FIMS Data Validation Improvements And Lessons Learned Phil Dalby, PE, LEED AP, CFM Office of Acquisition and Project Management Property Management Virtual.

Slides:



Advertisements
Similar presentations
STATE OF OUR FACILITIES REPORT bellwether of the asset management plan evolution of the three year rolling timeline Ivan Graff Office of Acquisition and.
Advertisements

Space Bank & Freeze the Footprint May 22, 2013 Phil Dalby, PE, LEED AP, CFM Office of Acquisition and Project Management Property Management Virtual Workshop.
Ivan Graff Office of Acquisition and Project Management Oak Ridge, TN March 27, 2014 Applying the Memorandum on Data Related to Operations and Maintenance.
Program Name or Ancillary Texteere.energy.gov June 16, 2011 Soudeh Motamedi IBM Contractor, DOE Sustainability Performance Office Year-End Sustainability.
Office of Management, Office of Engineering and Construction Management DATA ELEMENT UPDATE Gary R. Horn Facilities Engineer, LEED AP Office of Engineering.
Eric Hardy | June 2014 U.S. Department of Education Software Vendors Webinar NSLDS Update for Software Vendors.
June 16, 2011FIMS / Real Estate Workshop nd Annual FIMS / Real Estate Workshop.
Bridges & Culverts Usage Codes and Validation Annual FIMS Comprehensive Training March 27, 2014.
FIMS/Real Estate Workshop June 16, 2011 The IFI Crosscut and You How FIMS Data Supports the Budget Process Cindy Hunt, PE, LEED AP, CCE, CFM Office of.
Legislative Branch Update: Current Audits and Legislation of Interest Ivan Graff, P.E., CFM, PMP, CCE, LEED AP.
1 FIMS Data Validation Improvements And Lessons Learned Phil Dalby, PE, LEED AP Office of Engineering and Construction Management Facilities and Infrastructure.
UNDERSTANDING, PLANNING AND PREPARING FOR THE SCHOOL-WIDE EVALUATION TOOL (SET)
Trini Torres-Carrion. AGENDA Overview of ED 524B Resources Q&A.
How to use the Certified Annual Report (CAR) – Chart of Account (COA) test site and actual site.
Seafood HACCP Alliance for Training and Education Chapter 10 Principle 6: Establish Verification Procedures.
Office of Acquisition and Property Management Completing an Effective Project Data Sheet (PDS)
B-4-C-1 ACI contractor begins prepping generators Power AO and BLT makes contact w/State if landfall state is known LTM needs to activate GPS units if.
Facilities Information Management System Data Validation Update for FY15 U.S. Department of Energy Argonne National Laboratory Annual FIMS Comprehensive.
1 Facilities Information Management System FIMS Location Addresses and Geographic Location Codes 2009 FIMS/Real Estate Workshop Memphis, TN June 4, 2009.
1 FIMS Population Queries FIMS/Real Estate Workshop Memphis, TN June 3, 2009 Gayle Smith Mike Kohut Energy Enterprise Solutions.
ANNUAL FIMS COMPREHENSIVE TRAINING Y- 12 NEW HOPE CENTER OAK RIDGE, TN MARCH 25, 2014 GAYLE SMITH Accomplishing FRPP Reporting and Improving Data Quality.
How to Use the New FIMS AAIM Module Annual FIMS Comprehensive Training Y-12 New Hope Center Oak Ridge, TN March 25, 2014 Mark Gordy Gayle Smith.
Conducting Waste Assessments North Carolina WasteWise Program Hands-On Training May 17, 2000 Department of Correction Raleigh, NC.
National Laboratory Operations Board Infrastructure Assessment Subgroup Real Property Background Carmelo Melendez.
Facilities Information Management System (FIMS) Data Validation Inbrief program Facilities site name date.
Facilities Information Management System (FIMS) Data Validation Outbrief [Program] [Site] date.
Office of Management Office of Engineering and Construction Management 6/2/2009 Beyond the President’s Management Agenda & FRPC Update Gary R. Horn Facilities.
2014 FIMS Annual Training Oak Ridge, TN March , 2014 Presented by: Michael Kohut, DOE Headquarters (GCI)
Planning for FY08: Managing the Transition of the LM Organization December 2004.
DOE ASSET MANAGEMENT PLAN
Office of Science (SC) Overview John Yates Office of Operations Program Management, SC-33 Office of Science Briefing for DOE FIMS Training at ANL – May.
Proposed FIMS Data Elements for Removal FIMS/Real Estate Workshop Palm Springs, CA June 2-6, 2008 Mark Gordy Energy Enterprise Solutions.
1 FIMS Lease Management and More 2009 FIMS/Real Estate Workshop Memphis, TN June 3, 2009 Prepared by: Gayle Smith, Energy Enterprise Solutions.
FRPP Data Issues FIMS/Real Estate Workshop Palm Springs, CA June 2-6, 2008 Mark Gordy & Gayle Smith Energy Enterprise Solutions.
Annual FIMS Comprehensive Training Argonne National Laboratory May 6, 2015.
Office of Management Office of Engineering and Construction Management 6/2/2008 President’s Management Agenda & FRPC Update Gary R. Horn Facilities Engineer.
STATE OF OUR FACILITIES REPORT bellwether of the asset management plan evolution of the three year rolling timeline Ivan Graff Office of Asset Management.
1 Department of Energy Excess Screening and Disposition Tracking Phil Dalby, PE, LEED AP Office of Engineering and Construction Management Facilities and.
FIMS/Real Estate Workshop Palm Springs, CA June 2-6, 2008 DOE Oak Ridge Office Rebecca Whitehead.
1 FIMS Data Validation Improvements And Lessons Learned Phil Dalby, PE, LEED AP Office of Engineering and Construction Management Facilities and Infrastructure.
1 FIMS Data Validations And Lessons Learned Phil Dalby, P.E. Office of Engineering and Construction Management Facilities and Infrastructure Team FIMS.
ANNUAL FIMS COMPREHENSIVE TRAINING ARGONNE NATIONAL LABORATORY MAY 6, 2015 GAYLE SMITH Federal Real Property Profile Reporting.
1 Department of Energy Excess Screening and Disposition Tracking Phil Dalby, P.E. Office of Engineering and Construction Management Facilities and Infrastructure.
1 DOE Excess Elimination an Dispositions Phil Dalby, PE, LEED AP, CFM Office of Acquisition and Project Management Property Management Virtual Workshop.
National Strategy for the Efficient Use of Real Property Fiscal Years I VAN G RAFF Lemont, IL May 6, 2015.
Replacement Plant Value (RPV) Dollars in Billions.
Lease Acquisition FIMS / Real Estate Workshop Tom Geronikos, Senior Realty Officer, OECM Office of Management June 5, 2008.
Mark Gordy, PMP Energy Enterprise Solutions, LLC 2013 Property Management Workshop May 22, 2013.
R ICHLAND O PERATIONS O FFICE Hanford Site 2008 FIMS/Real Estate Workshop.
NNSA Service Center Albuquerque, NM Field Office Status Report June 2008.
GAO and Inspector General Reports: A Review of Recent Audits Ivan Graff, P.E., CFM, PMP, CCP, LEED AP.
Presentation for: 2011 FIMS/Real Estate Workshop Prepared by: Gayle Smith, DOE Headquarters (EES) Facilities Information Management System FY11 Year-End.
Presentation for: 2009 FIMS/Real Estate Workshop Prepared by: Mark Gordy, Headquarters (EES) Facilities Information Management System Data Quality and.
Mark Gordy Annual FIMS Comprehensive Training Argonne National Laboratory May 6, 2015.
DEPARTMENT OF ENERGY PROPERTY MANAGEMENT WORKSHOP DAVID STEINAU CINDY HUNT MAY 22, 2013 Exhibit 54: What Are You?
Freeze the Footprint Update March 25, 2014 Presented for Monja Vadnais Facilities & Infrastructure Division (MA-652) Office of Acquisition and Project.
1 Chicago Office. 2 FACILITIES INFORMATION MANAGEMENT SYSTEM (FIMS) & REAL ESTATE WORKSHOP FIMS POPULATION QUERY DEMONSTRATION June 2 – 6, 2008 Palm Springs,
Managing Quality with Quality Through the Construction Management Leadership Manual Presented by: Aleksandr Sergek, PE, PMP Allison Justiniano, LEED AP.
May 7, 2015FIMS / Real Estate Training 2015 FIMS / Real Estate Training FY 2015.
Presentation for: 2009 FIMS/Real Estate Workshop Prepared by: Gayle Smith, Headquarters (EES) Facilities Information Management System Upcoming FIMS Enhancements.
FIMS Data Quality FIMS Annual Training May 10-12, 2016 Prepared by: Mark Gordy and Gayle Smith.
FIMS FY16 Year-End Schedule FIMS Annual Training May 10-12, 2016 PREPARED BY: GAYLE SMITH.
1 of 32 Performance Measures and the State of Our Facilities Eric Haukdal MA-50 Office of Asset Management.
1 The Department of Energy And Electronics Stewardship : How DOE Attained “Green Status” on the OMB Environmental Scorecard Federal Environmental Symposium.
Prepared by: Adam Pugh May 10-12, 2016 FIMS/RE Annual Training.
New Ownership Type Options: Implementing Request for Change FIMS Annual Comprehensive Training May 11, 2016.
FIMS Data Validation Update for FY16 FIMS Annual Comprehensive Training May 10 – 12, 2016 Presented by: Gayle Smith.
FY19 Federal Grant Monitoring: Titles I, II, IV
Federal Real Property Asset Management Initiative
Government Owned Property
Presentation transcript:

FIMS Data Validation Improvements And Lessons Learned Phil Dalby, PE, LEED AP, CFM Office of Acquisition and Project Management Property Management Virtual Workshop May 22, 2013

Agenda FIMS Validations Status of FY 2013 Validations Validation Trends QA Reviews FY 2013 Validation Plan Best Practices Lessons learned Questions

3 FIMS Reliance on FIMS is increasing – Good News – Current user community consists of almost 500 people – The user base has increased by 40% over the last 5 years – We have seen an increased level of interest in FIMS training by management and facilities personnel in the field OMB's and GSA’s focus has shifted from data completeness to data quality/accuracy – This makes our data validation process all the more important – We have seen significant improvement – Still plenty of room for improvement OMB considers our validation Process a best practice GAO encouraged continued use of the FIMS validation process Call the hotline!!

Importance of FIMS Validations FIMS is the Department’s repository of real property information –Legal/regulatory requirement Annual Submission to the FRPP – Required by 41 CFR § – 41 CFR § requires agencies to verify the accuracy of each FRPP submission 20,000 records with upwards of 175 data elements per record –Used in decision-making throughout the Department –Populates the Federal Real Property Profile –Supplemental data for financial reporting –Avoids unnecessary data calls and site-level queries

FY 2013 FIMS Validation Status 50 Sites to be validated 22 Validated to date – 16 Green – 1 Yellow – 5 Red LPSO is lead on multi-program sites – One scorecard per site Go’in for Green!

Validation Trends

Quality Assurance Reviews ~ Eight per year Try to get to each site every 4 to5 years Share and capture best practices Ensure validations are consistent Department- wide OPAM/HQ Program Office do not run validation – Observe process – Provide assistance – Answer questions We’re from Washington and we're here to help! FIMS

FY2013 FIMS Validation Plan FY2013 Three validations will be performed – One validation will include a random sample of DOE owned buildings, trailers, and Other Structures and Facilities (OSF) – The second validation will include all DOE leased buildings, trailers and Other Structures and Facilities (OSF) – The third validation will include DOE owned, DOE ingrant – DOE leased and withdrawn from public domain land – Contractor leased assets will not be validated – Bridge Safety Inspections will be verified

FIMS Validation Process Planning the Validation Lesson 3 Inbrief Lesson 4 Determine Sample Size Lesson 5 Generate Random Sample Lesson 6 Review Outliers and Generate Outlier Report Lesson 6 Generate DOE Leased Report Lesson 6 Generate Land Report Lesson 6 Generate Bridge Safety Inspection Report Lesson 6 Populate Data Validation Forms Lesson 7 Identify Assets for Physical Walkthroughs Lesson 7 Data Element Review Lesson 8 Source Documents Lesson 9 Desktop Validation Lesson 10 Conduct Walkthroughs Lesson 11 Prepare Scorecards Lesson 12 Prepare Outbrief & Follow-up Actions Lesson 13

Best Practices Complete source documentation worksheet – Streamlines process – Provides contact information of source data owner (SDO) Develop source documentation notebook – Tab for each data element – Signed Memo, dated, clarifying process for obtaining source data by SDO – Be prepared to go into detail on how you arrived at the values for the source data Develop local data base for source data Review entire process prior to validation FIMS

Lessons Learned/Reminders DM inspection no longer than at 5 years apart – Check inspection dates before validation Source data required to be updated annually

Source documentation development – Develop a table for Source Data Owner (SDO) SDO provides data or SDO reviews, makes corrections and certifies existing data – Signs and dates table certifying data is accurate – One SDO per table – Certified by one SDO – SDO must personally review and certify data as correct This procedure can not be used for the following data elements RPVNet Square FeetAnnual Actual Maintenance DMUtilizationAnnual Operating Costs Size (Gross Sqft, Primary Qty, Secondary Qty) Lessons Learned/Reminders

FIMS generated RPVs – Use FIMS User Guide Appendix F to crosswalk Usage Code and RPV model Update process memos if process changes Estimated disposition year for excessed assets – If Site does not have a planned date for disposition Use 9999 Update annually Conduct walkthrough for 25 to 30% of sample Drive by as many of the remaining assets in the sample set as practical Lessons Learned/Reminders

The Facilities Walkthrough During Walkthrough: – Verify Usage code Status Utilization – Do a “sanity check” on deferred maintenance – Verify that multiple buildings and/or trailers assets are not being reported as one single record in FIMS

Rating of Status Chart FIMS Scorecard Status Score Performance Measures * Remainder of Validated Elements Notes Green All performance measures green and… All other elements at-least yellow Preferred level of data quality Yellow Any one performance measure yellow or… No more than one of the remaining elements red Minimal acceptable level of data quality Red Any one performance measure red or… More than one of the remaining elements red Unacceptable data quality *FRPC Performance Measures: Replacement Plant Value, Deferred Maintenance, Utilization, Annual Operating Costs and Annual Actual Maintenance

Corrective Action Plan (CAP) Sample available on FIMS website at Usually just the scorecard with a few additional columns to identify: – Corrective action plan completed within 30 days of validation – Point of contact – Estimated date of completion

Questions? Phil Dalby PE, LEED AP Department of Energy Office of Acquisition and Project Management (APM) - MA-652 Phone: (202) Cell: (202) Fax: (202)