and follow up
Presentation transcript:

1 WP3: Synthesis and Animation John Glauert Background Interaction with other WPs Organisation of Work Resources Available Resources Needed Coordination Strategy Cooperation with Partners

2 Background Several leading systems developed by partners Late stage of synthesis pipeline Aim for Authentic or Realistic natural signing Core support for HamNoSys attributes Respond to enhanced linguistic modelling work Improve realism of signing

3 Interaction with other WPs WP1, WP2:Reference Animation Assumes link between elements used in recognition and synthesis WP4:Reflect Linguistic Model Important interface How much of the linguistic structure is required for good synthesis? WP5:Provide animation of annotations Precise notation supports faithful playback WP7:Supports Applications WP8:Via WP 7 WP9, WP10

4 Organisation of Work Improve realism of signing Optimise acceptability of visual appearance Improve dynamics of movement maybe by sampling Improve repertoire and appearance of facial NMFs Improve integration of face and body NMFs with manual Include ambient motion P roduce Open Architecture Flexible representation of Tiers Flexible synchronisation model Variety of sources: synthesis, mocap, rotoscope Represented via Enhanced HamNoSys/SiGML Cross-Platform support

5 Resources Available Sufficient avatar technology is available Avatar animation systems from Partners

6 Resources Needed Better Definition and Tutorial for HamNoSys 4 Beneficial to build links with outside projects VCom3D as Supporter... Early examples of Annotation framework

7 Coordination Strategy Early phase of understanding partner systems Exchange of Technology Identification of Common Properties Identification of Variety to Support Distribution of Partner Systems SiGML animation system widely available Early support for annotation tools Other systems on demand Frequent but Controlled release of Prototypes

8 Cooperation with Partners Detailed Technical Survey of existing systems Comparative Evaluation of systems Proposals for interworking of systems Experiments on interworking