Presentation to WMS Regarding PRR 731- Fuel Oil Index Price (FOIP) Larry Gurley July 18, 2007.

Slides:



Advertisements
Similar presentations
EMMS R4 GARF Addendum Ryan Aldridge, ERCOT Wholesale Market Development
Advertisements

1 Appeal to ERCOT Board Regarding Use of Fuel Oil Index Price (FOIP) Larry Gurley TXU Wholesale June 19, 2007.
RCWG Update to WMS April 9, VCMRR-VC for Cancellation of RUC Committed Resources Paragraph (3) of Nodal Protocol Section regarding Cancellation.
RCWG Update to WMS July 8, VCMRR008 - Alignment with NPRR700, Utilizing Actual Fuel Cost in Startup Offer Caps NPRR700 approved at May 2015 WMS.
ERCOT Billing, Settlement Disputes & Data Extracts
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee February 7, 2008.
Retail Market Update June 5, New meter is requested for a specific customer’s location. 2.Application is filed by customer and/or the customer’s.
May 29, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott June 3, 2014 TAC Update to RMS 1.
Overview of FIP Issues in the RUC, Verifiable Cost, and other Nodal Market Processes January 28, 2009 WMS Meeting.
1 How does ERCOT Review, Verify and Approve RMR Costs? (In response to questions that were asked during PRR 632 discussions) Prepared for the
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee May 4, 2006.
Report to TAC February In Brief Chair and Vice-Chair for 2009 Chair and Vice-Chair for 2009 Working Group Reports Working Group Reports QMWG QMWG.
Guidelines for Verification of Resource Specific Fuel Adders RCWG Paul Vinson.
RCWG Update to WMS July 10, General Update Agenda Items for Today: Fuel Adder NPRR 485-(no vote) Variable O&M for Technology Types (vote) Seasonal.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Verifiable Costs Process TPTF Meeting Nov 28, 2007 Ino Gonzalez.
Lead from the front Texas Nodal 1 Texas Nodal Load Frequency Control (LFC) EDS 3 Release 6 - Handbook EDS 3 Release 6 MP Planning.
E x p e r i e n c e C o m m i t m e n t SM ERCOT Nodal – Fuel Cost Analysis Verifiable Cost Working Group October 6, 2008.
RPRS ERCOT System Wide Insufficiency Charge Presented at the Technical Advisory Committee June 1, 2006.
Grabbing Balancing Up Load (BUL) by the Horns December 2006.
Report to TAC August In Brief Working Group Reports Working Group Reports CMWG CMWG DSWG (No report) DSWG (No report) MCWG MCWG MWG (No report)
Protocol Revision Subcommittee Sandy Morris November 3, 2011.
RCWG Update to WMS May 6, Real-Time Mitigation During Exceptional Fuel Events Option 3 – Increase MOC’s during Cold Weather Events When ERCOT.
Quick Start Resource – Payment for Start-Up at less than LSL Current NPRR language: ( 8) If a QSGR comes On-Line as a result of a Base Point less than.
MIG TF Voting Items Market Participant Notification Period (Transmission outage) – =1 Year Interconnection Date for Protocol Considerations – First Interconnection.
1 WMS Report TO TAC January In Brief Two Working Group Reports Two Working Group Reports Two Task Force Reports Two Task Force Reports One PRR.
RCWG Update to WMS July 11, Alternatives to Address Negative Prices At its June meeting, WMS directed RCWG to bring back something to vote on. RCWG.
Resource Cost Working Group October 7, 2015 WMS Update.
Resource Cost Working Group December 2, 2015 WMS Update.
Unit-Specific Bid Limits based on Modified Generic Cost.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Nodal Verifiable Costs Process WMS Meeting May 15, 2007 Ino.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee May 4, 2007.
RPRS TF and QSE Managers Report to PRS 1)Procurement (QSE Managers) 2)Cost Allocation (RPRS Task Force) –PRR 674 –PRR 676 –PRR 678.
NPRRs 663NPRR Ancillary Service Insufficiency Actions. This Nodal Protocol Revision Request (NPRR) specifies the actions ERCOT will take to ensure sufficient.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee May 8, 2008.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee January 6, 2010.
TPTF Verifiable Cost Sub-group Summary Final Report 3/xx/2008 Jim Galvin- TPTF VC Sub-group Chair.
Protocol Revision Subcommittee Report to ERCOT Technical Advisory Committee December 5, 2002.
Report to TAC July In Brief Working Group Reports Working Group Reports CMWG CMWG DSWG DSWG MCWG MCWG MWG MWG QMWG QMWG VCWG VCWG Task Forces Task.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Nodal Dispute Management System Business Requirements ERCOT.
Overview of Governing Document for Weather-Sensitive ERS Pilot Project Stakeholder Workshop Mark Patterson, ERCOT Staff March 1, 2013.
Market Credit Working Group update to the Wholesale Market Subcommittee 03/04/
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee October 1, 2009.
Role of Account Management at ERCOT 2006 TAC Subcommittee Review ERCOT Board February 21, 2006.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Verifiable Costs for Nodal WMS Meeting.
1 TAC Report to the ERCOT Board November 14, 2006.
© ERCOT and 2004 Fleet Deployment and Settlements WMS Meeting August 19, 2004 Ino Gonzalez ERCOT Settlements
December 2010 Wholesale Market Subcommittee Report to Technical Advisory Committee.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee September 3, 2009.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Verifiable Costs Process Settlement and Data Aggregation Working.
NPRR 649 Board Appeal Koch Ag & Energy Solutions February 9,
Next Steps on Reserve Discount Factor and 2016 Ancillary Service Methodology ERCOT Staff Date 02/25/2016.
OOMC and Local RPRS Settlement Alignment January 2007 WMS Meeting Ino Gonzalez ERCOT Settlements.
07/27/2006 Overview of Replacement Reserve Procurement ERCOT Staff PRS RPRS Task Force.
1 TAC Report to the ERCOT Board July 18, TAC Summary 4 PRRs for approval (3 unanimous) 4 PRRs for approval (3 unanimous) 5 Nodal PRRs for approval.
Overview of FIP Issues in the RUC, Verifiable Cost, and other Nodal Market Processes November 12, 2008 VCWG Meeting.
Reliability-Must-Run (RMR) Cost Evaluation and Settlement Basis Ino González ERCOT RMR Workshop May 24, 2016.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee October 5, 2007.
Fuel Cost Components in the Fuel Adder
2017 Seasonal Adjustment Factors
Exceptional Fuel Costs in LMP
Fuel Cost Components in the Fuel Adder
TAC Report to the ERCOT Board
Resource Cost Working Group
General Overview Of Resource Costs
Pilot Project Concept 30-Minute Emergency Response Service (ERS)
Fuel Cost Components in the Fuel Adder
TAC Report to the ERCOT Board
NPRR 816 / Vendor Index Definitions
September Protocol Transition Plan
Unsecured Bad Energy Debt and Unsecured Bad Capacity Debt Version 2
Presentation transcript:

Presentation to WMS Regarding PRR 731- Fuel Oil Index Price (FOIP) Larry Gurley July 18, 2007

Background During June, July and August of 2006, TXU Wholesale (now Luminant) burned fuel oil at 9 of its gas/oil plants to provide RPRS and OOM services. Luminant burned fuel oil instead of natural gas due to gas supply and delivery problems. ERCOT Protocols allow for recovery of “verifiable costs”.  If natural gas is used, a Fuel Index Price (FIP) based on natural gas prices may be used to “verify” costs in lieu of providing supporting documentation.  However, the Protocols are silent regarding the use of a fuel oil index price (FOIP) to “verify” costs in lieu of supporting documentation.

Background (Continued) In early 2007 (consistent with the settlement timeline in the ERCOT Protocols), Luminant submitted 3 requests for reimbursement of “verifiable costs” (one for each month) for a total of $1,136,294 (based on a fuel oil index price) to recover the cost of fuel oil burned during the summer of ERCOT denied the requests on the grounds that the Protocols do not specifically allow use of a fuel oil index price for “verifiable costs”. Subsequently, ERCOT agreed to allow recovery of $488,802 based on a natural gas index price. Thus, the remaining $647,492 is subject to review by the ERCOT Board pursuant to Protocol Section (4)(c). On June 19, the ERCOT Board rejected (without prejudice) Luminant’s appeal of ERCOT’s denial, stating that they wanted stakeholder input on this issue. PRR 731 is the result of that Board action.

Why Use an Index? Luminant seeks WMS endorsement of the use of a Fuel Oil Index Price (FOIP) because:  fuel oil is typically replaced as quickly as possible in order to ensure a ready supply for reliability,  an index price (not at average inventory price) best reflects market price paid for oil,  minimizes administrative costs for both the Market Participant and ERCOT when dealing with “verifiable costs”, and  use of index price is consistent with the approach approved in the Nodal Protocols.

Proposed Protocol Revision Fuel oil costs submitted for verification shall be based on replacement costs directly related to this RPRS event for use in calculating the costs in Section (3)(b) (i), (iii) and (v). Documentation of fuel oil costs shall be in sufficient detail to allow for the verification of the replacement cost of fuel oil consumed by the Resource receiving the RPRS Instruction. Documentation may include contracts, invoices or other documents. For gas fired Resources, such documentation will not be required if the requested incremental fuel cost is less than one hundred ten percent (110%) of the Fuel Index Price. For oil fired Resources, such documentation will not be required if the requested incremental fuel cost is less than one hundred ten percent (110%) of the Fuel Oil Index Price. Applies to Protocol Sections  – Local Congestion Replacement Reserve Payment to QSE)  – Capacity and Minimum Energy Payments  – Energy Payments

Questions?