Copyright 2007 Northrop Grumman Corporation 1 Large Deployed and Assembled Space Telescopes November 14, 2007 Ronald S Polidan Chief Architect, Civil Systems.

Slides:



Advertisements
Similar presentations
Extra Large Telescope Wind Engineering. Wind and Large Optical Telescopes Wind is a key factor in the design of large telescopes: larger wind-induced.
Advertisements

Astrophysics /07 Technology Responsivity and Risk Mitigation Optimizing the Programmatic S/N Of Future Large Space Telescopes Dan Lester University.
Laser Interferometer Gravitational-wave Detectors: Advancing toward a Global Network Stan Whitcomb LIGO/Caltech ICGC, Goa, 18 December 2011 LIGO-G v1.
1 Ritva Keski-Kuha JWST Deputy OTE Manager May 19, 2009 JWST OTE Development Status JWST-PRES
CMSC 2006 Orlando Active Alignment System for the LSST William J. Gressler LSST Project National Optical Astronomy Observatory (NOAO) Scott Sandwith New.
Status of the James Webb Space Telescope (JWST) Optical Telescope Element (OTE) Northrop Grumman: Charlie Atkinson, Scott C. Texter NASA/GSFC: Lee Feinberg,
International Planetary Probe Workshop 10
1 Astronomical Observational Techniques and Instrumentation RIT Course Number Professor Don Figer Telescopes.
Aug.19, 1999 George T. Roach Integration Mission Design Center NASA- GSFC Code 543 Greenbelt, MD FAX
07/07/2005 Coupling with PF2012: No existing PF “as is” able to accommodate Karin On going study in France to develop a new generation of PF product line.
Attitude Determination and Control
All these Sky Pixels Are Yours The evolution of telescopes and CCD Arrays: The Coming Data Nightmare.
Astronaut-Aided Construction of a Large Lunar Telescope Background Concepts for large astronomical facilities to follow the Next Generation Space Telescope.
All these Sky Pixels Are Yours The evolution of telescopes and CCD Arrays: The Coming Data Nightmare.
Telescope Design The W.M. Keck (I & II) Telescopes Jana Hunt & Kent Van ME250 Precision Machine Design April 8, 2003.
Constellation Orion Visible Light Constellation Orion Infrared Light.
Stacked-Die Chip Scale Packages Adeel Baig. Microsystems Packaging Objectives Define Stacked-Die Chip Scale Packages (S- CSP) Explain the need for S-CSP.
Technical Performance Measures Module Space Systems Engineering, version 1.0 SOURCE INFORMATION: The material contained in this lecture was developed.
Some large-telescope design parameter considerations: Distributed pupil telescopes J.R.Kuhn Institute for Astronomy, UH How to “distribute the glass” in.
The James Webb Space Telescope. Introduction The James Webb Space Telescope  The James Webb Space Telescope, also called Webb or JWST, is a large, space-based.
A student project. What is a space telescope?  A space telescope is a telescope that orbits around Earth in space.  Like other telescopes they take.
4-meter Space Telescope Design Concepts for a UVOIR / ExoPlanet Mission Dr. Charles F. Lillie January 8, 2012 COPAG Community Meeting.
Space Frame Structures for SNAP Bruce C. Bigelow University of Michigan Department of Physics 11/04/04.
1 Engineering the James Webb Space Telescope Paul Geithner JWST Deputy Project Manager - Technical March 26, 2011.
Student Satellite Project University of Arizona Team Goals Design, Fabricate, and Analyze a Structure that will Support the Payload –Space Allocation of.
Determinate Space Frame Telescope Structures for SNAP Bruce C. Bigelow University of Michigan Department of Physics 7/28/04.
Optical Design of Giant Telescopes for Space Jim Burge, Erin Sabatke Optical Sciences Center Roger Angel, Neville Woolf Steward Observatory University.
Telescope Technologies
Lightweight Deployable UV/Visible/IR Telescopes Frank Peri, Jr. Earth Science Technology Office NASA Goddard Space Flight Center Michael Hagopian Earth.
Structures and Mechanisms Subsystems AERSP 401A. Introduction to Structural Estimation Primary Structure: load-bearing structure of the spacecraft Secondary.
IFE Plant Structural Concepts Including Shielding and Optical Stability Requirements Thomas Kozub, Charles Gentile, Irving Zatz - PPPL.
Modern Universe Space Telescope Visions 2003 Proposal Dennis Ebbets Ball Aerospace UV Optical Space Telescope Workshop STScI February 26, 2004.
AAAC Presentation JWST Status Eric P. Smith JWST Program Scientist.
K-D-PR Fabrication and testing of KGMT FSM prototype Oct Ho-Soon Yang, Hak-Yong Kihm, Il-Kwon Moon, Jae-Bong Song, Yun-Woo Lee Korea.
Progress Report Geo-CAPE Coastal Ecosystem Dynamics Imager (CEDI) IRAD Repackaging Study Jason Budinoff / GSFC Cathy Marx / GSFC May 12, 2011.
5.1 Optical Observatories 5.1 a: Observatory Sites: One limitation: the time needed for optics to reach equilibrium shape when exposed to severe temperatures.
SKA Dishes, CSIRO February 2013 SKA Dish Verification Antenna #1 Gary Hovey Astronomy Technology Program – Penticton 12 February 2013.
RASC-AL 2010 Topics. TECHNOLOGY-ENABLED HUMAN MARS MISSION NASA is interested in eventual human mission to the Martian surface. Current Mars design reference.
MAXIM Periscope ISAL Study Highlights ISAL Study beginning 14 April 2003.
1 Development of Light Weight Replicated Integral Optics: An Innovative Approach Suzanne Romaine (SAO) R. Bruni, P. Gorenstein, R. Rosati (SAO) B. Ramsey.
THE CRAO'S CONTRIBUTION FOR THE WSO / UV PROJECT N.V.STESHENKO.
CLAS12-RICH Mechanical Design Status-Report CLAS12 RICH Review September 5-6 th 2013 S. Tomassini, D. Orecchini1 D. Orecchini, S. Tomassini.
1 JWST Functional Flow Diagrams and Schematic Block Diagrams.
FELT 1 Study of the capability and configuration of a fixed mirror Extremely Large Telescope (FELT) Low cost path to large telescope Primary concern is.
ATLAST-9.2: A Deployable Large Aperture UVOIR Space Telescope W. Oegerle 1, L. Feinberg 1, L. Purves 1, T. Hyde 1, H. Thronson 1, J. Townsend 1, M. Postman.
WFIRST DRM2 candidate design – payload summary At SDT7 3/1-2/2012 consensus for concepts w/out overlap w/ other mission, aka “DRM2” was: 1.1m aperture,
Large Dynamic Range Co- Phasing System Development for Segmented Telescope Mirrors Juan F Simar – ARC Phd Student Centre Spatial de Liège Université de.
1 System Architecture Mark Herring (Stephen Merkowitz Presenting)
Extended Detector Cutoff Considerations WFIRST Project Office May
JWST Mission CDR Northrop Grumman Space Systems Redondo Beach (CA) April 10-16, 2010.
Deploying JWST Bob Giampaoli JWST Chief Systems Engineer Northrop Grumman.
Lightweight mirror technology using a thin facesheet with active rigid support J. H. Burge, J. R. P. Angel, B. Cuerden, H. Martin, S. Miller University.
P. Friedrich, H. Bräuninger Extrapolation of the electroforming replication technique as it has been successfully applied to the XMM-Newton mirror systems.
Wes Ousley June 28, 2001 SuperNova/ Acceleration Probe (SNAP) Thermal.
1 Astronomical Observational Techniques and Instrumentation Professor Don Figer Telescopes.
V - 1 V. System Technology for Large Space Telescopes Session Chair: Juan A. Roman.
Micro Arcsecond X-ray Imaging Mission Pathfinder (MAXIM-PF) Mechanical George Roach Dave Peters 17 May 2002 “Technological progress is like an axe in the.
Ares V an Enabling Capability for Future Space Science Missions H. Philip Stahl, Ph.D. NASA MSFC.
 From SmallSat to CubeSat: Reducing Mass Size and Cost Jeremy Straub 1, Ronald Fevig 2, Todd Borzych 2, Chris Church 2, Curt Holmer 2, Martin Hynes 2,
Date of download: 5/29/2016 Copyright © 2016 SPIE. All rights reserved. Drawing of the Space Infrared Telescope for Cosmology and Astrophysics (SPICA)
The Space Telescope and The Lagrangian Point.  Launch Scheduled for 2018 by European Space Agency  18 Segment Primary Mirror (Gold-plated Beryllium;
Date of download: 7/6/2016 Copyright © 2016 SPIE. All rights reserved. Image model for flux pinning. In this model, flux pinning is described as the interaction.
The GMT Project The Giant Magellan Telescope (GMT)
Primary Mirror (Reflector)
Corrugated Mirror and Rapid Panel Manufacturing
Capitalization style for Presentation Title is “Title Case”
Feasibilty/Concept Study Mid Term Status Review
James Webb Space Telescope
Optics Alan Title, HMI-LMSAL Lead,
CHEOPS - CHaracterizing ExOPlanet Satellite
Presentation transcript:

Copyright 2007 Northrop Grumman Corporation 1 Large Deployed and Assembled Space Telescopes November 14, 2007 Ronald S Polidan Chief Architect, Civil Systems Division Charles F Lillie, Gary Segal, Dean Dailey Northrop Grumman Space Technology

Copyright 2007 Northrop Grumman Corporation 2 Agenda  Expectations  Deployable Observatories  Very Large Observatories  Technology Needs

Copyright 2007 Northrop Grumman Corporation 3 Astrophysics Beyond 2020 – Expectations  JWST will have launched in 2013, fulfilled its 5 year prime mission and be on its way to its 10-year lifetime goal  New “infrastructure” elements and technologies are changing the architectural approaches to big space telescopes  Bigger launch vehicles: EELV Heavy and Ares V  Advanced optics technology (ultra-light weight mirrors, replication, improved wavefront sensing and control technologies, …)  Advanced deployment and assembly (robotic or crewed) technologies  Linearly extrapolating from the past:  Hubble (1990): 2.4 m aperture, 11,110 kg total mass, $4.1 B (FY06, A-D)  JWST (2013): 6.5 m aperture, 6,200 kg total mass, $3.5 B (FY06, A-D)  For a similar cost we should expect to produce a ~20 m telescope, launching in the mid-2020s  Assuming anything faster than linear technology development produces 25 meter or larger filled aperture telescopes 20-m or Larger Filled Aperture Telescopes Should be Expected in the 2020’s

Copyright 2007 Northrop Grumman Corporation 4 Current State of the Art: JWST Momentum Trim Flap Fixed Fwd and Aft Spreader Bars Aft UPS Bipod Launch Lock Attachment Points Unitized Pallet Structures (UPS) Telescopic Side Booms Fixed Side Spreader Bars Note: S/C Solar Array and Radiator Shades Shown in Stowed Positions for Clarity Momentum Trim Flap Fixed Width Aft Membrane Core Area Tower Ext. SMSS Deployment PM Deployment Secondary Deployment SunshieldSolar ArraysHGA Cool Down

Copyright 2007 Northrop Grumman Corporation 5 Simplest Approach: Scaling Up JWST  Scaling up JWST to large EELV and Ares V launch vehicles  Lowest cost option: a JWST “rebuild” with no new technology development  Use identical cord fold deployment & sunshield architecture and technology  The bottom line for several reasons but mostly having to do with vertical height in the faring (a high center of gravity, load paths and acoustic loads are additional complications) limits you to  ~ 8 meter aperture for the largest EELV  ~ 12 meter aperture for an Ares V  For truly large telescopes, we need something more advanced than a cord fold approach

Copyright 2007 Northrop Grumman Corporation 6 Shift to a Family of Deployment Options Recent analysis driven by the proliferation of diverse missions requiring both large and smaller telescopes have shown that the choice of deployment approach will depend on: Manufacturing, Launch & Deployment Risk and Cost Monolith Primary Mirror Diameter (m) Relative Risk & Cost vs Primary Diameter Hubble Spitzer Stacked Hex Fan- Fold Chord-Fold JWST Size of the primary mirror required for the mission Launch constraints –Total mass –Launch environment Required telescope agility –Fixed targets or –Imaging while tracking Applicable and available mirror technology –Need smaller, stiffer segments –Availability of larger, ultra-light segments Acceptable cost and risk

Copyright 2007 Northrop Grumman Corporation 7 Telescope Deployment Architecture Approach Should be Optimized for Cost and Mission Needs 2m - 18 Segment PM, 2m Fairing2m - 7 Segment PM, 2m Fairing3m - 7 Segment PM, 3m Fairing 3m - 10 Segment PM, 2m Fairing4m - 10 Segment PM, 2m Fairing3m - 7 Segment PM, 2m fairing Depending on manufacturability of segments Depending on segment size & Mission Rqmts Scalable to Very Large Diameters Chord-Fold Deployment Fan-Fold DeploymentRobotic Deployment

Copyright 2007 Northrop Grumman Corporation 8 Scaling to Very Large Apertures One of our long term goals has been the development of an efficient deployment approach that would scale to very large telescopes SAFIR (10m) 2m Segments 6m Primary 3m Segments 8.5m Primary 3.5m Segments 10.5m Primary 1m Segments 3m SMD Primary Scaling in Segment Size 2m Segments 10m Primary 3.5m Segments 24.5m Primary Scaling in Number of RingsHybrid Mirror 6m UV/Vis/IRSMD (3m) ● ● ●  Minimal additional structure required for launch  Tripod secondary support contributes to PM stiffness  Heritage concept with hardware implementation experience  Scalability to very larger telescopes  Most efficient packaging  No outboard mechanisms allowing minimal shroud diameter Advantages of Stacked Hex Deployment 28m UV/Vis/IR

Copyright 2007 Northrop Grumman Corporation 9 Stowed in EELV 5 m heavy (Restraint shell removed for clarity) 10 meter, 7 hex segment deployment scheme JWST bus subsystem re-use New telescope payload Far infrared wavelength detection requires ~ 4 deg K cooling Positioning boom Deploys and positions scope Thermally decouples scope from sunshield Very low frequency, highly damped jitter isolation Maintains balance between mass and pressure centers over large F.O.R. Lower frequency telescope attachments provide greater observatory flexibility and performance! SAFIR Observatory Concept

Copyright 2007 Northrop Grumman Corporation 10 Application of NGST High Accuracy Reflector Deployment System (1990) Stack Deployment Animation

Copyright 2007 Northrop Grumman Corporation 11 Thermal And Dynamic Isolation Boom Thermal and dynamic isolation boom concept with fine pointing Produces ~3 Pi steradian instantaneous field of regard Allows for improved momentum management by control of CP/CG

Copyright 2007 Northrop Grumman Corporation 12 “Sugar Scoop” Conical Advanced Sunshield Approaches Flat The level of thermal stability being demanded by future big telescope missions preclude the use of simple sunshields Need to look toward multi-layer or possibly active sunshields These too will need to be deployed

Copyright 2007 Northrop Grumman Corporation 13 Scaling to Very Large Apertures  Long standing analysis and design confirms that deployment of stacked, Hex segments provides the most efficient approach to scaling to large telescope apertures Scale the number of deployed rings Scale the size of the segments  Two basic approaches to scaling segmented telescopes: Issues Deployment of large number of segments Largest number of rigid body actuators Highest weight ratio Highest number of segment prescriptions Issues Highest risk of manufacturability of very large segments Requires largest faring diameter

Copyright 2007 Northrop Grumman Corporation 14 Structurally Connected Interferometer – 40 m

Copyright 2007 Northrop Grumman Corporation m spherical primary mirror telescope 30 meter spherical primary mirror Secondary (f/d = 1.79) Spherical corrector assembly

Copyright 2007 Northrop Grumman Corporation m Assembled Spherical Telescope concept Bus and telescope rendezvous and dock here

Copyright 2007 Northrop Grumman Corporation M Spherical Telescope Observatory Concept  Five EELV heavy launches  Total lift capability ~ 40,000 Kg’s  Observatory SWAG ~ 27,000 Kg’s  Weight margin ~ 48%

Copyright 2007 Northrop Grumman Corporation 18 Courtesy of Jack Frassanito & Associates and Dr. Harley Thronson On-orbit Servicing

Copyright 2007 Northrop Grumman Corporation 19 Key Technologies Enabling Next Generation Space Telescopes  Rapid, low cost fabrication of ultra-light weight primary mirror segments  Eliminates time consuming grinding and polishing  Several approaches including vapor deposition of nanolaminates bonded to actuated substrates  Active figure control of primary mirror segments  High precision actuators  Surface parallel actuation eliminates need for stiff reaction structure (SMD)  High speed wavefront sensing and control  High density figure control enables very light weight mirror segments  High speed, active while imaging WFS&C allows for rapid slew and settle and earth imaging  Highly-packageable & scalable deployment techniques  Deployment architecture should take advantage of light weight mirrors  Active control for light weight structural elements to supply good stability  Reduces weight required for vibration and thermal control Image Plane & WFS&C Sensor Imaging FPA (4096 X  m pixels) Model Sensor Scene Tracker Focal Plane Fine Figure & Phase Sensor Beam Footprint at FPA Plane Nonolaminate on Mandrel

Copyright 2007 Northrop Grumman Corporation 20 Conclusions  Space telescopes with 20-meter and larger apertures are within affordable reach by the mid-2020’s  To achieve this we need to initiate a technology development plan that thoroughly explores the trade options and identifies and matures the enabling technology  We need the sustained technology development funding to mature the technology

Copyright 2007 Northrop Grumman Corporation 21