Press Room Strip Inventory Analysis Kyle Jiron IE 496 Spring 2015.

Slides:



Advertisements
Similar presentations
Securing America: Solving Oil Dependence Through Innovation Daniel Lashof, Ph.D. Natural Resources Defense Council March 17, 2005.
Advertisements

Press Forming By Lewis & Joe What Is Press Forming Where Is It Used In
Wright Line By Alexzander Downs Noopur Srivastava Amit Chaturvedi Amit Jhawar Yi-fang Lin.
Just-In-Time Manufacturing. Just-In-Time Manufacturing? Just-In-Time Manufacturing? What is JIT Manufacturing? What is JIT Manufacturing? Where did it.
American Greetings: New Beginning Team AI: Will Cheesman- Innovation and Creativity Nakul Rajaram- Project Management Andrew Schuch- Technical Contributions.
VCI anticorrosion and Industrial packaging By Jinny Kim Business Manager - Industrial 1.
1 Session 20 Just-in-Time Systems Toyota’s JIT system –JIT elements –Kanban cards –Kanban system rules –Two card and kanban system rules –Toyota MPS policy.
IP Introduction © Oxford University Press 2011 Introduction.
Use of Physical Simulation, Computer Simulation and a Common Product in a Series of Courses to Illustrate Industrial and Manufacturing Engineering Technology.
Sources of Information for Manufacturing Facilities Design
CHARTER SPECIALTY STEEL
PROCESS IMPROVEMENT PRESENTATION
IENG 451 JIT. Production Physics Little’s Law Throughput = WIP/Cycle time For fixed capacity, cycle time and WIP or proportional – thus you can increase.
Business 100 Introduction to Business Dr. Kathy Broneck.
Low Carbon Action Group results. The nature of our business means a large amount of energy needs to be used, but we are looking to compensate that with.
Throughput World. 2 Ardavan Asef-Vaziri Nov-2010Theory of Constraints: 2- Basics Systems Thinking and TOC  TOC Premise 1: The Goal of a business is to.
Production Planning & Control
Lean Manufacturing Case Study Prototype Design-Build.
CONTINUOUS IMPROVEMENT PROGRAM
© ABSL Power Solutions 2007 © STM Quality Limited STM Quality Limited Introduction to Lean Manufacturing TOTAL QUALITY MANAGEMENT Lean Manufacturing.
SchedulingProducingControllingSchedulingProducingControlling.
1 Employability skills (a) Employers value people who: fit well into their team and workplace use initiative to solve routine problems work productively.
Coastal Printing Continuous Improvement and Flex Program.
Managing Production and Supply Chains An introduction to the ProSim production management simulation.
© Copyright 2010 Dresser-Rand Gasket Cell Relocation [Revision: May, 2011] Team Members: Cody Willmart, Aaron Marcotte, Jacky Li, Daniel Swol, Tyler Borden.
Principles of Manufacturing M anufacturing Mathematics Copyright Texas Education Agency (TEA)
Vermont ASQ Meeting March 24, 2005 Jeffrey S. Solomon General Dynamics Burlington, VT Kaizen: Focused, Fast Team Improvement.
Using Lean Principles to Eliminate Proposal Waste
Managerial Accounting: Overview Chapter One  FINANCIALMANAGERIAL  OutsideInside  Follow GAAP/IFRSTimely and Relevant  Standard Report FormatReports.
Organizing Data Section 2.1.
Binghamton University 4/27/2010 Inventory Control.
So…..what is Advanced Manufacturing? Advanced Manufacturing is: The utilisation of enabling technologies, incorporating design and business process innovation.
Paper Towels and Hand Dryers BY: Christina Vang, Selina Lor, Ka Houa Xiong, and Chane Chang VS.
Formula? Unit?.  Formula ?  Unit?  Formula?  Unit?
* * Chapter Nine Production And Operations Management Copyright © 2010 by The McGraw-Hill Companies, Inc. All rights reserved.McGraw-Hill/Irwin.
© BMA Inc All rights reserved. Inventory valuation Lean reporting & control.
Lean Manufacturing in a Continuous Process G Mérian 5/3/04.
7 Types of Waste –C –Correction –O –Overproduction –M –Movement of Material & Information –W –Waiting –I –Inventory –P –Processing Lean Principle: Lean.
SchedulingProducingControllingSchedulingProducingControlling.
The Lean Enterprise Push versus Pull Lean Foundations Continuous Improvement Training Lean Foundations Continuous Improvement Training.
Manufacturer of High Quality Precision Tubing and Parts.
Measurement & Analysis Team Lean Sigma Project
Chapter 16 & 9 Scheduling Work & Employees. Scheduling Outline What needs to be scheduled? –doctor’s office, restaurant, mfg. plant, hospital –employees.

1. Overview of Metal Forming 2. Material Behavior in Metal Forming ©2007 John Wiley & Sons, Inc. M P Groover, Fundamentals of Modern Manufacturing 3/e.
1 Chapter 12 Just-In-Time and Lean Manufacturing Supplemental Slides.
Lean Production Quality Management (HL). By the end of the chapter You should be able to … Outline the following features of lean production Less waste;
Production management Content – Core work process – 6 W – Production classification – EOQ – Lean Manufacturing – Systems of Management production.
Speeds and Feeds Computer Integrated Manufacturing
Aggregation To combine the creation of many similar products into one relevant measure of activity for the organization. Click here for Hint heuristic.
Choosing Lean Manufacturing Presented to you by : Vrunda Consultancy Service, Ahmedabad.
OPS 571 Week 2 DQ 3 To purchase this material click below link 571-Week-2-DQ-3 Explain how having more work-in-process.
ACC 422 Week 1 DQ 2 To purchase this material click 422/ACC-422-Week-1-DQ-2 What is the perpetual method of tracking.
February 14, 2013 Lean Accounting What is it?.
Operations Module 2-1.
Strategic Capacity Management
A Look into Efficiency in Business
Value Stream Costing Mahmoud Al-Odeh, PhD Bemidji State University.
Charting Best Practices
Company Registration: Procedure that one needs to follow Company Registration: Procedure that one needs to follow
GANTT CHART Text Text Example
MANUFACTURING TECHNOLOGY I PRESENTED BY KANNAN P., AP/MECH.
BUS 307 HOMEWORK Education Your Life--bus307homework.com.
Continuous Improvement”
WGEP – Case Study Western Geophysical Exploration Products (WGEP) was barely seen by the customers, once they had a lot of problems, like marginal product.
Operations Management
March 20, 2013 Student Investment Committee - Industrials Group
Asset Capture Workflow Process
Manufacturing Production Planning
Cummins Comparison Orbit Charts
Presentation transcript:

Press Room Strip Inventory Analysis Kyle Jiron IE 496 Spring 2015

German based company Purchased American Brass plant of Buffalo in 2006 Manufacturer of rolled metals (brass and copper) Aurubis Buffalo

Use lean principles to increase efficiencies in Press Room procedures and reduce waste throughout the system Objective

Reduce Press Room strip holding inventory Develop better strip ordering practices Decrease WIP throughout system Project Goals

Gantt Chart Project Timeline

Current level: 1.4 million lbs Target levels: 800k lbs Revised: 1 mil +/- 200k lbs Holding Inventory

521 Coil cuts in holding inventory 1.36 million lbs 121 Cuts aged two months or older 278,634 lbs Holding Inventory

Process Map (Light vs. Intermediate vs. Heavy) Lead Times Formula Strip Ordering

Light Gauge Orders open for 6+ weeks in advance Process Map (220s) & Lead Times

Intermediate Gauge Orders open 5+ weeks in advance Process Map (260s) & Lead Times

Heavy Gauge Orders open 4+ weeks in advance Process Map (260s) & Lead Times

Order 6 days out 13 bars per order Ordering Formula

About 1 million lbs of coil in system throughout slitters and annealers leading up to the Press Room Inventory in System (WIP)

Current: 1 million lbs in WIP Goal: 400,000 +/- 150,000 lbs Inventory in System (WIP)

Changing the Kanban from being located at the casting area to being located before the 44 roll in the plant New Kanban System