PWP / LAW Book Short Comings & System Improvement.

Slides:



Advertisements
Similar presentations
LIBRARY BUILDING Where to Begin?. WHY? Identify the reason for the new/renovated building Quantify the need based on standards, shortfalls and benchmarks.
Advertisements

ODOT Structure Project Management Seminar Bridge Preliminary Design Report.
What is Plan 1.The economy of India is based in part on Planning through its five-year plans, which are developed, executed and monitored byeconomy of.
PCU OFFICE HOD OFFICE PROCESS FOR RELEASE OF FUND DDO OFFICE.
Earning Contract Module Streamlining Revenue Collection System (Sundry Earnings) Sr. DFM, Nagpur.
DHRUVA SHIPPING CONSULTATS AND SERVICES PVT. LTD.
Railway Grade Separations Issues. Railway Grade Separations 1.Introduction Qualifications/experience to undertake bridge planning for railway grade separations:
INTERNAL AUDIT Mechanism in SSA-MADHYA PRADESH. Staff sanctioned for Financial Management S.No.Name of Post Post sanctioned Post FilledPost Vacant State.
Central Valley Flood Protection Board Meeting – Agenda Item No. 5C Central Valley Flood Protection Board.
ESTIMATES Mrs.Nirupma Kumar Prof. Fin & Investment.
OBJECTIVES OF PMS  PMS is a web based application for monitoring progress of all projects undertaken by CPWD  Monitoring of projects both at pre and.
Raaj Unocal Standard Operating Procedures Procurement
DPC PROCEDURES -V.Natarajan
On implementation of RTI Act 2005: Government’s initiatives Department of Personnel and Training November 4, 2008, Delhi.
Business Associate Agreement and Access to Eligibility Information William Lessard Department of Medical Assistance Services September 14, 2010.
SCRUTINY OF FINANCE PROPOSALS. Funds Revenue – Demand No.1-15 Capital - Demand No. 16 Plan Heads of expenditure-Capital  New lines  1400-GC 
Northeast Corridor Greenway Acquisition – Mitigation Feasibility Study Results City Council Workshop June 24, 2014.
ROLLING STOCK PROGRAMME AND M&P PROGRAMME
SUB COMMITTEE ON DISTRICT PLANNING PROCESS. 2  The DPCs are weak bodies with little professional support to guide & monitor planning process except in.
Finance & Accounts Departments (FA&CAO Office) Welcome you to the Vendor Meet.
Ph.D. STUDIES and STUDENTS 1.The studies towards the degree "Doctor of Philosophy" (Ph.D.) or "Doctor of Laws" (LL.D.) constitute the highest stage in.
IRCC Orientation Programme Life cycle of a Sponsored Project.
Capacity Building Capacity building for financial Management Integral part for effective and efficient functioning of Financial Management Unit. Needs.
GOVERNMENT ACCOUNTS AND BUDGET- AN OUTLINE
Works and Accounts Management Information System (WAMIS) For
Cape Cod Transportation Improvement Program (TIP) HOW DOES A PROJECT GET ONTO THE TIP ? Priscilla Leclerc, Senior Transportation Planner Cape Cod Commission.
1 Training on Procurement Procedure 23 rd Review Meeting of State FCs- Bhopal ( ) Annexure ‘W’
1 Ministry of Education Budget Execution March 28, 2010 As of.
Communication Division First Quarter List of Projects (Only design development activities excluding courses and industry services) Tea Color Separator.
S10 CONS5Q25 Lara Tookey. Review of estimators workings Decision on what margin to apply Bid submission details Submit your Tender.
TERM LOANS PROCEDURAL REQUIREMENTS. Obligations of assistance.
INDIAN RAILWAY VISION CAPACITY CREATION BY More than 30,000 kms of route would be double / multiple lines (compare to around 18,000 kms today).
1 GUIDING PRINCIPLES FOR AN OFFICER High standards of financial propriety Financial Economy Observance of Financial Rules and Regulations Expenditure within.
Specification & Quantities Estimating
Works Programme Brief Overview Financial as well as advisory roles. Advises on all matters involving finances - Projects big and small or - Day-to-day.
INDIAN RAILWAYS INSTITUTE OF CIVIL ENGINEERING. COORDINATION WITH ENGG DEPT Engineering Department responsible for construction and maintenance of following.
BASICS IN IRRIGATION ENGINEERING 2.1. Planning Irrigation systems 2.2. soil-plant-water relation – over view 2.3. Crop water requirement 2.4. Base, delta.
PITFALLS IN DEALING WITH TENDERS &CONTRACTS Shiv Kumar Director/IRICEN.
Dissertation Presentation
1 Briefing Session on Application for Fee Revision for the 2013/14 School Year by DSS Schools Submission of budget and financial information MA Section.
Presentation on amendment of money bills National Treasury 6 August 2008.
1 Briefing Session on Application for Fee Revision for the 2012/13 School Year by DSS Schools Submission of budget and financial information MA Section.
Projects spanning over two programming periods Department for Programme and Project Preparation Beatrix Horváth, Deputy Head of Department Budapest, 5.
1 PS&E Plans, Specifications and Estimate. 2 Contract Letting Plans-Show what is being built Plans-Show what is being built Specification-Show how project.
Advocacy: Influencing Facility Development in Public Parks and Recreation Departments Tennis advocacy should occur year round through informal communications.
Flow of Project-wise budget Monitoring Internal Controls effectively redefined Group of activities in the project which can be defined and monitored in.
MACHINERY & PLANT PROGRAMME
Copyright 2009 Northumberland County Council Procurement Policies & the Councils Constitution.
Presentation for National Workshop/ Review Meeting of State Project Engineers/ Civil Works Coordinators Puri, Orissa Date : 16 & 17 November, 2011.
 Inventory Management module is sub divided into different modules as under ◦ Inventory Requisition ◦ Inventory Order Assessment ◦ Inventory Placing.
HARLINGEN CISD BUDGET PREPARATION BUDGET INSTRUCTIONS
ESTIMATES SANJAY UPRETI PAM. PREPARED FOR Construction or purchase of new works or assets. renewal or replacement of asset chargeable to any of the funds.
Open Budget Survey 2015: What does it say about budget transparency in India? Centre for Budget and Governance Accountability.
Writing Bylaws. Bylaws are written rules that control the internal affairs of an organization.
ARBITRATION Prevention & Cure By: Vinay Kumar Gupta Dy.CE/Genl/N.Rly.
CRS SANCTIONS Chetan Bakshi, CRS/Central. WHY CRS SANCTION IS REQUIRED ? Section 21 & 22 of Railway Act 1989 stipulates that “ No Railway should be opened.
Summary of Previous Lecture Planning. Planning Machinery Most countries of the world have established a planning agency of one kind or another for the.
Weekly Status Reporting Tracking to Build Organizational Capacity.
Arlington County’s Transit ITS Program Needs Assessment and Planning Study Presented to ITS Virginia | July 17, 2015.
Small Purchase of Professional Service Providers Administrative Rule R
Capital Facilities Program Update San Rafael City Schools 10 May 2016.
2016 NSF Large Facilities Workshop New Initiatives Business Roundtable II-III May 25-26, 2016 Jeff Lupis, Division Director, Division of Acquisition and.
Christopher M. Quinn, MACC, CPA, CFE, CGFO, CGMA Finance Director Tuesday, May 3 rd, 2016.
May 5, 2016 May 5, Reporting obligations for  Investment banks,  Stockbrokers and dealers  FM and Investment advisers 2. Publication financial.
Support National Social Protection Strategy (NSPS) CARD/SPCU 1.
Budget Sib Sankar Banik, W.B.A&A.S Internal Audit Officer
Engineering Major Projects: Raleigh Office Minor Projects: Division Office -This is a NCDOT policy, not a FHWA policy; it’s meant to avoid conflicts of.
Processing Permit Requests within Limited Access Rights-of-way
Harlingen CISD Budget Preparation Notes
Harlingen CISD Budget Preparation Notes
Presentation transcript:

PWP / LAW Book Short Comings & System Improvement

PWP – PLAN HEADS Zonal Rly. submits PWP proposals to Rly. Board on 12 plan heads ( Except PH – 11NL,PH-14 GC & PH-17 Comp.). Separate PWP is submitted for PH Track Renewals. Various 12 plan heads are mentioned below :- * PH-15 - Doubling.* PH-16 - Traffic Facilities. * PH RSW- L-Xing.* PH-30 - RSW- ROB/RUB. * PH Bridge Works.* PH-33 - Signal & Telecom. * PH Oth. Elec. Works.* PH-42 - Workshop. * PH- 51- Staff Quarters.* PH Staff Amenities. * PH- 53 – Pass. Amenities.* PH- 64 – Oth. Spec. Works.

PWP – Guide lines by Rly.Board. Rly. Board communicates Ceiling ( C ) (Projected- - BG for PWP Year) to Zonal Railways. Throw Forward ( T ) under various Plan Head is calculated as mentioned below. Throw Forward = Total cost of – Expected Exp. up in works in PH. to end of Cont…..

PWP – Guide lines by Rly.Board. Norms ( N ) :- For each Plan head Norms laid down by Rly. Board is mentioned below :- PH- 29, 51, 52 & PH- 32 ( Bridges ) - 5. Other Plan heads - 3. Margin to propose work :- Based on ceiling, Norms and throw forward, margin to propose work is calculated as follows:- Margin to Propose works = N x C - T

PWP Proposals - Short comings Proposals are framed without detailed survey, detailed drawings, design and in case of Traffic facility works without approval of yard plans by all deptt. (For NL,GC & DL first FLS is sancd. & after submission of DPR Project is sancd.) After sanctioning works, large variation in quantities and value at the stage of preparation of detailed estimates, requiring sanction of detailed estimate at Railway Board’s level causing delay. Cont…..

PWP Proposals - Short comings Major changes in scope of work after sanction of works specially in case of traffic facility works & works in PH 42 (Workshop). After sanction of works, abnormal delay in approval of plans by various departments as initially detail plans were not prepared.

Abnormal delay in sanction of detailed estimate due to delay in approval of plans by all departments. All above reasons leads to delay of more than a year in starting execution of works. PWP Proposals - Short comings

System improvement - Suggestion./Recommendations In first year’s PWP, list of works costing Rs.2.5 Cr and more should be approved by Railway Board with tentative cost for detail survey, planning, designing, preparation and approval of plans, preparation of detailed estimate and detailed project report. This system is already existing for NL, DL & GC Projects, were initially survey is sanctioned & at later stage Project is sanction. Cont…..

System improvement - Suggestion./Recommendations In second year’s PWP after submission of detailed project report along with survey report, design, approved plans and estimate, Railway Board should sanction the work finally. After sanction of work by Railway Board, sanction of detailed estimate should not be required so that immediately after inclusion of work in Pink Book Railway can go ahead with tendering process. Work should not be sanction if margin to propose work is negative. Sanction should be limited to extent of available margin to propose work.

System Improvement - Powers required.  After initial inclusion of works in PWP, power to engage agency for detailed survey, designing, consultancy, preparation of plans, estimate and detailed project report should be given at the level of JA Grade officer without finance vetting & without annual ceiling limit. This should be similar to power of calling quotations.

LAW Book- System improvement Suggestions./Recommendations. Traffic facility works should be included in LAW Book after approval of Engineering Scale Plan by all departments. List of such works should be approved 6 months in advance of processing LAW Book. Bridge works, should be included in LAW only after approval of structural drawing. List of such works should be approved 6 months in advance of processing LAW Book.

LAW Book- System improvement Suggestions./Recommendations. Work should not be sanction if margin to propose work is negative. Sanction should be limited to extent of available margin to propose work. Number of works in LAW Book should be limited to resources available in divisions to complete work within 2 years of sanction.