Experiment beam line installation (9/4/2014) SystemThus FarTo Do Vacuum~10 -10 Torr, IP’s on, Vac interlock checkNone Fast valveValve + CCG installed,

Slides:



Advertisements
Similar presentations
PEPPo Weekly Status Meeting February 16, 2011 & 6MSD Planning Meeting February 23, 2011 Part 1 – Technical summary of layout Part 2 – Month-by-Month Installation.
Advertisements

G2P Target installation and Beyond. Schedule Pivot before.
Pair Spectrometer Design Optimization Pair Spectrometer Design Optimization A. Somov, Jefferson Lab GlueX Collaboration Meeting September
Hall D Photon Beam Simulation and Rates Part 1: photon beam line Part 2: tagger Richard Jones, University of Connecticut Hall D Beam Line and Tagger Review.
Upcoming Review of the Hall D Photon Beam and Tagger Richard Jones, University of Connecticut, for the GlueX collaboration GlueX Collaboration Meeting.
Paul Emma LCLS FAC April 16, Initial Experience with Injector Commissioning P. Emma, et al. Facilities Advisory Committee.
LTU & Electron Beam Dump Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Technical Design.
TAGGER MAGNET DESIGN Presented by Tim Whitlatch Hall D Tagger Magnet Design Review July 10,
TEST BEAMS Stanford Linear Accelerator Center Ted Fieguth DoE/SLAC Program Review April & May 1, 1997.
Tagging spectrometer and photon beamline Review January 23-24, Response to Questions Bremsstrahlung Tagging Spectrometer and Photon Beam Review.
The 2nd Tevatron Electron Lens and tests of a new electron gun in the framework of Beam-Beam Compensation project Yu. Alexahin, V. Kamerdzhiev, G. Kuznetsov,
Bubble Chamber Planning Meeting 04 September
SHMS Detector Commissioning and Installation Howard Fenker Hall-C Users Meeting Jan-2015.
PAIR SPECTROMETER DEVELOPMENT IN HALL D PAWEL AMBROZEWICZ NC A&T OUTLINE : PS Goals PS Goals PrimEx Experience PrimEx Experience Design Details Design.
Status and Integration of the Spectrometer Solenoid Magnets Steve Virostek Lawrence Berkeley National Lab MICE RAL June 15, 2007.
Bubble Chamber Experimental Readiness Review September.
23 July 2012D. Sober1 Some thoughts on Hall D tagger magnet field mapping D. Sober Catholic University of America GlueX Beam/Tagger biweekly meeting 23.
Beamline update Ken Moffeit 5 June 2013 The Beginning Overview of the beamline Beam diagnostics Silicon Protection New options for location of HPS Beamline.
Bubble Chamber Installation Kick-Off Meeting May 28, 2014, Grames Let’s discuss two jobs between the cryounit and injector gate. Bubble chamber (5D) New.
Status of the Beamline Simulation A.Somov Jefferson Lab Collaboration Meeting, May 11, 2010.
WBS1 SBS Basic: Magnet and Infrastructure Robin Wines 11/4/ SBS DOE Review.
Injector/Re-injection Chicane Michael Bevins May 17, GeV Upgrade - Beam Transport Injection, Linac, Extraction, & Correctors Preliminary Design.
November 18, 2008 John Haggerty 1 PHENIX In Run 9 John Haggerty Brookhaven National Laboratory.
HPS Collaboration Meeting JLAB, May Tracker Design Status M.Oriunno, SLAC.
Measurement of Gas Bremsstrahlung at the Pohang Light Source Hyosang Lee Seoul National University, Q2C Pusan National University, HANUL HNP2011.
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
Bubble Chamber: Experimental Overview August 18, 2015.
G2p/GEp Beamline Tim Michalski Project Lead. Beamline Overview Slow Raster Tungsten Calorimeter Upside Down Girder (correctors, BCM, superharp) FZ1 Magnet.
Forum March 2003H.Taureg1 Magnetic Fields in ALICE Mapping and Monitoring.
HPS Beamline: Background Rates, Sensitivity to Field Uncertainties M. Ungaro1HPS Collaboration Meeting, JLAB, May Concrete Wall thickness Study.
COBRA Magnet Status W. Ootani June 27th, 2006 MEG Review W. Ootani June 27th, 2006 MEG Review.
HPS T EST R UN C ONTINGENCY P LAN S. Stepanyan JLAB.
SR NSLS prototype magnets. Dipoles 90 mm aperture dipole Pole Ends will be matched to achieve the magnetic field quality ( )
Overview of the GlueX Tagger and Photon Beamline..
1 G9a -FROST. 2 Experiments FROST New generation of CLAS photoproduction experiments with FROzen Spin Polarized Target (FROST) E02-112: γp→KY (K + Λ,
The Stripping Foil Test Stand in the Linac4 Transfer Line
Transversity Readiness and Timeline Xiaodong Jiang, March 17th, This document specifies the overall readiness for Hall A experiments E06-010/E
Extraction Michael Bevins May 17, GeV Upgrade - Beam Transport Injection, Linac, Extraction, & Correctors Preliminary Design and Safety Review.
SBS Magnet and Support Status Robin Wines June 2013.
Low Energy RHIC e - Cooling Meeting Minutes – 12/23/ Cooling Section: –LF Solenoids:  At PPM, G. Woods has assigned buyer, SOW will be revised,
An electron/positron energy monitor based on synchrotron radiation. I.Meshkov, T. Mamedov, E. Syresin, An electron/positron energy monitor based on synchrotron.
Bubble Chamber Planning Meeting 07 August
Technical Readiness Review of the n-3He Experiment Seppo Penttila ORNL P-div At SNS Jan
PSB H- injection concept J.Borburgh, C.Bracco, C.Carli, B.Goddard, M.Hourican, B.Mikulec, W.Weterings,
G2P Installation Readiness. Fast raster & Calorimeter.
LINAC4 emittance measurements BI Day Divonne, 24 th November 11/24/2011 B.Cheymol, E. Bravin, D. Gerard, U. Raich, F. Roncarolo BE/BI 1.
SL_THOMSON C. Vaccarezza on behalf of the SL_Thomson team.
Linac4 BCC 14/10/2010 Linac4 Measurement and Dump Lines BCC on the Linac4 Transfer Line Status.
ELENA installation progress F. Butin / ELENA collaboration.
Report Technical Director Storage-Ring-Installation Completed
HMS Status Steven Lassiter Jan 20, 2017.
Expected hardware status and Priority of the commissioning task
DESY Test Beam Facilities - Status and Plan
Polarimetry Ken Livingston Sept 2012
G0 Backward Angle Accelerator Preparations
MDL0L02 Dipole and Environmental Fields
MDL0L02 Dipole Field Offset
Bubble Chamber Planning Meeting
Electron Beam Setup for Bubble Chamber
PEPPo Experiment Readiness Review
Status Report on E-166 Undulator-Based Production of Polarized Positrons K.T. McDonald Princeton University EPAC Meeting SLAC, November 15, 2003.
Bubble Chamber – Beam Requirements
Hall C – this week Time Period Plans 10/24-10/27 Target cool down
Hall C SHMS & Configuration Status
High Harmonic Analysis Using a COLTRIMS Technique
Hall C Dump Status Beam Resuscitation Review
Installation and Beam Test Schedule
Extraction Michael Bevins May 17, 2007
Hall C SHMS & Configuration Status
Isotope Readiness Review Run Plans
Presentation transcript:

Experiment beam line installation (9/4/2014) SystemThus FarTo Do Vacuum~ Torr, IP’s on, Vac interlock checkNone Fast valveValve + CCG installed, FV interlock checkNone New dipoleMeasured (<0.03%) + Field Map, Installed, and alignedUpdate control software Dipole Hall probeTesla meter + PC104/cables (com) installedMount probe, PC104 on network Transport magnets2 Quads/LCW + 4 Corrector pairs readyNone Position monitorsGoubau line tested, installed and elec. calibratedNone ViewersInstalledAir line/anti-collision Faraday cupInstalled, LCW, current monitoringAir line/anti-collission RadiatorInstalled, LCW, current monitoringLead hut, ME document thermal anal Photon lineCollimator/Dump installedNone AlignmentPre-alignFinal ~today

New spectrometer magnet NMR measurements 1 st pass (<0.03% midplane) 2 nd pass (<0.01% midplane) Hall probe Grid measurements Calibrated to NMR Stretched wire Signal too weak Alignment Fixture plate offset => X = -5mm, Z=1.2mm Dipole chamber roll => Y +0.1mm

Faraday Cup to Photon Dump Electron Radiator Final thickness = “ ME analysis suggests 1kW OK Shielding Pb staged for startup Coordinate alternative w/ RadCon Bremsstrahlung Measurement Detector group may have Ge detector Estimate photon flux

Summary New beam line should be ready for the Fall run Commissioning plan should be submitted Checklist of machine protection interlocks and controls Checkout of beam line with electron beam Beam Studies Momentum measurement Bremsstrahlung spectra Operation at high current