WG7: 2014 RD51 Test Beam Brief introduction to the RD51 semi-permanent test beam area H4 (mostly for our Indians colleagues) News & Reminder ( mostly for.

Slides:



Advertisements
Similar presentations
Background Check Procedures
Advertisements

Lau Gatignon, EATM, 7 October  The T9 and T10 lines have been running smoothly from mid July and the T11 beam started up very smoothly for CLOUD.
Status of the ATLAS MM project
Test Beams Around the World (well, a very small world…) CERN (transparencies from Horst Breuker from CERN AIDA meeting) DESY (transparencies from Norbert.
EHN1 Claude Pesce DGS/RP. Why TREC & buffer zones?  Radiological control of material leaving beam areas is a legal obligation.
Leszek Ropelewski, CERN Switzerland / Maxim Titov, CEA Saclay France 14 th RD51 Collaboration Meeting, Kolkata, India, October 29-31, 2014.
RD51 Common Test Beam: Status RD51 collaboration week Kolymbari, June 2009 Yorgos Tsipolitis NTUA.
Handling of radioactive material and waste M. Magistris and L. Ulrici (DG/SCR)
The purpose of this presentation is to inform and refresh VCAT online users as to the functions of the service and how it can be best used. This is a brief.
F ERMILAB T EST B EAM F ACILITY Aria Soha All Experimenter’s Meeting December 15, 2014.
F ERMILAB T EST B EAM F ACILITY Aria Soha All Experimenter’s Meeting October 20, 2014.
F ERMILAB T EST B EAM F ACILITY Aria Soha All Experimenter’s Meeting January 26, 2015.
TE/MPE/EM/PMT Collaborations Rui de Oliveira on behalf of PCB workshop team 29/11/20121.
Visiting/working at Los Alamos : Just a little paperwork – A lot can be performed on-line prior to your visit!
Tobias Haas DESY 7 November 2006 A Pixel Telescope for Detector R&D for an ILC Introduction: EUDET Introduction: EUDET Pixel Telescope Pixel Telescope.
Muon Piquet Training. Intro - Disclaimer  This presentation is not intended to be a complete description of the system but a guide, possibly simple,
NSW SG 19 Nov Nov 2014 S. Zimmermann, NSW SG 1.
Updates, Best Practices & New Features Schedule of Classes Summer/Fall 2011.
Radiation Protection LS1 - Collaboration with CERN Technical Groups - Lessons learnt Stephane Bally (CERN), Sandro Di Vincenzo (CERN) Indico
Update on APV25-SRS Electronics Kondo Gnanvo. Outline Various SRS Electronics Status of the APV25-SRS UVa Test of the SRU with multiple.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
Radiation testing in facilities outside CERN EDMS document version 2.0 Heinz Vincke - RadWG meeting 6/7/2010.
Özkan ŞAHİN Uludağ University Physics Department Bursa -TURKEY Bursa gas detector laboratory, status.
CERN workshop upgrade Aida fund Transfer to industry Rui De Oliveira 4/13/20111Rui De Oliveira.
15/2/2006 LHCC Status Report J. Schukraft General News LHC progress & Schedule  now recent news on schedule  ‘closure of beam on 31 August’, first injected.
Test beam setup: status report 02/03/2009 M. Alfonsi (CERN)
CERN Draft 0.2 July 26th, 2011IMWG - Workflow sub working group - draft Proposal.
Physics coordinator report: Shifts 2014 Schedule 2015 Access, safety and courses b508 and 275 Magdalena Kowalska.
News from DESY. Joachim Mnich Plenary ECFA CERN November 20, 2014 XFEL PETRA III & FLASH II Particle Physics DESY Test beam.
CERN workshop upgrade Aida WP 9.2 Rui De Oliveira.
Large area detectors Aida WP 9.2 RD51 WG6
End Station A Test Beam (ESTB) Carsten Hast and Mauro Pivi August 23 th 2012 Proposals, Procedures, Schedule.
Statement of Interest in CMS MPGD High-  Muon Upgrade Florida Tech CMS Muon Group Marcus Hohlmann Florida Institute of Technology, Melbourne, FL, USA.
Access requirements D. Caforio Università di Bologna – INFN AFP Testbeam Organization meeting – October 18 th, 2012.
RD51-WG7 Report RD51 collaboration week CERN, November 2009 Matteo Alfonsi & Yorgos Tsipolitis RD51 collaboration week CERN, November 2009 Matteo Alfonsi.
Run 12: STAR Status and Schedule Update RHIC Coordination Meeting October 18, 2011 Bill Christie BNL Outline Status update Schedule update and issues Summary.
ATLAS micromegas activities (MAMMA)
1 Seventh RD51 CB meeting – 2/9/2011 AGENDA 1.Approval of the agenda 2.Approval of the minutes of the VII CB CERN, 14/4/2011 (Minutes circulated.
Lucie Linssen, PH senior staff meeting 23 Nov ’05 slide 1 EUDET Links: Public EUDET pages: Internal EUDET pages:
Astrophysics Detector Workshop – Nice – November 18 th, D. Attié, P. Colas, M. Dixit, M. Riallot, W. Wang Micromegas tests ̶
JRA2-brainstorming 4/1/2006, Lucie Linssen, slide 1 introduction to CERN in EUDET The CERN PH (physics) department participates in EUDET PH department:
Dec7,2007 ie-FP7 Test Beams for detector R&D at CERN The PS East Area The SPS North Area Irradiation facilities.
Users’ Office News Doris Chromek-Burckhart Head of Users Office Changes to the validity of French host state documents reminders.
News and Miscellaneous UPO Jan Didier Contardo, Jeff Spalding 1 UPO Jan Workshop on Upgrade simulations in 2013 (Jan. 17/18) -ESP in.
14 November 08ELACCO meeting1 Alice Detector Control System EST Fellow : Lionel Wallet, CERN Supervisor : Andre Augustinus, CERN Marie Curie Early Stage.
Assembly scenario of ILD Si trackers 2015/4/21 Yasuhiro 1.
Experiments, Schedule & Access to the hall. Magdalena Kowalska.
Physics coordinator report 2015 overview 2016 schedule Safety & access B. 508 & 275 Karl Johnston.
DT Technical Space Overview December 2012 M.Capeans, A.Catinaccio PH-DT.
Micromegas projects and future tests Phone meeting August 26th, 2009.
Online Work Permit Application Instruction Date: 2016/03/01 International Office, Feng Chia University.
Eija Tuominen, coordinatorHIP/UH Detector Laboratory, October 2010 DETECTOR DEVELOPMENT at HELSINKI DETECTOR LABORATORY Detector Laboratory is a joint.
Test beam check list Michael JECKEL EN-EA-EC. Content: Safety & Radiation Protection Arrival Access Installation Departure Michael JECKEL EN-EA-EC.
Overview on CERN Test Beam Facilities On behalf of the CERN SPS/PS test beam coordinator: Horst Breuker, CERN Courtesy: Matteo Alfonsi, CERN Horst Breuker,
Technology and R&D Summary and next steps Burkhard Schmidt.
Page 1 WP10.2: TA DESY- II Test Beam Facility AIDA-2020 First Annual Meeting Norbert Meyners, Marcel Stanitzki, Natalia Potylitsina-Kube DESY.
Muon Piquet Training: General Informations March 8-th 2016.
Test beam check list Michael JECKEL EN-EA-EC.
RD51 test facilities E. Oliveri (CERN) on behalf of RD51.
L-Band Experimental Authorization
WP8 – Improvement and equipment of irradiation beam lines
Micromegas tests ̶ Test beam 2010 plans ̶ RD51 Mini Week - CERN
Preparation for CERN test beam
DESY Test Beam Facilities - Status and Plan
RD51 Mini Week – April 2013 F.Ravotti: The New Irradiation Facility in the CERN PS East Area P.Thuiner: SWPC for monitoring, stability and aging tests.
Test beam check list Michael JECKEL EN-EA-EC EDMS:
Ron Settles MPI-Munich ALCPG09 Testbeam Session
EUDET Extended SC meeting 31 August 2009
Assumption for a given sector
Regulation applied (European and French) Microorganisms and GMO
Presentation transcript:

WG7: 2014 RD51 Test Beam Brief introduction to the RD51 semi-permanent test beam area H4 (mostly for our Indians colleagues) News & Reminder ( mostly for incoming-beam users) IWAD and the 14th RD51 Collaboration Meeting, October 2014 Kolkata, India Yorgos T., Eraldo O.

Building 887 – EHN1

+ GDD/RD51 Laboratory available during test beam (to fix issue with detector/electronics)

RD51 Common Infrastructures and services

News & Reminders

ALICE TPC Upgrade with MPGD Specific Requirements: End of the beam line (Shower) ATLAS NSW Project (micromegas) Specific Requirements: GOLIATH CMS GEM Muon Upgrade : GEM Collaboration Specific Requirements: One Tracker and APV/SRS & VFAT/TURBO readout FRASCATI - Triple GEM in magnetic Field (BESIII and Ship experiment) Specific Requirements: GOLIATH, Isobutane WIS/Aveiro/Coimbra - Large single-stage THGEM detectors Specific Requirements: One Tracker and APV/SRS readout LAPP/UA/NCSR/IRFU – Resistive micromegas for calorimetry Specific Requirements: End of the beam line (Showers) 12 Day as Main User + … 2014 rd51 Test Beam Period (November 26 th – December 15 th )

CMS GEM ATLAS NSW + LNF (BESIII and SHIP) WIS/Aveiro/Coimbra Large single-stage THGEM detectors ALICE TPC LAPP/UA/NCSR/IRFU Resistive micromegas for calorimetry Typical Shift Scheme

+ EDH Request + Validation of the card (see next slides) 1. Valid CERN Dosimeter 2. CERN Badge + Validated Access to Counting/Control Room 3. Helmets and safety shoes for the experimental area Counting/Control Room Experimental Area What you need to access the Test Beam

Online Reader to validate your access in: R1, R2, R3, EHN1 Ref. To previous link for more info See next slide for the references to our Counting/Control Room ACCESS TO THE CONTROL/COUNTING ROOM: To Be requested VIA EDH by each user

Online R1, R2, R3, EHN1 SBA zoneRoom numberUserTerminalPhoneBarrackBuilding / OfficeHost Name H /R-K47H4A 76282HNA /1-A47cwo-hna348-h4a Our Counting/Control Room End Date: 1 week more suggested

any export of material from the CERN Experimental Area halls/buildings 157 (East Area), 193 (AD), 887 (EHN1), 888 (EHN2), 911 (ECN3) to an external destination must be: registered in EDH using the Shipping Request form EDH Shipping Requests issued from the above mentioned areas (also for material declared as non-radioactive by the owner) are automatically forwarded to the relevant Radiation Protection Officer that will proceed with the compulsory radiological control before authorizing the transport. Please note that this procedure also applies to material/goods belonging to external institutes as well as if the material is transported afterwards by the owner itself (e.g. CERN transport services not required in the EDH form). schedule/RadioProtectionDocuments/BufferzoneEHN1-english.pdfhttps://sps-schedule.web.cern.ch/sps- schedule/RadioProtectionDocuments/BufferzoneEHN1-english.pdf Material leaving the experimental area… just to keep in mind We will take care of this but keep in mind that you cannot simply leave the area with your equipments without having RP check New procedure, i.e. possible delay

2015 rd51 Test beams Unless specific requests will be provided by rd51 collaborators, we will request: 3 periods of 2 beam-weeks each: Spring [May/June], Summer [July/August], Fall [October/November] Request Deadline : Saturday 15 th of November (filled by us - nothing to do from your side) Explicit requests from rd51 users will be used as a support of rd beam request

Dear colleagues, we would like to update you on the test beam schedule for the DESY-II test beam facility in The DESY test beam will resume operation mid January (12th or19th of January) after a nine month shutdown due to the upgrade of PETRA-III. With this mail we would like to inform you, that we are now talking applications for beam time from January till July 5th, 2015 If you are planning to make use of the DESY test beam in this period, please apply till 4 November 2014 and provide the following information to testbeam- :testbeam- project name and short description, responsible Person, Participating Groups, number of requested weeks, preferred month(s), required infrastructure (beam telescope, magnetic field, gas, stages) You can find information on the DESY-II test beam on The DESY-II Test Beam Coordinators Ralf Diener, Norbert Meyners, Marcel Stanitzki 2015 DESY Test Beam RD51 Equipments (no support in Desy) available if needed FYI