Zack Larson and Associates. Dual-frequency Identification Sonar (DIDSON) is promising new technology for enumerating anadromous fish in rivers. DIDSON.

Slides:



Advertisements
Similar presentations
Action Effectiveness Monitoring in the Upper Columbia (Chapter 4) Karl M. Polivka, Pacific Northwest Research Station, USDA Forest Service.
Advertisements

Workshop: Monitoring and Evaluation of Harvest on Columbia River Salmonids July 31- August 1, 2007.
LOWER YUBA RIVER ACCORD Monitoring and Evaluation Program Redd Surveys Casey Campos PSMFC.
NWHA- Panel Discussion “Spawning Better Ideas for Fish Passage”
Can Technology Save the Pacific Salmon? MBARI EARTH Workshop 2009 Ron Ozuna Roosevelt High School, Los Angeles, CA.
California State Water Project & MWD Tours. The Issue…..  The vast majority of water in the State of California falls in the top 1/3 of the state (north.
Civil Works Baltimore District River and Harbor Projects.
Line Efficiency     Percentage Month Today’s Date
Drainage District #7 Pump Station Retrofits for Safe Fish Passage Ryan Bartelheimer, P.E. Snohomish Conservation District.
California Department of Fish and Game Input to the CVPIA (b)(2) Decision Process Russell J. Bellmer Fisheries Branch California Department of Fish and.
California Steelhead – End of The Rainbow Katie Perry Steelhead Restoration & Management Program.
Research Fishery Biologist NOAA Fisheries Maine Field Station John F. Kocik, Ph.D.
Stock Status of Steelhead In California Katie Perry, California Department of Fish and Game.
RELATIVE VELOCITY IN 2D. WARM UP A boat travels at a constant speed of 3 m/s on a river. The river’s current has a velocity of 2 m/s east. 1.If the boat.
AOOS Board Anchorage, October 17, IOOS Association - Treasurer & EXCOM - Retreat in August - National budget - Certification Ocean Research Advisory.
State of Oregon New Hydroelectric Projects Mary Grainey October 2008 Oregon Water Resources Department.
Pacific Fishery Management Council Jurisdiction –3 miles to 200 miles –4 states (includes Idaho) Members -- appointed –State governments –Federal Agencies.
Horse Creek Damolition Presenters: Matt Stoecker, Stoecker Ecological and Thomas B. Dunklin Productions.
Cape Fear River Fisheries Restoration: An Economic Engine October 31, 2013 Dawn York, Coastal Scientist October 31, 2013 Dawn York, Coastal Scientist.
BUILDING STRONG ® PORTLAND DISTRICT 1. BUILDING STRONG ® PORTLAND DISTRICT 2 BiOp Performance Standards for Dam Passage Survival RPA RM&E Actions - Strategy.
Lewis River Fish Passage Monitoring and Evaluation Plan (draft)
Exploration of DIDSION Technology; Spawning Site, Confirmation/Characterization and Spawner Behaviour Observation May 26 – 29, 2009 Pilot Explorations.
Nan Wap Marine Protected Area  Located east side of Pohnpei  Is about acers (3.04 km2)  Lies 1.13km off the eastern coast of Metipw.
Kilarc-Cow Creek Hydroelectric Project Decommissioning FERC Project No. 606 Technical Meeting May 16, 2007, 1-4 pm Red Lion Redding, CA.
History of the Christina Lake Commercial Kokanee Fishery Currently, Christina Lake is a popular recreation destination. One main recreational activity.
Status of Steelhead in Alaska Brian Marston Area Fisheries Biologist Alaska Department of Fish and Game Division of Sport Fisheries, Yakutat, Alaska.
Fish and Game Commission Meeting December 11, 2013 Marci Yaremko State/Federal Fisheries Program Marine Region 1 Photo: Edgar Roberts.
Comparison of Catch Data from the California Steelhead Fishing Report-Restoration Card and the Recreational Angler Survey for the Smith River (Del Norte.
Fish and Game Commission Meeting October 8, 2014 Stafford Lehr Fisheries Branch 2014 Proposed Fresh Water Sport Fishing Regulation Changes.
Summary ADF&G is implementing a radio telemetry study on Yukon summer chum salmon Use drift gillnets to catch and tag 1200 chum salmon near Russian Mission.
ELandings Help: Where, When and How to Get Assistance.
CVPIA §3406(b)(2) Water Operations on the Sacramento River Sacramento River Conservation Area Forum Technical Advisory Committee February 7, 2012.
Minimum Qualifications: The applicant must be an Alaskan resident and meet the minimum qualifications for a graduate degree program at the University of.
Okanogan River Fish Update for the IOLBC Okanogan Basin Monitoring and Evaluation Program (OBMEP) Osoyoos Lake Water Science Forum Presenter: John.
Chesapeake Fish Passage Prioritization Project: Overview MARY ANDREWS NOAA JULIE DEVERS USFWS ERIK MARTIN THE NATURE CONSERVANCY CHESAPEAKE BAY FISH PASSAGE.
First year monitoring of newly constructed oyster platforms in Sarasota Bay, Florida Jay R. Leverone 1 and Gary Raulerson 2 1 Mote Marine Laboratory, Sarasota,
Fish and Game Commission Meeting December 3, 2014 Marine Region 1 Photo: Edgar Roberts.
Ground Water Assessment Drought Management Advisory Council Meeting April 1, 2010 Nat Wilson ( or Ground Water Management.
Ecosystem Restoration Program Focused Proposal Solicitation Package 2010/2011 Prepared by ERP Implementing Agencies: California Department of Fish & Game.
Support for continued partnership with the Ocean Science Trust: Marine Protected Area (MPA) Monitoring Enterprise Science Advising Science Initiatives.
Alameda Creek Watershed San Francisco Public Utilities Commission October 27, 2009.
Gill Nets and Unauthorized Interactions with Sea Turtles Overview of Events Feb. 18, 2010.
© 2015 Water Research Foundation. ALL RIGHTS RESERVED. © 2015 Water Research Foundation. ALL RIGHTS RESERVED. No part of this presentation may be copied,
Linking seasonal migratory patterns with prey availability in Steller sea lions Jamie N. Womble 1, Michael F. Sigler 2, Mary F. Willson 3 1 National Park.
YOSEMITE BY ARSAL.
Jan 2016 Solar Lunar Data.
Precipitation, Streamflow and a Look at Little Bear River Contaminants
IT Strategy Roadmap Template
Building a Fishway for Sturgeon
Jay R. Leverone1 and Gary Raulerson2
Upper Deschutes River Basin Steelhead Reintroduction
Steelhead status in Idaho – 2012 Update
Average Monthly Temperature and Rainfall
Roza Dam Evaluation Post Modifications
SAFETY IS TVA’S NUMBER ONE PRIORITY
Constructing Climate Graphs
Michelle Rub and Laurie Weitkamp NOAA Fisheries
Gantt Chart Enter Year Here Activities Jan Feb Mar Apr May Jun Jul Aug
Adult PIT-tag Interrogation System Wells Hydroelectric Project (System Design, Installation and Evaluation)     Shane Bickford* Public Utility District.
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
26 Oct 2017 – May 2019 Well water level monitoring data
Presentation transcript:

Zack Larson and Associates

Dual-frequency Identification Sonar (DIDSON) is promising new technology for enumerating anadromous fish in rivers. DIDSON is a multi-beam, high-definition imaging sonar that produces video-like images of fish and can detect fish as far as 80 meters away. DIDSON is generally positioned in the water near the bank to view a cross section of the channel. Fish are imaged and counted as they pass through the sonar beams. Unbiased fish counts and reasonably accurate length measurements can be derived. The Alaska Department of Fish and Game (ADF&G) has tested DIDSON for counting salmon in rivers and the technology has consistently exceeded their expectations for counting salmon. They also find the technology increases their confidence in overall fish passage numbers, improves their credibility with user groups and ultimately makes fisheries management decisions easier.

 Investigate the usefulness of DIDSON for monitoring salmon and steelhead abundance in coastal California Rivers.  Develop standardized approaches to operating sonar fish counting stations on North Coast rivers.  Complement ongoing fisheries research  Help California achieve anadromous fisheries management objectives.

 CDFG Fisheries Restoration Grants Program  Steelhead Report Card  County of Del Norte  Smith River Advisory Council  Smith River Alliance  California Trout  Humboldt State University  Alexandre EcoDairy Farms  Sound Metrics Corporation  Ocean Marine Industries  Northern California FFF  Zack Larson & Associates ( Project Leader ) 2008 Smith River DIDSON Workshop

The Smith River Sonar Station is located 6 river miles from the Pacific Ocean at the Public Boat Launch Facility off Fred Haight Drive near the town of Smith River.

Two Long Range DIDSON units are deployed from both sides of the Smith River 24 hours per day, 7 days per week from October 1 to April 15 th. Data is recorded in 20 and 30 minute files and immediately processed in an onsite utility building connected to grid power.

Justin Garwood, DFG

Three fish observed from 22 meters to 25 meters from shore

Length measurements of targets can be recorded with the Sound Metrics DIDSON software. The individual fish shown to the right is approximately 3.7 feet or 44 inches in length.

EMPIRICAL DATA Total Upstream Detections 43,479 Total Downstream Detections 11,235 Net Upstream Detections 32,234 Chinook salmon and steelhead estimates 25 Oct – 15 Dec (Chinook salmon): Net Upstream Detections 21, Dec – 15 Apr (Steelhead) Total Upstream Detections12,475

WEEK# UPSTREAM# DOWNSTREAMTOTAL UPSTREAM FISHFISHING EFFICIENCY Oct % Oct % Oct % Oct. 25-Nov % Running Total % WEEK #UPSTREAM#DOWNSTREAM TOTAL UPSTREAM FISH % FISHING EFFICIENCY Oct % Nov #VALUE! 49.56% Nov % Nov % Nov Dec % Dec. 2 - Dec % Dec Dec % Dec Dec % Dec Jan % Jan. 3 - Jan % Jan Jan % Jan Jan % Jan Feb % Feb. 4 - Feb % Feb Feb % Feb Feb % Feb Mar % Mar. 8 - Mar % Mar Mar % Mar Mar % Apr. 1 - Apr % Apr. 9 - Apr % 2010/ /2012 SONAR STATION EFFICIENCY

 Construction and permitting$18,901  DIDSON LR package$96,220  Operating costs (2-years)$279,907  Del Norte Co. Administration $29,881  TOTAL COST (DFG)$424,90  SRA COST MATCH$69,487 ANNUAL OPERATING COSTS $140,000