HEA 1738 IC 14-25-2 as amended Water Resource Allocation and Distribution in Indiana IDNR Division of Water.

Slides:



Advertisements
Similar presentations
WATER, WATER WHERE?? With apologies to SAMUEL TAYLOR COLERIDGE author The Rhyme of the Ancient Mariner December 5, 2006.
Advertisements

Surface Water Availability. Surface Water Considerations.
Utah/Nevada Ground-Water Apportionment and Protection Agreement.
Department of the Environment Water Use and Appropriation of Maryland’s Waters.
Groundwater in Colorado: Hydrogeologic Investigations Supporting Groundwater Administration Kevin Rein, P.E. Deputy State Engineer.
Governor’s State Water Law Review Committee Recommendations 1982: Implementation Update David G. Baize Bureau of Water.
0 James Kennedy, Ph.D., P.G. State Geologist Georgia Environmental Protection Division Georgia Comprehensive State-Wide Water Management Plan Assessment.
Governor Napolitano’s Listening Tour2004 Water Management Within Active Management Areas.
Recommendations for a Statewide Water Plan By: Ewan Hadgraft Alabama Rivers Alliance Birmingham-Southern College.
Groundwater Resources of Parowan Valley Tom M. Marston, U. S. Geological Survey In cooperation with the Utah Division of Water Rights.
Dr. Martin T. Auer Michigan Tech Department of Civil & Environmental Engineering Surface Water Supply.
Dr. Martin T. Auer Michigan Tech Department of Civil & Environmental Engineering Surface Water Supply.
The Compact  Legally enforceable contract among the Great Lakes States  Provided for in the U.S. Constitution  Ratification by State legislatures 
Water Resource Division San Joaquin County Water Resource Management Planning Update C. Mel Lytle, Ph.D. Water Resource Coordinator San Joaquin County.
Will we be able to source Irrigation Water ? Irrigation is Not Possible Without Water !
The New Water Use Requirements January, 2007 Lyndon Kelley- MSU Extension Water Quality Agent.
Land Use Planning and Its Effect on Groundwater Louisiana Department of Environmental Quality 2010 Envirothon Training.
ETF – O IL AND G AS T RACT, M AY 5, 2015 GROUNDWATER AUTHORITY AND REQUIREMENTS.
Department of Natural Resources and Conservation, Water Resources Division State Water Projects Bureau Kevin B. Smith, P.E., Chief
Equus Beds ASR Program – Wichita’s Future Water Supply September 6, 2012.
Permits to Take Water: What you need to know.
Rule 62-40, F.A.C. – What is it? The Water Resource Implementation Rule (State Water Policy). Required by Sec , F.S. Goals, objectives and guidance.
Feasibility of Aquifer Storage and Recovery in the Upper Colorado River Basin Presented by: Western Water & Land, Inc. Grand Junction, Colorado.
IRRIGATION LAWS IN MISSOURI Jim Vandike Missouri Department of Natural Resources Geological Survey and Resource Assessment Division.
IDWR PUBLIC HEARING February 28, 2012 Mountain Home, ID.
FERC Relicensing of the Toledo Bend Project – Hydroelectric Power Generation Drought Hydroelectric vs. Water Supply Sabine River Authority Issues.
Water Supply Reallocation Workshop Determining Yield and Space Requirement.
WATER AVAILABILITY MODELING for the SULPHUR RIVER BASIN Texas Natural Resource Conservation Commission Austin, Texas Consultant: R. J. Brandes Company.
THE RHONE RIVER BASIN Alex Houston February 23, 2012.
Short and Long Range Water Supply Planning and Aquifer Performance Test (APT)
Rulemaking for Central Florida Coordination Area Coordinated Rulemaking by the South Florida, St. Johns River and Southwest Florida Water Management Districts.
Drought Response Plan Clarke County, Virginia Saving Water/Saving Money: Water Conservation in the Shenandoah Valley March 11, 2009 Alison Teetor Natural.
Water Demands in the Jackson Blue Spring Basin.
Interdistrict Transfers of Water and Local Sources First Land Resources and Regulatory Committee November 3, 2005 Land Resources and Regulatory Committee.
Preparing For Drought Alexander Hinz Daniel Rice Dorothy Young ________________ Water Supply Division Texas Commission on Environmental Quality 2015 TCEQ.
IDWR PUBLIC INFORMATION MEETING March 19 & 27, 2013 Mountain Home & Idaho City, ID.
Regional Water Availability Rulemaking Chip Merriam Water Resources Advisory Commission February 8, 2007 Chip Merriam Water Resources Advisory Commission.
Seacoast Utility Authority Water Use Permit Steven Memberg, Section Leader Water Use Regulation Division, Water Supply Department January 26, 2009.
Columbia River Basin Water Supply Development Program House Bill 2860 (February 2006) established the need for a Columbia River Basin Water Management.
1 Water Resources Management - DEQ’s Role in Water Supply - State Water Commission October 1, 2002.
Preserving Our Water Resources: New Directions in Water Supply Planning.
THE MANAGEMENT PLAN IN PRACTICE Case study. RBMP Detailed publication process in the directive...  art. 13: general rules  annex VII: detailed contents.
Governor Napolitano’s Listening Tour2004 Water Management Within Active Management Areas.
Water Supply Planning in Hampton Roads: Options for an Uncertain Future The State of Virginia’s Water Resources October 28, 2015 Whitney S. Katchmark,
Impacts of Increased Runoff Localized flooding Changes flood plain in larger streams Changes stream channels (deepens, widens, steeper banks)
Water Supply Orange County Presented by Kirby B. Green Executive Director St. Johns River Water Management District January 27, 2009.
High Altitude View of ACF Regional Water Plans.
U.S. Department of the Interior U.S. Geological Survey Overview and Evaluation of the Current Hydrologic Data Network Scott Morlock USGS Indiana Water.
Dan Pennington Florida Department of Economic Opportunity Division of Community Development.
Water Supply Facilities Work Plan Amendment. Overview Background Statutory Requirements Meeting the Requirements Identified Issues Timetable.
PROPOSED BRUNSWICK COUNTY INTERBASIN TRANSFER PETITION REQUEST NOVEMBER 14, 2013.
Tom Reeder Division of Water Resources.  SGWASA = South Granville Water & Sewer Auth.  Provides water & sewer service to south Granville County, Stem,
Nunavut Water Board Public Hearing
Requirements for Low-Level Radioactive Waste Minimization Plans Rich Janati, M.S., Chief Division of Nuclear Safety PA Dept. of Environmental Protection.
Development and Application of a Groundwater-Flow Model of the Atlantic Coastal Plain aquifers, Aiken County, South Carolina to Support Water Resource.
Lantana/Lake Worth Area – 2009 vs. 2014
Allocation of Ogallala Groundwater Supplies
Utah, will we have enough water?
Department of Environmental Quality
Groundwater Management Area 12: Consideration of the Impact on
Florida and Reclaimed Water
Hudson Wetlands Protection Bylaw
Department of Environmental Quality Division of Water Resources
Department of Environmental Quality Division of Water Resources
Summary of Chesdin Reservoir Reliability
Cannery Park Project Public Hearing
Environmental Engineering
Department of Environmental Quality Division of Water Resources
Antelope Valley-East Kern Water Agency
Presentation transcript:

HEA 1738 IC as amended Water Resource Allocation and Distribution in Indiana IDNR Division of Water

Indiana Department of Natural Resources Division of Water Surface and ground water availability Surface and ground water availability 42 County Aquifer Systems Maps and 6 Basin Studies completed 42 County Aquifer Systems Maps and 6 Basin Studies completed USGS Gaging Network: USGS Gaging Network: 165 Stream Gages 165 Stream Gages 36 Monitoring Wells 36 Monitoring Wells 11 Lake & Reservoir Gages 11 Lake & Reservoir Gages Water withdrawal and Usage Water withdrawal and Usage

Division of Water Aquifer Systems Mapping 42 Counties Completed (shown in blue) 6 – 9 Maps Completed Annually (next shown in yellow)

Water Resource Assessments (Basin Studies) Six Completed

Real Time Stream Flow compared to historical data

Significant Water Withdrawal Facility IC Since 1986 the Division of Water has registered and monitored water withdrawal facilities with the capability of withdrawing more than 100,000 gallons water/day Since 1986 the Division of Water has registered and monitored water withdrawal facilities with the capability of withdrawing more than 100,000 gallons water/day

2006 STATE TOTALS Withdrawals (BG) Capacity (MGD) Withdrawals vs Capacity Number Surface Intakes %1409 Wells %5997 TOTAL %7406 Facilities 3507

Indiana Code : Water Rights: Emergency Regulation Provides for “Timely and Reasonable Compensation” to owners of domestic wells affected by high capacity ground-water pumpage Provides for “Timely and Reasonable Compensation” to owners of domestic wells affected by high capacity ground-water pumpage Provides for restrictions on high capacity ground-water pumpage under certain conditions Provides for restrictions on high capacity ground-water pumpage under certain conditions

IC : Emergency Regulation of Surface Water Rights Provides protection for owners of freshwater lakes against impacts of significant water withdrawal facilities Provides protection for owners of freshwater lakes against impacts of significant water withdrawal facilities Significant lowering of lake level must be documented Significant lowering of lake level must be documented Water level lowering must result in significant environmental harm Water level lowering must result in significant environmental harm

IC Minimum Stream Flow and Water Sale Contracts State of Indiana may sell water for water supply purposes: State of Indiana may sell water for water supply purposes: from reservoir impoundments financed by the state. from reservoir impoundments financed by the state. for a period of not more than 50 years. for a period of not more than 50 years. at the rate of thirty-three dollars ($33) per one million (1,000,000) gallons of water. at the rate of thirty-three dollars ($33) per one million (1,000,000) gallons of water.

Existing Water Supply Contracts: Dates, Terms, & Expirations LakeClientContract Term (yrs) Expires Avg. Daily Limit Annual Limit million gal. Brookville Brook Hill GC 1/7/05101/7/ Brookville Buck Point GC 7/2/03107/2/ Brookville Franklin Co Water 3/20/744012/31/ Hardy Stucker Fork CD 2/17/974012/31/38 no limit MonroeBedford2/21/68403/15/ MonroeBloomington1/7/05201/7/ Monroe Boy Scouts of Am. 5/15/90258/31/ Monroe Eagle Pointe GC 1/24/96104/22/ MonroeIPALCO9/24/802512/31/ Monroe Salt Creek Svcs. 2/9/68502/9/ Patoka Patoka Lake Reg. 6/25/ /25/

Brookville Lake Water Supply Storage: Water Supply Storage: 740 – 713 ft. (29,098 MG) Supply Committed: Supply Committed: 243 MG (0.8%) Annual Use (5 yr. ave.): 99.8 MG Annual Use (5 yr. ave.): 99.8 MG Firm Yield: Firm Yield: 82 MGD

Monroe Lake Water Supply Storage: Water Supply Storage: 538 – 515 ft. (52,136 MG) Supply Committed: Supply Committed: 10,967 MG (21.0%) Annual Use (5 yr. ave.): Annual Use (5 yr. ave.): 5,395 MG Firm Yield: Firm Yield: 122 MGD

Monroe Area Groundwater Availability

Patoka Lake Water Supply Storage: Water Supply Storage: 536 – 506 ft. (34,949 MG) Supply Committed: Supply Committed: 7,300 MG (20.8%) Annual Use (5 yr. Ave.): Annual Use (5 yr. Ave.): 2,251 MG Firm Yield: Firm Yield: 78 MGD

Patoka Area Groundwater Availability

Regulations Proposed Minimum Discharges for the Reservoirs (Sec 4) Minimum Discharges for the Reservoirs (Sec 4) Information requirements for the proposed use (Sec 5) Information requirements for the proposed use (Sec 5) Location, purpose, and term of use proposed Location, purpose, and term of use proposed Justification of reservoir as most economic and feasible source Justification of reservoir as most economic and feasible source Alternatives considered Alternatives considered Conservation Plan Conservation Plan Notice and public hearing procedures (sec 6 - 9) Notice and public hearing procedures (sec 6 - 9) Considerations (Sec 10-14) Considerations (Sec 10-14) Terms, conditions, & purposes of Reservoir establishment Terms, conditions, & purposes of Reservoir establishment Likelihood of adverse effects on environment & safety Likelihood of adverse effects on environment & safety Proximity of reservoir to use Proximity of reservoir to use Priorities of uses Priorities of uses Contingency Plan Contingency Plan