Multipurpose Planning Module M1: Multi-purpose Plan Formulation – Policies and Constraints BU ILDING STRONG SM.

Slides:



Advertisements
Similar presentations
What We Heard at the November 2011 Community Workshops.
Advertisements

Introduction to Water Resources Planning. WELCOME.
Identify Problems, Planning Objectives and Constraints.
US Army Corps of Engineers BUILDING STRONG and Taking Care of People! Ecosystem Restoration Along the Los Angeles River: Creativity within Concrete Dan.
Multipurpose Projects Module M2: Cost Allocation BU ILDING STRONG SM.
Plan Formulation: General
F4B - 1 BU ILDING STRONG SM Flood Damage Reduction Module F4: Reformulation – Optimization, Incremental Analysis and Selection of the NED Plan.
F1B - 1 BU ILDING STRONG SM Flood Risk Management Module F1: Authorities and Policies.
KEEPING WATER ON THE LAND Brandon Workshop March 20, 2013.
NWHA- Panel Discussion “Spawning Better Ideas for Fish Passage”
Preparing for the Rainy Season SFWMD Operations & Actions.
US Army Corps of Engineers BUILDING STRONG ® Vertical Team Roles & Responsibilities Planning Principles & Procedures – FY11.
U. S. Army Corps of Engineers Philadelphia District How to start the Corps’ Project Delivery Engine Local Sponsor Identifies A Problem and Requests Corps.
Identify Problems, Planning Objectives and Constraints
Dredging, Disposal Management and Impacts on Lake Sediments US Army Corps of Engineers.
Water Resources In the United States: Perspectives and Challenges by Dr. Jerome Delli Priscoli Institute for Water Resources US Army Corps of Engineers.
A HISTORY OF WATER RESOURCES POLICIES AND GUIDANCE Overview Briefing for Planning Associates Class of 2011 by John C. Furry 3 March 2011.
Community-based Education K-12 students serving as a resource for meeting community needs.
1 Building Strong! THE ECONOMIST’S ROLE Ken Claseman Senior Policy Advisor for Economics Office of Water Project Review HQUSACE
Bureau of Reclamation Overview Christopher Cutler Deputy Chief Boulder Canyon Operations Office.
Ecosystem Restoration Module ER4: Cost Effectiveness/Incremental Cost Analysis and the NER Plan BU ILDING STRONG SM.
Economic Analysis of Water Supply and Water Quality Benefits IRWM Round 2 Roger Mann Lorraine Marsh Steve Hatchett Jerry Horner.
NED COSTS And Other Bewilderments Of COE Planning And Other Bewilderments Of COE Planning.
NRCS Watershed Rehabilitation
Coastal Texas Protection and Restoration Project
Jan 2005 Kissimmee Basin Projects Jan Kissimmee Basin Projects Kissimmee River Restoration Project (KRR) Kissimmee Chain of Lakes Long Term Management.
State of Oregon New Hydroelectric Projects Mary Grainey October 2008 Oregon Water Resources Department.
1 U.S. ARMY CORPS OF ENGINEERS AND ST. JOHNS RIVER WATER MANAGEMENT DISTRICT Indian River Lagoon North Restoration Feasibility Study Public Meeting September.
Module 27 Continuing Authorities Program Module 27 Continuing Authorities Program Civil Works Orientation Course - FY 11.
US Army Corps of Engineers BUILDING STRONG ® Hydropower Trends in the U.S. A U.S. Army Corps of Engineers Perspective Brent Mahan Director, Hydroelectric.
Building Strong! 1 US Army Corps of Engineers Regulatory Program Kimberly McLaughlin Program Manager Headquarters Operations and Regulatory Community of.
Module 11 STEPS 4 & 5 Conduct Reconnaissance Study & Report Certification Civil Works Orientation Course - FY 11.
US Army Corps of Engineers BUILDING STRONG ® US Army Corps of Engineers Watershed Authorities, Policies and Procedures Michael Greer Regional Technical.
Basin Implementation Planning SOUTHWEST BASIN ROUNDTABLE July 16, 2014.
The South Florida Region and its Water Management System Linda Lindstrom, P.G. Director Environmental Resource Assessment Department South Florida Water.
1 Environmental Planning in the Army Corps of Engineers Ch 2 Mod 5 Relationship of the NEPA to Principles & Guidelines
“Getting the Funding Right” Kim Koleos Juris Doctor, University of Florida.
Ecosystem Restoration Module ER1: Authorities and Policies.
Chapter 33 Dam Construction. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Give reasons why.
NOAA Restoration Center Implementing the Gulf Regional Sediment Management Master Plan …responding to an ongoing emergency, improving responses to new.
Harbors Module NH1: Authorities and Policies. NH1 - 2 BU ILDING STRONG SM Student Learning Objectives Student will be able to:  Describe the Federal.
State Water Planning Presented to State Water Plan Regional Advisory Committees December 8-19, 2003 William A. Gast Chief, Division of Water Use.
U.S. Army Corps of Engineers Decision Authority l All permit decisions, scope of analysis, 404(b)(1), mitigation, alternatives, jurisdiction -- Corps.
COMPREHENSIVE FLOODPLAIN MANAGEMENT : Promoting Wise Uses of Floodplains CA Department of Water Resources/ CIFMCG Workshop July 2006.
US Army Corps of Engineers BUILDING STRONG ® Planning Principles & Procedures – FY11 AUTHORIZATION AND APPROPRIATION OR “It Takes Two to Tango"
Roseau River Flood Damage Reduction Project Roseau, Minnesota.
US Army Corps of Engineers Chicago District FY04tpr\skbcongressional Civil Works Program Missions Missions Process Process Select Authorities Select Authorities.
Solano Habitat Conservation Plan 580,000 Acres 36 Covered Species; 4 Natural Communities 17,500 acres of Urban Development; 1,280 acres of other New Facilities.
© 2009 Barnes & Thornburg LLP. All Rights Reserved. This page, and all information on it, is the property of Barnes & Thornburg LLP which may not be reproduced,
Flood Risk Management Cosgrove Creek Section 205 Planning Basics.
Harbors Module NH3: Formulation – Measures, Strategies and Plans.
Implementation of critical studies necessary to promote better planning and efficient management of hydropower projects in an Int’l River Basin context.
Central & Southern Florida Project George Horne Deputy Executive Director Operations & Maintenance Resource Area.
Preliminaries Federal/Corps Planning Process PA Program Plan Formulation Supplement - FY 08.
1 Atchafalaya River and Bayous Chene, Boeuf, and Black, Louisiana Dredged Material Management Plan (DMMP) Kick off Meeting April 13, 2005 Project Manager.
Rebuilding the System Reducing the Risk California Water Plan Plenary Session October 22-23, 2007.
California Water Plan Update Advisory Committee Meeting January 20, 2005.
MEKONG RIVER COMMISSION PROGRAMMES FOR SUSTAINABLE DEVELOPMENT.
US Army Corps of Engineers BUILDING STRONG ® OVERVIEW OF THE CIVIL WORKS PROCESS Planning Principles & Procedures – FY 11.
US Army Corps of Engineers BUILDING STRONG ® Step 6: Selection Of The Recommended Plan Planning Principles & Procedures – FY11.
MRERP Missouri River Ecosystem Restoration Plan and Environmental Impact Statement One River ▪ One Vision A Component of the Missouri River Recovery Program.
Beneficial Use of Dredge Materials: Introduction to Dredging and Policy J. Bailey Smith US Army Corps of Engineers April 4, 2011.
Environmental Planning in the Army Corps of Engineers Relationship of the NEPA to Principles & Guidelines 1 Ch 2 Mod 5
US Army Corps of Engineers BUILDING STRONG ® Miles City, Montana Section 205 Gwyn M. Jarrett - Project Manager Omaha District April 27, 2016.
Ecology and environment, inc. ecology and environment, inc. International Specialists in the Environment Georganna B. Collins, International.
Legislative History. First enacted in 1934  Enacted due to concerns over the loss of commercial and sport fisheries from water resource developments.
Overview of USDA - PL-566 Small Watershed Program - EWP Program Mahoning County FRM Informational Meeting August 16, 2016 Natural Resources Conservation.
PRINCIPLES & GUIDELINES
Integrating Wetlands and Watershed Management: Lessons from the U.S.
Continuing Authorities Program
Presentation transcript:

Multipurpose Planning Module M1: Multi-purpose Plan Formulation – Policies and Constraints BU ILDING STRONG SM

M1 - 2 BU ILDING STRONG SM Student Learning Objectives The Student will be able to:  Distinguish between “multipurpose” and “multi-objective”  Discuss the Corps history of multipurpose projects  Distinguish high priority or “stand alone” purposes, from “add on” or other purposes  Identify the major distinguishing attributes of watershed planning  Distinguish between avoidance, mitigation and restoration  Provide examples of realistic multipurpose plans

M1 - 3 BU ILDING STRONG SM Definitions  Planning is multi-objective  A good planning study always has several planning objectives  Projects are multipurpose  Purposes may include navigation, flood damage reduction, ecosystem restoration, hurricane and storm damage prevention, water supply, hydroelectric power generation, and recreation

M1 - 4 BU ILDING STRONG SM Definitions  A “Stand alone” project purpose may only consist of one of the Corps’ high priority purposes: flood damage reduction, navigation or ecosystem restoration.  “Add-on” project purposes consist of one or more purposes (usually other than high priority) where opportunities exist.

M1 - 5 BU ILDING STRONG SM Multipurpose Formulation Approaches Three General Approaches  Comprehensive - the preferred method, giving full consideration to all planning objectives and constraints (“pure” multipurpose)  Add-on - where opportunities are evident, but may not be a part of the initial formulation  Incidental – You hope for good things to happen or when good things happen to bad projects

M1 - 6 BU ILDING STRONG SM Continuum of Formulation Approaches Single Purpose Project Multiple Purpose Project Incidental benefits Added on purpose Formulated for MP

M1 - 7 BU ILDING STRONG SM What’s Old is New Again  Multipurpose projects and planning grew slowly, starting in 1808 (Gallatin Report)  Multipurpose projects peaked in the 1960s, lead by Dams and Reservoirs  Environmental concerns led to a decrease in reservoirs and hence multipurpose efforts  Now environmental concerns are leading to an increase in NER and multipurpose efforts

M1 - 8 BU ILDING STRONG SM Multipurpose History  Gallatin’s 1808 report to Congress  Multi-objective: political unity, national defense, economic development of West  Multipurpose: waterways,canals, roads  Swamp Acts  Flood control linked to navigation  Conservation Movement  Development and wise use  Multipurpose: navigation, irrigation, hydroelectric power, water power, flood control

M1 - 9 BU ILDING STRONG SM Multipurpose History 308 Reports  1925 Corps and Federal Power Commission  Survey of all US streams with power development potential  Formulated general plans  Navigation  Power  Flood control  Irrigation

M BU ILDING STRONG SM Multipurpose History  Flood Control Act of 1944  Municipal and Industrial Water Supply becomes a full project purpose for reservoirs, as does recreation  Senate Document 97 of 1962  River basins the preferred planning area  Multipurpose planning to be used  Principles and Standards of 1973  NEPA integrated into multipurpose planning  Hierarchy of mitigation approaches is a planning consideration  P&G of 1983

M BU ILDING STRONG SM Overall Trends: Multipurpose in the 21 st Century  Mid 20th century was “Golden Age” of multipurpose projects - Navigation, flood control, irrigation, M&I water, hydropower, water quality, recreation

M BU ILDING STRONG SM Overall Trends: Multipurpose in the 21 st Century  Today multipurpose is likely a mix of ecosystem restoration and other high priority outputs  Navigation, flood damage reduction  With some recreation added on  Watershed Planning facilitates multipurpose planning- similar to the comprehensive river basin studies ( Section 308 studies, 1926)  Environmental Sustainability is an initiative to further multipurpose planning and projects

M BU ILDING STRONG SM Indian Bend Wash

M BU ILDING STRONG SM

M BU ILDING STRONG SM Current Policy  Wherever possible and subject to budgetary policy…projects shall combine purposes to formulate multiple purpose projects.  It is fundamental to the planning process to investigate the full range of solutions to problems, and to develop comprehensive solutions to problems.

M BU ILDING STRONG SM High Priority Purposes  Flood Damage Reduction  Navigation  Ecosystem Restoration

M BU ILDING STRONG SM Other Project Purposes Hurricane and Storm Damage Reduction Recreation Water Supply Hydroelectric Power

M BU ILDING STRONG SM Hurricane and Storm Damage Reduction  May use both structural and non-structural measures  Should be formulated as the primary purpose if part of a multi- purpose recreation project  Current policy does not support new beach nourishment projects (viewed as ongoing construction)  Projects supporting primarily recreation activities should be undertaken by non-Federal interests  Cost sharing is dependent on land ownership and use

M BU ILDING STRONG SM Hurricane and Storm Damage Reduction Miami Beach, Florida

M BU ILDING STRONG SM Recreation  May be included in multipurpose formulation  May be added to project formulated for other high priority purposes  May be incidental to other high priority purposes  Cost sharing is 50/50  Costs limited to 10% of flood damage reduction and/or ecosystem restoration costs  No single purpose projects allowed  Only additional lands for access may be purchased  Limitations on facilities

M BU ILDING STRONG SM Lake Shelbyville Recreation Area, IL (St. Louis District)

M BU ILDING STRONG SM Water Supply  Surplus water available where no water rights assigned  Municipal and industrial water  Agricultural water  No single purpose water supply studies/projects

M BU ILDING STRONG SM Hydroelectric Power  Measures  Hydroelectric power facilities  Pumped storage  Implemented at 100% local sponsor cost  No single purpose projects

M BU ILDING STRONG SM Watershed Planning  Watershed is the study area  Multiple planning objectives - may be broader than the Corps’ typical authorities and purposes  May include multiple agencies  Output more a program than a project  Multiple purpose solutions to watershed problems  May include multiple purpose projects  May be implemented by others  May include Corps projects

M BU ILDING STRONG SM Spirit of Multipurpose Projects Exercise 1  Dams store water  What planning objectives and constraints are being addressed?  Which project purposes could be included? Excluded?  How much storage for each purpose?  When and how would you decide?

M BU ILDING STRONG SM Pine Flat Dam, CA

M BU ILDING STRONG SM Pine Flat Dam

M BU ILDING STRONG SM Spirit of Multipurpose Projects Exercise 2  You have identified two planning objectives:  Increase the quantity and quality of riverine terrestrial native habitats  Reduce flood damages to the residential community  The study has two purposes: ecosystem restoration and flood damage reduction

M BU ILDING STRONG SM NER/NED Multipurpose Plans  Many measures  Combined with other high priority purposes  And often, recreation  Examples, big and small  Everglades  Napa  Indian Bend Wash  Poplar Island  Houston Ship Channel  DMMPs

M BU ILDING STRONG SM Napa River

M BU ILDING STRONG SM Napa River

M BU ILDING STRONG SM Napa River

M BU ILDING STRONG SM Flood Damage Reduction & Ecosystem Restoration  Nonstructural and ecosystem restoration  Evacuation, relocation and habitat quantity  Land use management and habitat quality  Structural and ecosystem restoration  Set back levees  Ponds  Wetlands

M BU ILDING STRONG SM Middle Creek, CA

M BU ILDING STRONG SM Navigation & Ecosystem Restoration  Channel projects  Harbor improvements  Dredged material management  Continuing Economic Justification  Alternatives  Base Plan  Beneficial Uses

M BU ILDING STRONG SM Houston Ship Channel

M BU ILDING STRONG SM Beneficial Uses Each management plan study shall include an assessment of potential beneficial uses of dredged material for meeting non-navigation objectives, including fish and wildlife habitat restoration, hurricane and storm damage reduction, and recreation.

M BU ILDING STRONG SM Poplar Island MD

M BU ILDING STRONG SM Types of Beneficial Uses  Restoration and Protection of Environmental Resources  Placement of Material on Beaches  Other Beneficial Uses  Land creation  Beach placement or restoration not meeting Corps participation criteria

M BU ILDING STRONG SM Sonoma Baylands, CA

M BU ILDING STRONG SM Take Away Points  Comprehensive planning is the preferred method, giving full consideration to all planning objectives and constraints  Watershed planning is comprehensive planning  Projects may have incidental outputs related to other purposes  Features to address additional purposes can be added to plans  The best multi-purpose projects are formulated by simultaneously addressing multiple planning objectives that reflect multiple project purposes.

M BU ILDING STRONG SM Where We are Going Next, we’ll cover:  Cost allocation and cost sharing  The SCRB method of cost allocation  The way in which the SCRB method can be applied to a project with ecosystem restoration as a project purpose

M BU ILDING STRONG SM Challenge Question: What do you do when the problems in a watershed would be best solved using a comprehensive approach, yet the cost-sharing study sponsor is limited to a single purpose?