Marine Transport and Logistics Terminal «Sarzha»

Slides:



Advertisements
Similar presentations
QENERGY Europe Initiating the LNG Bunkering Project LNG as the basic ship fuel.
Advertisements

W W W. L S H. L V. The Background of our Logistics business starts in when Baltic states got independent. There was no private business practice,
PROJECT CLIMEPORT Mediterranean Port’s Contribution to Climate Change Mitigation ANTONIO CEJALVO Director Agencia Valenciana de la Energía (AVEN) Projet.
Development of local content following the results of 2013.
DOING BUSINESS IN KAZAKHSTAN MARCH 2014, DUBAI. GDP Growth Comparison.
RIS Implementation survey and policy evaluation RIS workshop Italy October 2012 Sandra van Putten/Panteia-NEA.
NECL II in short  Budget: approx. 2,7 M€  Duration:  Partnership: 22 partners from Sweden, Norway and Finland - Leadpartner: County Administrative.
“The Employment of LNG in East Mediterranean” “The Employment of LNG in East Mediterranean” Dr Panayotis Zacharioudakis, R&D Director OceanFinance Efficient.
Mission Promoting the development and growth of maritime shipping via the kingdom's national port of Aqaba through; mobilizing business skills and concepts.
Mangystau Governor’s Office ECONOMIC AND INVESTMENT POTENTIAL OF THE MANGYSTAU REGION OF THE REPUBLIC OF KAZAKHSTAN.
Development of North Adriatic ports multimodal connections and their efficient integration into the Core Network Project: NAPA STUDIES Trans-European.
INTERREG IIIB North Sea Northern Periphery. INTERREG IIIB North Sea Northern Periphery Vision The Northern Maritime Corridor - a means of efficient, safe.
There are huge oil and gas reserves on and off shore of the Caspian Sea region. Contracts worth billions of dollars had since been signed, with the newly.
PROJECT AND OVERSIZED RESHIPING
Trailblazing! Welcome to InterRail TSES!
ECT - European Gateway Services 24 June Agenda 1.Introduction 2.Supply Chain Trends 3.Synchromodality 4.European Gateway Services 5.COMCIS-project.
Lithuanian Integrated Marine Science, Studies and Business Centre (Valley) Zita Gasiūnaitė Coastal Research and Planning Institute, Klaipėda University.
Increasing Role of SOCAR in Ensuring Energy Security of Eurasia Rovnag Abdullayev, President of SOCAR VI-th Eurasia Forum KAZENERGY, 4-5 October, 2011.
Transit Country- Case Georgia
March 2015 Mangystau Oblast, Kazakhstan Investment Destination Profile.
ATHENS PROGRAMME Stijn Koshari & Tom Van der Voorde KU Leuven – Chemical Engineering.
Russia as a key player on the world energy market Elena Telegina Director of the Institute of Geopolitics and Energy Security of Russia Member of the Board,
Development of marine logistics hub
TRACECA PROJECT REPAIR AND REHABILITATION OF FERRY COMPLEX VARNA.
Dry Bulk Terminals vs. Offshore Transshipment ICHCA International Conference “ Changes to Trade & Shipping in the 21 st Century ” Busan, S. Korea May 2008.
Presented By: Dave Mannon Opportunities For Oil Service Sector Companies in Kazakhstan.
Investment Project Construction of Multi-purpose Marine Complex of Terminals (MMCT) “Galitsyno”
ASIA-EUROPE MEETING (ASEM) ASEM Symposium on Eurasia Transport and Logistics Network M. SOKOLOV MINISTER OF TRANSPORT OF THE RUSSIAN FEDERATION.
Linggi Port Oil & Gas And Industrial Park
Caspian energy development -- t he second phase Jonathan Elkind Joint Global Change Research Institute University of Maryland.
Investment Project Black Sea Ship-building Yard. 2 Key Information Public JSC “Black Sea Ship-building Yard” is one of the largest ship-building.
Added Value of a CCS Cluster for Yorkshire and Humber Stephen Brown Director of Carbon Capture and Storage Conference of the Regions Workshop Rotterdam.
Presentation of investment projects of Kherson Sea Port.
Long-Baseline Neutrino Facility LBNF LBNF/DUNE Logistics Workshop Summary Mike Headley August 19, 2015.
HANCOCK PROSPECTING Hope Downs Iron Ore Project The Current Status 7 th Annual Global Iron Ore & Steel Forecast Conference Perth, 2004 Russell Tipper –
Outlooks for increase of oil and gas industry potential Outlooks for increase of oil and gas industry potential Authors: Kuandykov B.M., Yeskozha B.A.
Investment Project Construction of corn transloading terminal in the port Yuzhny.
TRACECA CONSTRUCTION OF INTERMODAL TERMINAL IN THE REGION OF RUSE CITY BULGARIA Infrastructure Working Group Kiev, 11 May 2011.
1 2 nd Expert Group Meeting Euro-Asian Transport Linkages 3-5 November 2004, Odessa Asian Highway Network providing Euro-Asian Highway Linkages M. B. Regmi.
Deepwater district “North” Of Arkhangelsk sea-port The project has been approved by the Federal Agency of Sea and river transport of the Ministry of transport.
An Introduction to Transportation Systems
GREENFIELD FOR INDUSTRIAL AND LOGISTIC DEVELOPMENT.
Infrastructure and capacity development of the State Enterprise “Sea Trade Port of “Yuzhny”
COMPLEX DEVELOPMENT OF UST-LUGA SEAPORT AND ADJACENT TERRITORY Svetlana Makarova, Srategy and Development Director Marina Lebedeva, Environmental Projects.
CORRELATIONS BETWEEN THE PORT OF BAR AND CITY OF BAR CORRELATIONS BETWEEN THE PORT OF BAR AND CITY OF BAR - some aspects of analysis - Presenter: Deda.
1 CONFIDENTIAL Madi Kanafin Senior specialist at Sectorial department on transport and logistics infrastructure, KAZNEX INVEST, JSC Mob:
Main Macroeconomic Data of Georgia GDP In 2014 GDP growth rate was 4.6% (Nominal GDP USD 16.5 bln.). GDP Structure: 17.5% - Trade, 16.9% - Industry, 10.4%
Global Project Cargo Solutions brunelprojectcargo.co.uk.
Lithuanian Integrated Marine Science, Studies and Business Centre (Valley) Zita Gasiūnaitė Coastal Research and Planning Institute, Klaipėda University.
Djibouti Ports – DP WorldPresented By Jérôme Martins Oliveira CHIEF EXECUTIVE OFFICER.
1 NATIONAL PROJECTS OF REGIONAL IMPORTANCE MINISTRY OF ECONOMY AND ENERGY OF REPUBLIC OF BULGARIA SECOND CONFERENCE ORGANIZED BY NEWSPAPER “CAPITAL” 27.
1. Initiator and goals of the project Initiator of the project – the Investment Promotion Agency of Novosibirsk region – a specialized organization for.
HYUNDAI CORPORATION Global Business Organizer May 13, 2009 Presented by : Noh, Young Don / President & CEO.
Port of Black Sea Regional Conference 31 st October 2007 CONSTANTIN MATEI GENERAL MANAGER National Company “Maritime Ports Administration”
EURO-AG Ltd 14, Tramvayny prospect, office 308 St. Petersburg, Russia T: F: E :
Title: Road vs. Rail… A shift towards rail Date: 16 Nov 2015.
SPECIAL ECONOMIC ZONE «SEAPORT AKTAU»
SORTING AND LOGISTICS CENTER SEZ «PAVLODAR»
Dr. Christos Solomonidis Civil – Harbour Engineer Managing Director
SPECIAL ECONOMIC ZONE «SEAPORT AKTAU»
«We will start carrying out promising projects such as the formation of international transportation corridors, including those from the Baltic via the.
MULTI-PURPOSE DOCK GARY PAXTON INDUSTRIAL PARK | SITKA, ALASKA
«We will start carrying out promising projects such as the formation of international transportation corridors, including those from the Baltic via the.
State policy in the field of development of the railway transport:
CPC - International Consortium
Marine Port and Service Market Report : Trends, Forecast and Competitive Analysis 1.
Djibouti Ports – DP WorldPresented By Jérôme Martins Oliveira CHIEF EXECUTIVE OFFICER.
Marco Polo – Towards a policy revision
Terminal «Factor» Port of Ust-Luga
Presentation transcript:

Marine Transport and Logistics Terminal «Sarzha» Kuryk

Concept SEVERAL PROJECTS ARE DEVELOPED AT THE SAME TIME KASHAGAN PEARLS BLOCK N SEVERAL PROJECTS ARE DEVELOPED AT THE SAME TIME Adjustment, coating and concrete coating of pipes (Shell) – key project Grain, cotton terminal and dry cargo terminal (Wincanton) Ship repair yard on the slips (Wagenborg, Damen) Reception and assembling of modular units (TCO) Support base for offshore operations (Block – N and other deposits) Terminal location

Master plan of the terminal Workshop for coating and concrete coating of pipes Assembly line of pipes General port terminal Support base for offshore operations Ship repair yard Moorage for loading and unloading of oversized units Harborage Breakwater

I. Adjustment and coating of pipes Customer - Shell Analysis of required pipes for Kashagan project: 2nd phase of Kashagan project: 3 LPP= 380 km; 3 LPP + Concrete coating= 200 km Future phases: 3LPP = 570 km; 3LPP + Concrete coating = 390km Preliminary analysis of the project: Profitable if output is more then 150 km per year Having prospects – Start of new offshore projects The work done: Negotiations with potential partners Presentation for Shell Development Kazakhstan

II. Grain, Cotton Terminal and Dry Cargo Terminal Advantages of the Project: Need for new logistic resources in RK on the Caspian Sea Advantageous geographical location Existing railway and road infrastructure Interest of grain and cotton producers in using of the terminal Volgo-Don Baku Potential risks: In 2009 a project of Uzen-Gorgan railway construction was launched as a part of international transport program “North-South” (St.Petersburg – Bander Abas). Start of the railway functioning is planned in 2012. Capacity of the new railway is 5 mln tonnes of grain per year. Iran Conclusion: The project of Grain Terminal is profitable on conditions of a synergy with other projects of Multifunctional Terminal.

III. Ship repair yard on the slips Tentative agreement was arranged for maintenance of transport resources of the Caspian Sea and ships of partner organizations in the Kuryk Project. Capacity: 2 vessels of 3000 tonnes Negotiations for partners involvement was conducted: DAMEN WAGENBORG

IV. Reception and assembling of modular units Customer – TengizChevroil “Future’s Growth Project” KURYK Within the scope of FGP it is planned to transport equipment as modular units (500, 1000, 1500 tonnes) to the Caspian Sea from Europe. Thereupon small and large units have to be delivered to Tengiz by a railway or motor transport. Transportation of the units requires road reconstruction or construction of a temporary road. At the moment TCO considers the option of using of the North route that causes significant ecological risk for TCO. SEMURG INVEST suggests an option of the project implementation by means of South route with using of a moorage in the region around Kuryk.

V. Support base for offshore operations (Block – N and other deposits) Kazakhstan is currently one of the top ten oil producers worldwide. The last 15 years showed an impressive increase of Oil & Gas industry in Kazakhstan with the development of Karachaganak and Tengiz Oil Fields The discovery of Kashagan giant oil field in the late 90s and its development further boosted local Oil&Gas industry. OPEC statistics foresees an increase in oil output in excess of 5% per year in the next years for Kazakhstan leading to 3 mb/d in 2020. Current logistics routes through overcrowded areas of Aktau and Bautino ports do not provide efficient and optimal transport solutions. New logistic solutions are required.

Contact Details Iskandar Abdulkhalikov General Director Email: i.abdulkhalikov@semurginvest.kz Mobile: +7 701 717 2074 Mobile: +7 777 214 3712 Toktassyn Assenov Technical Director Email: t.assenov@semurginvest.kz Mobile: +7 777 793 99 59