Preferential Subject #3 Protection and Control of Series Compensated Networks S U M M A R Y Special Reporter: Graeme Topham South Africa Study Committee.

Slides:



Advertisements
Similar presentations
CONDITIONS FOR SUCCESSFUL INTERRUPTION:
Advertisements

RRC 04/05 ITU Information meeting September Computer methods for planning Ken Hunt Rapporteur for Chapter 10.
Project 1.3 Status Monitoring, Disturbance Detection, Diagnostics, and Protection for Intelligent Microgrids Dr Wilsun Xu C. Jiang,
Modeling Electrical Systems With EMTP-RV
Study Committee Representatives Annual Report December, 2012
FAULT TYPE SELECTION Jeff Roberts April 6 and 9, 2005.
Transmission Operator Protection System Misoperations 2014 ERCOT Transmission Protections System Misoperations Data – 138kV and 345kV Combined (Not including.
International Symposium on Standards for UHV Transmission System Impacts on UHV Substation Equipment On behalf of CIGRE WG A January 2009,
CREDIT RECOVERY AND COLLECTION. CHALLENGERS 1.Longer repayment period 2.Higher loan limits 3.Higher monthly installments 4.Many cases handling cash in.
Accurate Fault Location is Critical
NREL Wind Integration Workshop By Electric Power Systems, Inc. June 28-29, 2010.
CIGRE 7-10 September 2009, Moscow
Name: Osamu TSUBOI Country: Japan Registration No.: Group: B5 Pref. Subject: 1 Question: 7 1 Question 7 Non-harmonic-restraint schemes applied in Japan.
1 Study Committee Representatives Annual Meeting October 4, 2009 Toronto SC B4 “HVDC and Power Electronics” Activity Report Presented by: John McNichol.
July 11 th, 2005 Software Engineering with Reusable Components RiSE’s Seminars Sametinger’s book :: Chapters 16, 17 and 18 Fred Durão.
OHT 10.1 Galin, SQA from theory to implementation © Pearson Education Limited 2004 The testing process Determining the test methodology phase Planning.
EELE 461/561 – Digital System Design Module #6 Page 1 EELE 461/561 – Digital System Design Module #6 – Differential Signaling Topics 1.Differential and.
RiversidePublicUtilities.com Arts & Innovation RiversidePublicUtilities.com Challenges and Solutions for Large-Scale PV Integration on RPU’s Distribution.
Principle of Functional Verification Chapter 1~3 Presenter : Fu-Ching Yang.
Utility Scale Arc Flash Analysis using CAPE System Simulator.
Teaching linear circuit analysis effectively D. Biolek, V. Biolkova & K. Vrba Brno University of Technology Czech Republic.
New approach in functionality and testing for HV Capacitor Bank Protection Jorge Cardenas † (J.C.), Sean Cox ♣ (S.C), Petru van Wyk ♣ (P.W.), Boitumelo.
Zoran Gajić ABB AB Vasteras, Sweden
North East Pacific Time-series Underwater Networked Experiment (NEPTUNE): Power System Design, Modeling and Analysis Aditya Upadhye.
CIGRE Study Committee B5 Colloquium, Calgary September 2005 AREVA T&D Automation Protection & Control of Series Compensated Networks Z Q Bo PART.
Adaptive Protection of Distribution Feeders Alexander Apostolov, Benton Vandiver.
Electrical Distribution Training
Prepared By :.  Introduction  Techniques Used  Case Study  Advantages  Application  Conclusion OUTLINE.
New proposed BU circuit and control logic design University of Washington.
Preferential Subject #3 Protection and Control of Series Compensated Networks Special Reporter: Graeme Topham South Africa Study Committee B5 Colloquium.
Frankfurt (Germany), 6-9 June 2011 Smart Grid Protection in China Wu Guopei Guangzhou Power Supply Bureau Guangdong Power Grid, China.
1 TRANSMISSION SYSTEM OVERVIEW NETWORK OPERATING COMMITTEE April 17, 2007 New Mexico Transmission System Overview.
1 Study Committee Representatives Annual Meeting October 19, 2008 Winnipeg SC B4 “HVDC and Power Electronics” Activity Report Presented by: John McNichol.
©2009 Mladen Kezunovic. Improving Relay Performance By Off-line and On-line Evaluation Mladen Kezunovic Jinfeng Ren, Chengzong Pang Texas A&M University,
Slide 1 Line Current Differential Application on Short Lines Presentation to SSCET October 26 th, 2012.
NEPTUNE DC Circuit Breaker ATP Transient Analysis.
1 An Overview of Power Quality Problems In Transportation and Isolated Power Systems Paulo F. Ribeiro Calvin College / BWX Technologies, Inc Grand Rapids,
Lecture 22 Unbalanced Faults and Power System Protection Professor Tom Overbye Department of Electrical and Computer Engineering ECE 476 POWER SYSTEM ANALYSIS.
SC B5 - Protection and Automation Report to the Canadian National Committee of CIGRÉ 2009 Simon R. Chano Protection Specialist Hydro Québec TransÉnergie.
Lecture 22 Unbalanced Faults and Power System Protection Professor Tom Overbye Department of Electrical and Computer Engineering ECE 476 POWER SYSTEM ANALYSIS.
ECE 476 Power System Analysis Lecture 22: System Protection, Transient Stability Prof. Tom Overbye Dept. of Electrical and Computer Engineering University.
Announcements Read Chapters 10 and 11
Alain Schenk, Switzerland, ALPHA 3, Block 3.1, Selected paper Barcelona May ASSESSMENT OF PROTECTION SCHEMES: A KEY FACTOR FOR RELIABILITY.
Use of Synchronized Sampling in Fault Location ECEN Computer Relays Project #1 Presented by: Fahad Saleh Alismail UIN: Monday 03/03/2014.
Bolted Joint Assembly. Advanced Solid Body Contact Options Goal – In this workshop, our goal is to study the effect that contact stiffness specification.
1 © ABB Automation Technologies AB, PTSX/TP/A Janez Zakonjsek PS03_Q11_SE Janez Zakonjsek.
Frankfurt (Germany), 6-9 June 2011 Manuel Avendaño J. V. Milanović Manuel Avendaño – UK – Session 2 – Paper 0529 METHODOLOGY FOR FLEXIBLE, COST-EFFECTIVE.
Sub-Synchronous Frequency Detection Using SEL OGIC ® Control Equations SSF Relay ERCOT Workshop NPRR562 Subsynchronous Resonance Larry Gross.
IEEE AI - BASED POWER SYSTEM TRANSIENT SECURITY ASSESSMENT Dr. Hossam Talaat Dept. of Electrical Power & Machines Faculty of Engineering - Ain Shams.
CIGRE 2005 Joint Meeting 1 CH, Gino Bacchini & Walter Baass CIGRE SC B5 Colloquium in Calgary 2005: SR for PS#3 Question 14 Joint Meeting and Colloquium.
البحث السابع بحث منفرد منشور فى مؤتمر دولى متخصص (منشورة التحكيم علي البحث الكامل) Adel A. Elbaset 13th International Middle East Power System Conference,
OHT 10.1 Galin, SQA from theory to implementation © Pearson Education Limited 2004 The testing process Determining the test methodology phase Planning.
CIGRE SC-B5 Colloquium 2005 Sept Calgary Canada PS3:Protection & Control of Series Compensated networks Q3:Are there any experiences of other unique.
Announcements Design Project has firm due date of Dec 4
CONTROLLING Welingkar’s Distance Learning Division CHAPTER-17
PS3: Protection & Control of Series Compensated Networks
Effects of GIC Neutral Blocking Devices (NBDs) on Transmission Lines Protection Performance and Potential for Resonance.
Quality and Security Assessment of Protection Systems
2004 Cigre SCB5 Session Preferential Subject 3
IG BASED WINDFARMS USING STATCOM
PSCAD models.
Study Committee Representatives Annual Meeting October 18, 2010 Winnipeg SC B4 “HVDC and Power Electronics” Activity Report Presented by: John McNichol.
Question #10: What are the advantages, disadvantages, technical challenges and cost implications of using non-distance protection when compared to using.
the CERN Electrical network protection system
POWER SYSTEM ANALYSIS INTRODUCTION.
Protection Philosophy
Protective Relaying Conference
Peter van Oirsouw (Phase to Phase)
Considerations and Benefits of Using Five Zones for Distance Protection Ricardo Abboud, Jordan Bell, and Brian Smyth Schweitzer Engineering Laboratories,
M. Kezunovic (P.I.) S. S. Luo D. Ristanovic Texas A&M University
Presentation transcript:

Preferential Subject #3 Protection and Control of Series Compensated Networks S U M M A R Y Special Reporter: Graeme Topham South Africa Study Committee B5 Colloquium 2005 September 14 – 16 Calgary, CANADA

SUMMARY STUDIES SIMULATION DATA

Q1: Main utility considerations when deciding to series compensate a transmission line and/or what are the challenges faced? JP: Design considerations 275 kV double circuit SC line:  Simulation study: Degree of compensation vs. Stable transmission capacity  Special directional scheme for backup  Large scale field tests GS: Introducing SC more economical than additional line CA: Must be careful in choice of relays. Tests important CA: SC reduces influence of Geo-magnetic induced currents

Q2: What economic and/or environmental issues deter the implementation of series compensation? SE: Environmental issues can influence preferred location of SC

Q3: Experiences of other unique SC distance relay applications where special adjustments to settings and/or logic are required? BR: Extensive simulation tests -> necessity to refine logic and/or settings At lower voltages tests expensive -> tools needed CN: Deviation of power frequency component relay. Zero sequence source impedance artificially decreased. Adaptive functionality. JP: Special directional scheme. Based on memory function -> operating time delay for V inversion. Three directional distance elements required for SC double-circuit lines. Numerical technology allowed simplification.

Q3: Experiences of other unique SC distance relay applications where special adjustments to settings and/or logic are required? SE: Distance relay model – basis for problems for dealing with SC UK:  Special setting when accurate V measurement unavailable  Special polarizing V for direction decision  Cross differential relay proposed as better solution for double circuit lines  Weak infeed not a problem  New capacitor voltage calculation technique

Q3: Experiences of other unique SC distance relay applications where special adjustments to settings and/or logic are required? US: Formula based on gap voltage to come to a security factor for setting Z1 CA: Current diff relay better than distance relay SE: Margin for Z1 dependent on compensation degree

Q4: What analysis tools are available to utilities to assist in evaluating distance relay performance on SC applications prior to the purchase or choice of a particular relay type? BR: Use of RSim tool to ‘assemble’ a virtual relay. Good results for relays where enough info available. Cooperation between manufacturers and users SE: SS simulations (PSSE / CAPE) not suitable EMTP - insufficient relay details Only viable option is simulator tests US: Tools – relay manual; test report; test data base (COMTRADE files); simulation US: Real-time simulation - system specific and must be accurately CA: HyperSim

Q4: What analysis tools are available to utilities to assist in evaluating distance relay performance on SC applications prior to the purchase or choice of a particular relay type? CN: Digital model for development. Physical models for testing CA: Relay model info will allow users to see margin -> added security US: DLL file for EMPT testing

Q5: Besides zero sequence current compensation, what other techniques have been successfully applied to distance relays to resolve the impedance measurement inaccuracy on SC parallel lines? US: Supervise impedance measurement with superimposed direction function SE: China – 4 x 500 kV systems on same tower. Grounding switches?

Q6: What are the current experiences with using the weak infeed protection function, particularly in SC line protection applications? BR: Many problems with weak infeed function. How to determine temporary weak infeed terminals during long duration major disturbance and restoration? 2006 Session? CA: Agree weak infeed trip insecure Recommendation to separate WI from permissive trip Echo function in POTT schemes

Q6: What are the current experiences with using the weak infeed protection function, particularly in SC line protection applications? SE: WI important feature. Must consider all necessary precautions to prevent unwanted operations

Q7: What are the main technical difficulties with accurate fault location on SC lines and what fault location techniques are currently being successfully employed? JP: Experience with one- and two-terminal methods. Latter better than differential equation based algorithm. SE: Impedance method inaccurate especially when compensation degree switched. Travelling wave method found to be most accurate

Q8 a): What methodologies are used to optimize settings for series compensated line applications? SE: Real-time simulations to verify total protection scheme SE: Thyristor controlled capacitor needs to be correctly simulated when testing line protection

Q8 b): What are the requirements of utilities in terms of certification tests for relays and/or protection systems before applying these to SC lines? AU: Distance relay problems Transient fault studies essential Automatic test tool very useful BR: Real-time digital simulation to verify behavior and performance of relays. Also used to optimize settings. US: High quality records to verify models

Q9: What are utility experiences with non- distance protection applications on series compensated transmission lines? JP: FM current differential as main protection with directional distance as back-up

Q10: What are the advantages, disadvantages, technical challenges and cost implications of using non-distance protection when compared to using distance protection on SC applications? JP: Advantages of using current-based relay as main protection Operating time of back-up distance well co- ordinated 270 line faults cleared by Main. Backup not involved and no misoperations

Q10: What are the advantages, disadvantages, technical challenges and cost implications of using non-distance protection when compared to using distance protection on SC applications? UK: High charging current possible problem for current diff. Cross differential relay proposed option for double circuit lines. Examples of new relay principles being researched – surge impedance, noise generated protection and boundary protection techniques Importance of dynamic tests and international research and development collaboration

Q10: What are the advantages, disadvantages, technical challenges and cost implications of using non-distance protection when compared to using distance protection on SC applications? US: Comparison of distance protection (with and without comms) and directional comparison and importance of performance and cost assessment SE: Charging current compensation no longer a problem. Trend towards current differential.

Q11 a): What are the current experiences with auto- reclosing on series compensated transmission lines? Q11 b): What are the technical challenges and proposed solutions? SE: Duty cycles for thyristor controlled capacitor bank elements outlined. Challenge relating to multi-pole tripping and sequential reclosing. SE: Good experience with ARC (3-pole tripping) even on TCSC

BR: No UPFCs, but TCSCs successfully applied – No particular problems. Line protection set according to worst conditions Q12: Have there been any problematic protection issues relating to the use of UPFCs experienced by other utilities and what solutions are available?

Q13: What other novel theoretical tools are available to assist in the analysis and understanding of SC networks? SE: Practical results of complex subject of informational analysis in Russia

Q14: What influences of shunt capacitor banks on protection measurement are reported and how are the effects mitigated? CH: Large impact on the circulating currents and transient behaviour during line faults under weak infeed conditions. Close-to-zero V faults make direction determination difficult More than 1 polarization signal for direction decision recommended

PS-3 Concluding Comments Evidence of continued valuable work being done to improve the performance of the protection, control and monitoring of series compensated networks New challenges in protecting series compensated and adjacent transmission lines are emerging and innovative techniques to deal with such challenges and also to enhance equipment performance continue to be developed

PS-3 Concluding Comments Encouraging to see the high level of co- operation between manufacturers and utilities (evident from the number of joint papers) to solving application problems and also to improve protection equipment It is also apparent that a thorough understanding of the subject is advantageous in order to ensure optimal use of the correct equipment for particular applications

PS-3 Concluding Comments The importance and value added by collaboration through international bodies and working groups should not be underestimated