Fermilab Dr. O’Sheg Oshinowo IWAA2010 Conference DESY, Hamburg, Germany September 13-17, 2010 The NO A Experiment Gary Feldman Harvard University Survey.

Slides:



Advertisements
Similar presentations
TAUP 2007 R. Plunkett 14 September,2007 Status of the NOvA Experiment Robert Plunkett Fermi National Accelerator Laboratory Batavia, IL, USA TAUP 2007.
Advertisements

Expected Sensitivity of the NO A  Disappearance Analysis Kirk Bays (Caltech) for the NO A Collaboration April 14, 2013 APS DPF Denver Kirk Bays, APS DPF.
Survey(s) of TT8 10/12 TT 8 after wall1 16/12 TT 8 Standalone.
Gary Feldman P5 Meeting 21 February The NO A Experiment P5 Meeting SLAC 21 February 2008 Gary Feldman.
Off-axis Simulations Peter Litchfield, Minnesota  What has been simulated?  Will the experiment work?  Can we choose a technology based on simulations?
Leon Mualem — NNN07 The NO A Experiment Status Leon Mualem California Institute of Technology (for the NO A collaboration) Workshop on Next Generation.
How to Build a Neutrino Oscillations Detector - Why MINOS is like it is! Alfons Weber March 2005.
An accelerator beam of muon neutrinos is manufactured at the Fermi Laboratory in Illinois, USA. The neutrino beam spectrum is sampled by two detectors:
F Axis Off Axis Introduction Off-Axis Cambridge Meeting 12 January 2004 Gary Feldman.
Doug Michael Jan. 12, First goal is to be ready to select an optimal technology in ~one year. –Demonstrate that fundamental technologies are ready.
1 Institute of High Energy Physics 13/09/2010 Comparison and Study in Measurement Accuracy of Height Difference between Laser Tracker and Level Men LingLing.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
DELTA Quadrant Tuning Y. Levashov, E. Reese. 2 Tolerances for prototype quadrant tuning Magnet center deviations from a nominal center line < ± 50  m.
T2K experiment at J-PARC Epiphany 2010D. Kiełczewska1 For T2K Collaboration Danuta Kiełczewska Warsaw University & Sołtan Institute for Nuclear Studies.
The NOvA Experiment At Fermilab Mark Messier Indiana University 34th International Conference on High Energy Physics (ICHEP’08) Philadelphia, PA July 30,
Superconducting Cavities Development at Fermi National Accelerator Laboratory Dmitri Denisov DIET Federation Roundtable, Washington DC, April
NuMI NuMI Overview NBI 2002 S. Childress (FNAL) 14 March ‘02 NuMI / MINOS Overview.
NO A Experiment Jarek Nowak University of Minnesota For NOvA Collaboration.
Monitoring of FHEP Teacher Research Internship Fermilab – Summer 2011.
F Axis The NO A Experiment: Phase 2 of the Fermilab NuMI Program Workshop on Physics with Atmospheric Neutrinos and Neutrinos from Muon Storage Rings Maury.
Monte Carlo Comparison of RPCs and Liquid Scintillator R. Ray 5/14/04  RPCs with 1-dimensional readout (generated by RR) and liquid scintillator with.
Sarah Phan-Budd, TIPP Construction of PVC Extrusions for NO A Near and Far Detectors Sarah Phan-Budd Argonne National Lab On Behalf of the NO A.
Status of the NO ν A Near Detector Prototype Timothy Kutnink Iowa State University For the NOvA Collaboration.
Experimental Setup of the H8-RD22 Experiment Massimiliano Fiorini (on behalf of the H8-RD22 Collaboration) University of Ferrara – INFN Ferrara CARE HHH.
The NO A Experiment Status Leon Mualem California Institute of Technology (for the NO A collaboration) Fermilab Users’ Meeting 2009.
BEPCII Prealignment Installation Survey and Alignment Accelerator Center of IHEP Xiaolong Wang
Long Baseline Experiments at Fermilab Maury Goodman.
Status of the Alignment 17/12/04 Dario Autiero. Measurements taken so far: 13/9 TT8 On the mounting arch 12/11 TT7 Standalone in the target 19/11 TT7.
Fermilab Neutrino Program Jim Strait Neutrino Discussion at CERN 26 November 2013.
The NOvA Experiment Ji Liu On behalf of the NOvA collaboration College of William and Mary APS April Meeting April 1, 2012.
Performance Test of Laser Trackers of FARO Ryuhei Sugahara, Mika Masuzawa and Yasunobu Ohsawa KEK, High Energy Accelerator Research Organization Oho, Tsukuba,
Preliminary Results from the MINER A Experiment Deborah Harris Fermilab on behalf of the MINERvA Collaboration.
CLIC survey and alignment 1 CLIC CES meeting STARTSLIDE CLIC SURVEY AND ALIGNMENT Hélène MAINAUD DURAND.
Integrated Radiation Measurement and Radiation Protection of BES Ⅲ Zhang Qingjiang, Wu protection group, accelerator center, IHEP,
NuMI Off-Axis Experiment Alfons Weber University of Oxford & Rutherford Appleton Laboratory EPS2003, Aachen July 19, 2003.
Gary Feldman MINOS in Cambridge 24 March NO A Update MINOS Collaboration Meeting Cambridge, England 24 March 2009 Gary Feldman.
Technical Specifications for Monitoring Ground Displacements at a National Highway Project K. Lakakis, P. Savvaidis and I. Ifadis Laboratory of Geodesy.
International Workshop on Accelerator Alignment Jim Volk Valentin Ivanov Shavkat Signatulin Virgil Bocean Gary Coppola Rick Ford O’Sheg Oshinowo George.
Survey, Alignment and Metrology Fiducials Requirements Fabien Rey ESS Survey, Alignment and Metrology Group ACCELERATOR TECHNICAL BOARD 23/09/2015.
Survey, Alignment and Metrology Fabien Rey Pawel Garsztka ESS Survey, Alignment and Metrology Group.
Survey, Alignment and Metrology Fabien Rey Pawel Garsztka ESS Survey, Alignment and Metrology Group Interface Workshops for ESS Warm-Linac: ISrc - LEBT.
DUSEL BL WG 10 Nov 2008 Virgil Bocean 1 NuMI Geodesy and Alignment Lessons Learned Virgil Bocean DUSEL BL WG 10 Nov 2008.
E. W. Grashorn and A. Habig, UMD, for the MINOS Collaboration The Detectors of The Main Injector Neutrino Oscillation Search (MINOS) Experiment The MINOS.
Harvard Neutrino Group DoE Review August 21, 2006.
Mechanical Tests on Structure Mechanical Tests are being started using real extrusions. Purpose of the tests are to evaluate the accuracy and validity.
T2K Status Report. The Accelerator Complex a Beamline Performance 3 First T2K run completed January to June x protons accumulated.
NUMI NUMI/MINOS Status J. Musser for the MINOS Collatoration 2002 FNAL Users Meeting.
1) News on the long scale length calibration 2) Results of the two surveys performed on plane 7 Set 1: morning of 12/11/2004 Set 2: morning of 19/11/2004.
Status of the NOνA Experiment Satish Desai - University of Minnesota For the NOνA Collaboration APS Meeting - April 2013 Denver, Colorado.
Emulsion Test Beam first results Annarita Buonaura, Valeri Tioukov On behalf of Napoli emulsion group This activity was supported by AIDA2020.
The NOnA Experiment Survey of the NOvA Far Detector Gary Feldman
Company LOGO Technology and Application of Laser Tracker in Large Space Measurement Yang Fan, Li Guangyun, Fan Baixing IWAA2014 in Beijing, China Zhengzhou.
1 BROOKHAVEN SCIENCE ASSOCIATES 12th International Workshop on Accelerator Alignment September 10-14, 2012 Fermilab, Batavia, Illinois, U.S.A NSLS-II Girder.
Status of the NO A Experiment Kirk Bays (Caltech) on behalf of the NO A collaboration Lake Louise Winter Institute Saturday, Feb 22, 2014.
1 BROOKHAVEN SCIENCE ASSOCIATES 13th International Workshop on Accelerator Alignment October 13-17, 2014, IHEP, Beijing, China Smoothing Based on Best-fit.
 CC QE results from the NOvA prototype detector Jarek Nowak and Minerba Betancourt.
Survey for SPL Dominique Missiaen BE-ABP/SU. Outline 12/11/2008 Dominique Missiaen BE-ABP-SU, Survey for SPL 2  Scope & Main Parameters  Technical Description.
The NOνA data driven trigger Matthew Tamsett for the NOνA collaboration NOνA Neutrino 2014, XXVI International Conference on Neutrino Physics and Astrophysics.
The Alignment of DTL in CSNS Institute of High Energy Physics, CAS KE Zhiyong
Measuring Nuclear Effects with MINERnA APS April Meeting 2011 G. Arturo Fiorentini Centro Brasileiro de Pesquisas Físicas On behalf of the MINERnA collaboration.
NOnA NuMI Off-axis ne Appearance
EURONu Collaboration Board,
J. Musser for the MINOS Collatoration 2002 FNAL Users Meeting
Workshop on Tau-Charm at High Luminosity
PANDA Collaboration Meeting , BINP Sergey Pivovarov.
Chris Smith California Institute of Technology EPS Conference 2003
The Storage Ring Control Network of NSLS-II
Gary Feldman P5 Meeting 21 February
Fermilab Proton Beams: Program Perspectives Greg Bock Fermilab Science and Engineering at Henderson-DUSEL Capstone Workshop Stony Brook May 5,
Adjustment of the 3 reference tables at building 180 AT960 measurement
Presentation transcript:

Fermilab Dr. O’Sheg Oshinowo IWAA2010 Conference DESY, Hamburg, Germany September 13-17, 2010 The NO A Experiment Gary Feldman Harvard University Survey of the NOvA Near Detector at Fermilab Babatunde O’Sheg Oshinowo Horst Friedsam Fermi National Accelerator Laboratory Batavia, Illinois

Fermilab Dr. O’Sheg Oshinowo IWAA2010 Conference DESY, Hamburg, Germany September 13-17, 2010 The NOvA Experiment NOvA is a second-generation experiment on the NuMI beamline The NOvA project also includes accelerator upgrades to bring the NuMI beam intensity from 400 kW to 700 kW Main physics goal will be the study of   e oscillations Uses two detectors: Far Detector in Ash River, Minnesota Near Detector at Fermilab Run for 6 years NO A: NuMI Off-Axis e Appearance Experiment e = electron neutrino

Fermilab Dr. O’Sheg Oshinowo IWAA2010 Conference DESY, Hamburg, Germany September 13-17, 2010 This site is at 810 km from Fermilab, 12 km off-axis The Ash River site is the farthest available site from Fermilab in the U.S. along the NuMI beamline Far Detector Site

Fermilab Dr. O’Sheg Oshinowo IWAA2010 Conference DESY, Hamburg, Germany September 13-17, 2010 Near Detector Cavern The Near Detector will be placed underground on the Fermilab site 1 km off-axis, in a cavern adjacent to the MINOS access tunnel

Fermilab Dr. O’Sheg Oshinowo IWAA2010 Conference DESY, Hamburg, Germany September 13-17, 2010 What is NOvA? NOvA is: A 15 kTon Far Detector sited 13.6 mrad off the NuMI beam axis at a distance of 810 km at a distance of 12 km A 222 ton Near Detector identical to the far detector sited 13.6 mrad off the NuMI beam axis at a distance of 1 km An 84 Ton IPND ( Integration Prototype Near Detector ) identical to the Near Detector sited on the surface 107 mrad off the NuMI beam axis in the NOvA Near Detector Surface Building

Fermilab Dr. O’Sheg Oshinowo IWAA2010 Conference DESY, Hamburg, Germany September 13-17, 2010 NOvA Detector The NOvA detectors are constructed from planes of PVC modules The NOvA detector module forms the base unit for the detector Extrusions have a cellular structure, with 16 isolated cells per extrusion Each module is made from two 16 cell high reflectivity PVC extrusions bonded into a single 32 cell module L = 15.7 m for Far Detector L = 4.2 m for Near Detector Modules capped by a Manifold and an End Plate/Cap to contain the liquid scintillator Vertical plane = Two extrusion modules (64 cells wide) Horizontal plane three extrusion modules (96 cells high) PVC Extrusion PVC Module = Module Plane

Fermilab Dr. O’Sheg Oshinowo IWAA2010 Conference DESY, Hamburg, Germany September 13-17, 2010 NOvA Block The NOvA detector is constructed from alternating layers (planes) of vertical and horizontal PVC extrusion modules, connected together by glue between layers. The basic structural unit of the detector is a subassembly of 31 planes of PVC extrusion modules called a Block With an odd number of planes per block, there are two possible configurations: Vertical block (V) when the first and last planes are vertical modules V = v 0 h 1 v 2 h 3 v 4 h 5 v 6 h 7 v 8 h 9 v 10 ….. v 20 h 21 v 22 h 23 v 24 h 25 v 26 h 27 v 28 h 29 v 30 Horizontal block (H) when the first and last planes are horizontal modules H = h 0 v 1 h 2 v 3 h 4 v 5 h 6 v 7 h 8 v 9 h 10 ….. h 20 v 21 h 22 v 23 h 24 v 25 h 26 v 27 h 28 v 29 h 30 number of planes is counted from 0 through 30

Fermilab Dr. O’Sheg Oshinowo IWAA2010 Conference DESY, Hamburg, Germany September 13-17, 2010 The total number of planes in the far detector is 1003 (505 vertical, 498 horizontal), 32 blocks with 31 planes each and 1 block with 11 planes. Twelve (12) extrusion modules get placed side by side on a flat assembly table to form one plane of the far detector The Far Detector (FD) consists of 33 blocks 20 “V” and 13 “H" blocks: FD  V 0 H 1 V 2 H 3 V 4 V 5 ……..V 25 H 26 V 27 H 28 V 29 V 30 H 31 V 32 where the number of blocks is counted from 0 through 32. O’Sheg Far Detector

Fermilab Dr. O’Sheg Oshinowo IWAA2010 Conference DESY, Hamburg, Germany September 13-17, 2010 Integration Prototype Near Detector (IPND) 4 blocks = IPND Constructing prototype detector to run on the surface near NOvA Near Detector Surface Building The IPND consists of 4 Blocks: IPND  V 0 H 1 V 2 H 3 where the number of blocks is counted from 0 through m wide 4.2 m tall 8.4 m long

Fermilab Dr. O’Sheg Oshinowo IWAA2010 Conference DESY, Hamburg, Germany September 13-17, 2010 NOvA Near Detector The Near Detector (ND) consists of 6 Blocks: ND  V 0 H 1 V 2 H 3 V 4 V 5 where the number of blocks is counted from 0 through m wide 4.2 m tall 14.3 m long

Fermilab Dr. O’Sheg Oshinowo IWAA2010 Conference DESY, Hamburg, Germany September 13-17, 2010 Survey of NOvA Near Detector Establish a precision horizontal and vertical control network for positioning the Near Detector in the Local Tunnel Coordinate System (LTCS) The network consists of both horizontal and vertical networks using several wall monuments and pass points in the NOvA Near Detector Surface Building (NDSB) Tie the new NDSB horizontal and vertical network was tied to the existing surface network used for the NuMI project Magnet Rings used as Fiducials Fiducials are glued with 24-Hour Epoxy Magnet Ring (19 mm OD, 12 mm ID and 10 mm thick N40 super magnet)

Fermilab Dr. O’Sheg Oshinowo IWAA2010 Conference DESY, Hamburg, Germany September 13-17, 2010 Survey Methodology  All Survey for the near detector was done with: An API Tracker3 Laser Tracker and Spatial Analyzer TM - 3-D Accuracy : Accuracy of a Coordinate: ± 5 μm/m - Interferometer: Accuracy of IFM: 1 μm/m - ADM: Accuracy ±15 μm or 1.5 μm/m (whichever is greater) Leica HDS6100 Laser Scanner system and its associated software - Full 360° x 310° field-of-view and extended range of up to 79 m. - Accuracy of single measurement is: Position 5 mm 1 m to 25 m range; 9 mm to 50 m range  Overall Survey Tolerance: Relative 2 mm (Horizontal) edge to edge; Relative 0.75 mm or better (Vertical) between adjacent pieces Angular tolerance of ± 2 mm/15.7 m = ± 0.13 mrad

Fermilab Dr. O’Sheg Oshinowo IWAA2010 Conference DESY, Hamburg, Germany September 13-17, 2010 Block Fiducialization Total of 24 fiducials are used for each block, 18 on the model extrusions and 6 on the blue steel base plate. There 9 fiducials on the extrusions at about the first, middle and last planes and 3 on the base plate on the east side of the block The same number of fiducials is on the west side. Magnet Rings used as Fiducials

Fermilab Dr. O’Sheg Oshinowo IWAA2010 Conference DESY, Hamburg, Germany September 13-17, 2010 Block Referencing The fiducialized blocks were referenced using the Laser Tracker in a local magnet coordinate system the in MINOS Service Building prior to installation in the NOvA Near Detector Surface Building Blocks with Fiducials were Referenced in two parts: - Reference Part 1: Block in Prone Position - Reference Part 2: Block in Upright Position

Fermilab Dr. O’Sheg Oshinowo IWAA2010 Conference DESY, Hamburg, Germany September 13-17, 2010 Part 1: Block in Prone Position Measured the local control points in the MINOS Service Building Measured all 24 Block fiducials Groove measurements on Block were made at specified locations by placing the SMR where the horizontal module grooves intersect the extreme end of the vertical plane The bottom of the SMR sat in the horizontal groove while the one side of the SMR touched the vertical plane

Fermilab Dr. O’Sheg Oshinowo IWAA2010 Conference DESY, Hamburg, Germany September 13-17, 2010 Part 2: Block in Upright Position Measured the local control points in the MINOS Service Building Measured all 24 Block fiducials Performed best-fit transformations to transform all the Prone Position measurements into the Upright Position measurements. Measured the upstream and downstream surfaces of the Block. This was done with 8 scans along the edges of each module. Computed plane fit for each surface and the vector differences to the corresponding measurements Reported vectors graphically.

Fermilab Dr. O’Sheg Oshinowo IWAA2010 Conference DESY, Hamburg, Germany September 13-17, 2010  Referencing Methods used Plane Fits Plane-Plane Intersections 3-Plane Intersections Line Fits Line-Line Intersections Block Corner Positions  Block is defined by the 8 Corners computed from plane fits to all measurements

Fermilab Dr. O’Sheg Oshinowo IWAA2010 Conference DESY, Hamburg, Germany September 13-17, 2010 Block Data Reporting Graphical Output of Roll, Pitch, Yaw Offsets dX, dY, dZ Able to easily identify the missing groove measurements and/or outliers due to too much glue Perform best-fit transformations to transform all the Ideal position locations [x I, y I, z I ] generated for each module into the Measurement coordinate system [x M, y M, z M ]

Fermilab Dr. O’Sheg Oshinowo IWAA2010 Conference DESY, Hamburg, Germany September 13-17, 2010 IPND Assembly Blocks are moved into the NOvA Near Detector Building for assembly 5 out of 6 Blocks have been assembled Five Blocks Assembled in NOvA Building

Fermilab Dr. O’Sheg Oshinowo IWAA2010 Conference DESY, Hamburg, Germany September 13-17, 2010 Challenges Excessive Glue in the Grooves Residual Black Paint in the Groove and on the Vertical Module RTV Silicone Adhesive on the Vertical Module

Fermilab Dr. O’Sheg Oshinowo IWAA2010 Conference DESY, Hamburg, Germany September 13-17, 2010 Status NOvA Near Detector IPND installation is completed. No Liquid Scincillator fill yet. 6 th Block to be referenced and installed by beginning of October, 2010 Muon Catcher to be referenced and installed by mid-October, 2010 Survey of the 6 Blocks and Muon Catcher in the NOvA Near Detector Building by end of October, th detector block ready to take data (IPND) by beginning of November, 2010 Near detector ready to take data by mid-November, 2010 Survey of the 6 Blocks in the MINOS Tunnel by Fall of 2011 Five Blocks Assembled in NOvA Building

Fermilab Dr. O’Sheg Oshinowo IWAA2010 Conference DESY, Hamburg, Germany September 13-17, 2010 Conclusions The survey methodology used has been presented The NOvA Near Detector survey is in progress

Fermilab Dr. O’Sheg Oshinowo IWAA2010 Conference DESY, Hamburg, Germany September 13-17, 2010  I would like to thank Alignment and Metrology Group members who participated in the NOvA Near Detector project, especially Gary Crutcher who did a lot of the data processing Dr. Pat Lukens and Dr. Ting Miao - NOvA Collaboration Acknowledgment Danke Frage?