Overview of Govt. Property Liability

Slides:



Advertisements
Similar presentations
Risk Management and the Contractor’s Property Management System
Advertisements

IND 205 Audit Analysis of an Outcome
IND 205 Demilitarize Government Property
COMPANY MAINTENANCE MANUAL
THE ROLE OF INSURANCE REQUIREMENTS WITHIN AN ORGANIZATION By Aaron Hardiman, MBA, ARM.
A Discussion of Property in the Possession of Contractors
It the responsibility of the executive head of your state agency to maintain the property records of those assets under the control of the agency. This.
A Myth-Busting Panel Discussion
James Lea Property Supervisor
CARLIN LAW GROUP, APC (619) Know Your Indemnity Obligation Know Your Risk Know Your Insurance Company by KEVIN R. CARLIN, ESQ.
St. Hugh Catholic School Student iPad Use Liability Agreement.
Course on Professionalism ASOP 43 – Property / Casualty Unpaid Claim Estimates.
FAR Part 44: Subcontracting Policies & Procedures February 5, 2012.
Completion Outstanding work and Remedying Defects In order that the Works and Contractor's Documents, and each Section, shall be in the condition required.
17 th Contracting Squadron I n t e g r i t y - S e r v i c e - E x c e l l e n c e LETTER CONTRACTS 2k7 01 Dec 05 Train and deploy the world’s foremost.
When is a Loss a “Loss” CLEARED FOR PUBLIC RELEASE Tom Ruckdaschel
DPW General Conditions Articles 32 through 37. Articles Covered Today  32 Owner’s Right to Withhold Payment  33 Owner’s Right to Stop Work and Terminate.
Contractor Business System Rule Revision #, Date (of revision) Presented By: Kendrick Dickerson, PA, DCMA Property Group May 3, 2013.
SUBCONTRACT MANAGEMENT Pamela McFarland. 2 AGENDA Statement of Work (SOW) Terms and Conditions Risk Assessment Site Visits Liability Records Disposition.
ORM Property Claims Blanket Property Boiler & Machinery Employee Bonds Crime Policy Bridge Property Damage.
Time for a new standard - AS General Conditions of Contract
Construction Contract Administration (ENGC 6363) ( FIDIC Chapter 15) EMPLOYER BY TERMINATION Presented by: Mustafa Al tayeb.
ISLAMIC UNIVERSITY OF GAZA FACULTY OF ENGINEERING CIVIL ENGINEERING DEPARTMENT Defects Liability [Construction Contract Administration] Chapter 11.
COMMERCIAL “SOLE SOURCE” PROPOSAL ANALYSIS ROADMAP 1. Is information available within the Government? Step 1 – Information within the Government If Yes.
LOGO October The Employer FIDIC 1999 dasdas Supervisor: Dr.Kamalain shaath Done by: Mahmoud Abu Kmail Construction Contract Administration ENGC.
Property Administration Revision 3, March 2011 Presented By: Ed Hoenig DCMAI HAQ 11 Apr
1 Construction Engineering 221 Construction Insurance.
The New FAR Property Plan Collaboration is Key 2007 Eastern Region Seminar Pat Jacklets, CPPM, CF.
Please use the following two slides as a template for your presentation at NES. Completing the DD Form 1149: — A Basic Perspective Walt Clark, CPPM Property.
PCARSS: Transfers of Accountability
CONTRACTUAL FLOW DOWN OF DPAS PRIORITY RATINGS
Edward Winters, CPPM CF Lockheed Martin Missiles & Fire Control July 26, 2011 CONTRACTOR LIABILITY A LOOK BEYOND Ground and Flight.
Aerospace Industries Association Intellectual Property Committee Fall 2009 meeting SMC Enabling Clause Holly Emrick Svetz (703)
Davis-Bacon, Related Acts, and Your Project Where you can locate the information needed to comply with Davis-Bacon and Related Acts 1.
FAR PART 45 – Government Property
When is a Loss a “Loss” Presented By: Kendrick Dickerson May 2, 2013 CLEARED FOR PUBLIC RELEASE.
FIND IT BEFORE THE AUDITOR DOES! Marlene Lynn, CPPM Manager of Asset Management, BAE Systems Electronic Solutions July 25, 2011.
2011 NPMA Conference Series III National Capital Area Conference Leaders in Asset Management Application of Standards into Policy Bill Franklin - Moderator.
Contractor Business Systems (CBS) Rule Eric Fassett.
Please use the following two slides as a template for your presentation at NES. Basic Property Management- Government Part III Presented by: Skip Adolph.
When is a Loss a “Loss” Presented By: Tom Ruckdaschel June 26, 2012 CLEARED FOR PUBLIC RELEASE.
FINANCIAL LIABILITY INVESTIGATION OF PROPERTY LOSS
Rabbanai T. Morgan Chief, Contingency Contracting 26 May 2005 Commercial Contract Financing.
2013 NPMA Fall Conference Value Through Professional Asset Management You’re Having a Property Management System Analysis (PMSA)…Now What??? Terri L. Snook,
Analysis of the Government Property Clause Requirements for FAR Dr. John I. Paciorek.
General Condition THE EMPLOYER Construction Law Supervised By : Dr. Kamalain Shaath Prepared By : Eng. Fawzy El.farra.
Presented by Dr. Douglas N. Goetz, CPPM, CF
Managing Government and Contractor Owned Assets at an OCONUS Location Ron C. Lobo, CPPM CF.
Department of Defense Current Events Panel Discussion Questions and Answers Amber Barber, Moderator.
Policies and procedures for developing acquisition plans; determining whether to use commercial or Government resources; whether it is more economical.
7 Plant, Materials and Workmanship. 7.1Manner of Execution The Contractor shall carry out the manufacture of Plant, the production and manufacture of.
Project Closeout Module #14 Prepared by Dr. Randy R. Rapp July 2005.
Government Furnished Property Policy Breakout
Financial Audit Autonomous Bodies AS 1 and 4 Session Accounting Standards.
National Property Management Association Lost Reports Barbara A. Finnegan, CPPM CF 1.
Conditions Of Contract For Construction Conditions Of Contract For Construction Presented BY : Arch. INA’AM J. El TAWIL FIDIC 1999Conditions of Contract.
Pittsburgh Alliance for Response Risk Management, Loss Control & Insurance February 2009.
Privacy Act United States Army (Managerial Training)
Accounting (Basics) - Lecture 6 Provisions and contingencies.
National Property Management Association Contract Property Closeout Standardization Cinda Brockman, CPPM CF, SAIC Pam McFarland, CPPM CF, Raytheon Technical.
OMB Circular A-122 and the Federal Cost Principles Copyright © Texas Education Agency
Defense Procurement and Acquisition Policy (DPAP) Presented by: Government Furnished Property Basics Carol Vigna, OSD AT&L DPAP
Instructions The Town of Sylvan Lake’s computer based health and safety orientation is simple process. Read each slide carefully To navigate through slides.
IUID and Government Furnished Property Basics
Administration of a FIDIC Contract - Commencement Date to + 28 Days -
LOSS OF GOVERNMENT PROPERTY
LOSS OF GOVERNMENT PROPERTY
Instructions The Town of Sylvan Lake’s computer based health and safety orientation is simple process. Read each slide carefully To navigate through slides.
Construction Contract Administration
Contractor Business System Rule
Presentation transcript:

Overview of Govt. Property Liability Presented By: Henry Pielaet, Property Group, DCMA-AQBYE April 3, 2014

Purpose of Today’s Briefing Provide an overview of: Policy related to Government property (as defined in FAR part 52.245-1, April 2012 &DFARS 245) What is Government property loss Contractor, Property Administrator and Contracting Officer responsibilities The Ground and Flight Risk Clause (GFRC)

Regulatory Guidance Federal Acquisition Regulation (Part 45-Policy) Main clause at 52.245-1 (April 2012) Specific contract terms and conditions DFARS (245-Policy) 252.211-7007 (Reporting of GFE to the DoD UID registry) 252.245-7001 (Tagging, Labeling and Marking of GFP) 252.245-7002 (Reporting Loss of Government Property) 252.245-7003 (Contractor Property Mgmt. System Admin.) 252.245-7004 (Reporting, Reutilization, and Disposal) ILPs, Procedures, Guidance & Information

Federal Acquisition Regulation 52.245-1(f)(1) (vi) Reports. The Contractor shall have a process to create and provide reports of discrepancies, loss of Government property, physical inventory results, audits and self-assessments, corrective actions, and other property-related reports as directed by the Contracting Officer. (vii) Relief of stewardship responsibility and liability. The Contractor shall have a process to enable the prompt recognition, investigation, disclosure and reporting of loss of Government property, including losses that occur at subcontractor or alternate site locations. (A) This process shall include the corrective actions necessary to prevent recurrence. 4

Federal Acquisition Regulation 52.245-1(Cont.) (B) Unless otherwise directed by the Property Administrator, the Contractor shall investigate and report to the Government all incidents of property loss as soon as the facts become known. Such reports shall, at a minimum, contain the following information [FAR 52.245-1(f)(1)(vii)(B)(1) Through (12)]: (1) Date of incident (if known). (2) The data elements required under (f)(1)(iii)(A). (3) Quantity. (4) Accountable contract number. 5

Federal Acquisition Regulation 52.245-1(Cont.) (5) A statement indicating current or future need. (6) Unit acquisition cost, or if applicable, estimated sales proceeds, estimated repair or replacement costs. (7) All known interests in commingled material of which includes Government material. (8) Cause and corrective action taken or to be taken to prevent recurrence. 6

Federal Acquisition Regulation 52.245-1(Cont.) (9) A statement that the Government will receive compensation covering the loss of Government property, in the event the Contractor was or will be reimbursed or compensated. (10) Copies of all supporting documentation. (11) Last known location. (12) A statement that the property did or did not contain sensitive, export controlled, hazardous, or toxic material, and that the appropriate agencies and authorities were notified. 7

What If the Loss Occurred at a Sub? It does not matter where the loss occurred The prime contractor is responsible for its subs The contract terms and conditions for liability are between Government and prime contractor. What matters is who signed the contract. However… The prime is required to flow down to its subs the “appropriate” risk of loss provision. If the prime flowed down full risk of loss and held its subcontractor financially responsible, the Government would be entitled to the monies received (“otherwise reimbursed”).

When is a loss a “loss”? All losses are not the same. Depends upon: Type of property (equipment or material) Facts: “What happened?” Context (inventory adjustment or loss?) Circumstances (due to inadequate storage? Lack of physical security?) Losses are: “Unintended, unforeseen, or accidental loss, damage, destruction of GP that reduces the Government’s expected economic benefits.” [DFARs clause 252.245-7002] Now in the FAR!

When is a loss a “loss”? (cont.) Property loss includes : Property that can’t be found after a reasonable search, theft. Damage/destruction from unexpected incidents—rendering the item useless for its intended purpose. Losses are not: Reasonable inventory adjustments [non-sensitive material, common hardware] Destructive testing Obsolescence Normal wear and tear Manufacturing defects

This is also a loss “Act of Nature” When is a loss…etc. (DFARS 252.245-7002)

When is a loss…etc. This is probably not a loss ? This is probably not a loss “…reasonable inventory adjustments of material typically a result of normal variation.” (DFARS 252.245-7002)

Contractor Reporting Requirements Report property loss to the Property Administrator: As soon as facts are known or Requested by the Government Data requirements: name, quantity, contract number, etc. Facts surrounding the loss Prevent Loss from Reoccurrence, How? Use of DCMA Property Loss 3.0 eTOOL is required per DFARS 252.245-7002

PA Responsibilities Review: Contract terms and conditions. Note: the Gov’t typically self-insures (assumption of risk/FAR 45.104) except for willful misconduct or lack of good faith (by managerial personnel). Examine facts and circumstances Determine: Context/type of loss; causality & link to the property management system. Appropriateness and effectiveness of any required corrective actions. Relieve contractor of responsibility and liability, or Recommend the CO hold contractor responsible: Financially liable Repair or replace Obtain other consideration from the contractor REMINDER: If the contractor’s submittal is not complete, the PA should reject the case in eTOOLS

Contracting Officer Resp. Review PA’s recommendation Determine: Extent of contractor liability—what does the contract say? “Intrinsic” value (value to the owner) Dynalectron Corp vs. U.S. (ASBCA No 29,831; 85-3 BCA para 18,320) Appropriate form and method of recovery Repair Replace Other ($) Make the call; inform contractor Update DCMA Loss eTOOL

Intrinsic Value REPLACEMENT SCRAP VALUE GP is Lost or destroyed. Government STILL has a current or probable Future need. LIABILITY VALUATION: REPLACEMENT Government has NO SCRAP VALUE GP is damaged Government still has a VALUATION: REPAIR SALVAGE Intrinsic Value

It’s A Matter of Law The magnitude of the government’s resources obviously makes it more advantageous for the Government to carry its own risks than to shift them to private insurers at rates sufficient to cover all costs, to pay their operating expenses, including agency of broker’s commissions, and to leave such insurers a profit [19 Comp. Gen 211, 214 (1939)] 17

Ground Flight Risk Clause Government (GFRC) & Flight Representative(GFR) Responsibilities DFARS 228.370 Government should self insure its aircraft through the GFRC/AFRC: 228.370 requires DFARS 252.228-7001, The Ground Flight Risk Clause (GFRC) and recommends DFARS 252.228.7005, The Aircraft Accident Reporting and Investigation clause. GFR ensures compliance with Contractor’s Combined Instructions and Operations Procedures, and the Contractor will cooperate in mishap investigations involving Aircraft. GFRC (2010), Indemnification The new GFRC, dated 8 June 2010, is used in all non-commercial DoD aircraft contracts for aircraft production, modifications, maintenance, repair, or overhaul. The GFRC indemnifies contractors from absorbing mishap costs ($100,000 or 20% of contract price, deductible). 18

GFRC Definitions Aircraft to be delivered to the Government under this contract (either before or after Government acceptance), including complete aircraft and aircraft in the process of being manufactured, disassembled, or reassembled; provided that an engine, portion of a wing, or a wing is attached to the fuselage of the aircraft. (a)(6) ‘In the Open’ (APT Reference Book Volume I – TAB E) In the Open means located wholly outside of buildings on the Contractor’s premises or other places described in the Schedule as being “in the open.” Government-furnished aircraft shall be considered to be located “in the open” at all times while in the Contractor’s possession, care, custody, or control. 19

GFRC Definitions (Cont.) Workmanship Loss Example: During modification of a GFE aircraft, a contractor’s worker cuts a hole into the wing spar twice the appropriate diameter. The wing spar with the hole must be replaced at a cost of $200K. The contract is valued at $75M. What is the extent of the Government’s liability? How much is the contractor responsible for? -Contractor is liable for all $200,000. 20

The Ground & Flight Risk Clause/GFR Determines Loss The GFRC establishes the Government’s assumption of risk for aircraft damage, loss, or destruction while in possession of the contractor. This includes leased (contractor to the Government) and bailed aircraft. This clause also establishes GFR authority to approve contractor flights, flight crewmembers, and flight and ground operations Procedures. Only the GFR has authority determine Loss when aircraft is in flight or out in the open, not the PA. The GFRC is usually found in section H or section I of the contract. 21

Overview of Govt. Property Liability Questions and Discussion Thank You! 22