California Energy Commission - Public Interest Energy Research Program Public Interest Energy Research Relevant to Load Management Standards Michael Gravely.

Slides:



Advertisements
Similar presentations
Best Practices, Design Guidelines and Standards
Advertisements

Energy Analysis Department Electricity Markets and Policy Group DOE Smart Grid Investment Grant Program: Dynamic Pricing & Consumer Behavior Studies Chuck.
PG&E Automated Demand Response Program Webinar 2008 Program Summary and Participant Forum October 14, 2008.
© USCL Corporation - All Rights Reserved USCL Corporation 2737 Eastern Avenue Sacramento, California A managed approach to the successful.
Demand Response: The Challenges of Integration in a Total Resource Plan Demand Response: The Challenges of Integration in a Total Resource Plan Howard.
Introduction Build and impact metric data provided by the SGIG recipients convey the type and extent of technology deployment, as well as its effect on.
BG&E’s PeakRewards SM Demand Response Program Successful Approaches for Engaging Customers August 20, 2014.
1 The Potential For Implementing Demand Response Programs In Illinois Rick Voytas Manager, Corporate Analysis Ameren Services May 12, 2006.
AMI Home Area Network Update SAG Meeting March 18, 2014.
Gloria Godson VP, Federal Regulatory Policy Reliability Pricing Model Part 2.
Vendor Briefing May 26, 2006 AMI Overview & Communications TCM.
1 NARUC/FERC Collaborative on Demand Response Pepco and Delmarva Power Blueprint for the Future Filings J. Mack Wathen July 15, 2007.
SmartGridCity™: A blueprint for a connected, intelligent grid community Presented to the Utah Public Service Commission May 13, 2009.
Workshop for Proposed EPIC Triennial Plans Investor Owned Utility Programs July 31, 2014.
1 Automated Demand Response Strategies and Commissioning Commercial Building Controls Mary Ann Piette Lawrence Berkeley National Laboratory
Automated Demand Response Project History and Future Directions Presentation to the California Maritime Academy Mary Ann Piette Lawrence Berkeley National.
Automated Demand Response "PG&E" refers to Pacific Gas and Electric Company, a subsidiary of PG&E Corporation. ©2013 Pacific Gas and Electric Company.
IntelliGrid: Enabling The Power Delivery System of the Future Don Von Dollen EPRI IntelliGrid Program 9th International Symposium on Power- Line Communications.
SmartMeter Program Overview Jana Corey Director, Energy Information Network Pacific Gas & Electric Company.
How Energy Efficiency and Demand Response can Help Air Quality Presentation to the California Electricity and Air Quality Conference October 3, 2006 Mary.
American Electric Power (AEP) Virtual Power Plant Simulator (VPPS) Tom Jones, Manger – Corporate Technology Development American Electric Power Grid-InterOp.
1 Demand Response Update April, Strategic Perspective Demand Response  Aligns with PGE’s Strategic Direction; helping to provide exceptional.
California Statewide Pricing Pilot Lessons Learned Roger Levy Demand Response Research Center NARUC Joint Meeting Committee on Energy.
Less is More: SEE Action and the Power of Efficiency Hon. Phyllis Reha Commissioner, Minnesota PUC Co-Chair, SEE Action Customer Information and Behavior.
1 SmartMeter™ Delivering Customer Benefits Jana Corey Director, Policy Planning Integrated Demand-side Management Pacific Gas and Electric Company.
Incentives to achieve the future network and our DMIS strategy
Introduction & Overview April 11, 2011 Barry Haaser Managing Director.
Regional Technical Forum End-use Load Shape Business Case Project Project Initiation Meeting Portland, OR March 5, 2012.
Measurement, Verification, and Forecasting Protocols for Demand Response Resources: Chuck Goldman Lawrence Berkeley National Laboratory.
Overview of OpenADR May 4, 2011 Integrating Demand Response, Efficiency, Renewables and Smart Grid Sila Kiliccote Deputy, Demand Response Research Center.
Demand Response Research and Capabilities at LBNL Chuck Goldman Lawrence Berkeley National Laboratory Midwest Demand Response Initiative.
MEC: Customer Profitability Models Topic DSM – DR, Advanced EE and Dispatch Ability Jesse Langston, OG&E Oct 20 th 2013.
Energy Action Plan “Report Card” and the AB32 “Umbrella” CFEE ROUNDTABLE CONFERENCE ON ENERGY Julie Fitch California Public Utilities Commission Director.
1 OpenADR Taskforce Chair – Albert Chiu Co-chair – Ed Koch Technical Editors – Bruce Bartell, Gerald Gray.
EdF Programs in Demand Response Anne-Lise Didierjean - EdF Mark McGranaghan – EPRI Solutions (representing the Intelligrid Consortium Consumer Portal Project)
Energy Efficient Digital Networks Rich Brown Lawrence Berkeley National Laboratory Presentation to DOE State Energy Advisory Board Meeting August 14, 2007.
1 Smart Grid ‐‐ What is it and how will it help California? Michael Gravely Manager Energy Systems Research Office California Energy Commission
IEEE SCC41 PARs Dr. Rashid A. Saeed. 2 SCC41 Standards Project Acceptance Criteria 1. Broad market application  Each SCC41 (P1900 series) standard shall.
Presented to: California Energy Commission Efficiency Committee Workshop Load Management Standards Scoping Presented by: Mike Heinrich EPRI Member Technical.
Energy Analysis Department Cost-Effectiveness Valuation Framework for Demand Response Resources: Guidelines and Suggestions Chuck Goldman Lawrence Berkeley.
High Performance Buildings Research & Implementation Center (HiPer BRIC) Automating and Optimizing Demand Responsive Commercial Buildings December 21,
California Energy Commission - Public Interest Energy Research Program Demand Response Research Center Research Overview Load Management Informational.
“Demand Response: Completing the Link Between Wholesale and Retail Pricing” Paul Crumrine Director, Regulatory Strategies & Services Institute for Regulatory.
Greg Miller – EVP, Market Development
Linking the Wholesale and Retail Markets through Dynamic Retail Pricing Presented by: Henry Yoshimura Manager, Demand Response ISO New England September.
Leading the Way in Electricity TM Tariff Programs & Services Customer Services Business Unit Overview of Demand Response At Southern California Edison.
Information Technology for Building Operations, Energy Efficiency and Demand Response June 9, 2009 Mary Ann Piette Lawrence Berkeley National Laboratory.
EEI Energy Efficiency Initiative Eric Ackerman ( Senior Manager, Regulatory Policy April 23, 2007.
CEC 08-DR-1 Efficiency Committee Workshop 3/3/08.
High-Efficiency Buildings and Demand Response Phillip Price Mary Ann Piette Demand Response Research Center Lawrence Berkeley National Laboratory.
SOUTHERN CALIFORNIA EDISON® SM Preferred Resources Pilot August 17, 2015
CALIFORNIA ENERGY COMMISSION 1 Demand Response Research Center Research Opportunity Notice February 2, 2007 Mary Ann Piette Research Director, DRRC Rick.
The State of Demand Response in California Ahmad Faruqui, Ph.D. Principal June 13, 2007.
DR issues in California discussed last year in March Historical DR in California: some background issues –Twenty years of programs/tariffs I/C and AC cycling.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Page 1 Pacific Northwest Smart Grid Demonstration Project  Largest Smart Grid Demonstration.
Dynamic Pricing Case Studies. Digi International.
Demand Response Research Center Accomplishments and Future Directions Mary Ann Piette Research Director - Demand Response Research Center State Energy.
EDISON INTERNATIONAL® SM Smart Grid Value Proposition October 4, 2010 Lynda Ziegler.
Andrea Ricci - ISIS Brussels, 12 April 2012 Policy conclusions and way forward.
An Overview of Demand Response in California July 2011.
Government’s Evolving Role in Resource Planning and Environmental Protection Arthur H. Rosenfeld, Commissioner California Energy Commission April 19, 2002.
CEC Public Workshop Order Instituting Informational and Rulemaking Proceeding (08-DR-01) March 3, 2008.
Metering Americas April 24, 2006 Advanced Metering.
CEC Load Management Standards Workshop March 3, Update on the CPUC’s Demand Response and Advanced Metering Proceedings Bruce Kaneshiro Energy Division.
Eric Peirano, Ph.D., TECHNOFI, COO
Eric Peirano, Ph.D., TECHNOFI, COO
The Transition to a High DER Future
Karen Bartleson, President, IEEE Standards Association
New England Electricity Restructuring Roundtable
California Transportation Electrification Activities
Presentation transcript:

California Energy Commission - Public Interest Energy Research Program Public Interest Energy Research Relevant to Load Management Standards Michael Gravely Team Leader PIER Energy Systems Integration Team California Energy Commission /

California Energy Commission - Public Interest Energy Research Program Outline Demand Response Research Center (DRRC) Activities PIER Emerging Technology Development The Use of Reference Designs in Commercialization Process Energy Storage and Peak Load Shifting Technologies

California Energy Commission - Public Interest Energy Research Program Demand Response Research Center Research Overview Load Management Informational and Rulemaking Proceedings March 3, 2008 Mary Ann Piette Lawrence Berkeley National Laboratory Roger Levy Levy Associates

California Energy Commission - Public Interest Energy Research Program Presentation Outline DRRC Research Guidance DRRC Research Programs Automating Demand Response* Behavior Demand Response Value Dynamic Tariffs * (model for DRRC research)

California Energy Commission - Public Interest Energy Research Program Demand Response Research Center Research Objectives Objective Scope Research Goals Develop, prioritize, conduct and disseminate multi- institutional research to facilitate Demand Response. Technologies, policies, programs, strategies and practices, emphasizing a market connection Cost – develop cost effective approaches to improve DR implementation and operation Technology – evaluate the readiness of customers and buildings to support DR Capability – evaluate and develop strategies to support price and reliability response.

California Energy Commission - Public Interest Energy Research Program Demand Response Research Center “Guiding DR Design Principles ” DR Success Factors Design Principles Explanation Customer Choice Create adaptable, realistic operational strategies Minimize adverse impacts Maximize shifting and load impacts Automation Enable and simplify customer choice Enable price and reliability response Integrate DR with system operations Dynamic Rates Integrate efficiency and DR Reflect system costs and needs Establish a customer value function – “clear price and reliability signals that provide a relationship between how customers use energy and what they pay.”

California Energy Commission - Public Interest Energy Research Program Automated Demand Response (AutoDR) Targets commercial and industrial customers Provides customers with automated, electronic price and reliability signals. Provides customers with capability to automate site-specific DR strategies customized to their needs and facilities. Provide utilities with automated, dispatchable operational capability similar to conventional generation resources.

California Energy Commission - Public Interest Energy Research Program AutoDR is not a demand response program. AutoDR is an open, standardized communication and automation framework that supports all forms of DR. AutoDR expands customer choice, improves DR effectiveness and, addresses the operational needs of the CAISO, and the CPUC vision the objectives outlined in CPUC Rulemaking AutoDR is being formalized as an open communications standard through an industry consortium lead by the DRRC that includes PG&E, SCE, SDG&E, and CAISO. Automated Demand Response (AutoDR)

California Energy Commission - Public Interest Energy Research Program Manual DR - Common Practice

California Energy Commission - Public Interest Energy Research Program DRAS Clients – 1. Software only (Smart) 2. Software & Hardware (Simple) DR Automation Server and Client

California Energy Commission - Public Interest Energy Research Program Pilot Tests First Stage Commercialization  Accelerate implementation in response to CPUC ACR  Expand application beyond critical peak pricing (CPP) to other DR options.  Expand deployment to market-based aggregators and other non-utility technical resources  Improve DR performance.  Proof of concept  Technology Development  Customer experience  Impact evaluation  Strategy development Full Commercialization  National Standards  State standards in DR design / implementation  Links to Building Code in Title 24  Compliance – Title 24 Global Temperature Adjustment  Expansion to small C/I Next Steps Automated Demand Response (AutoDR)

California Energy Commission - Public Interest Energy Research Program Status of Automated DR Deployment * Total Participants 13 CPP 37 CPP 53 DBP 62 CBP 152 Total Total Base load8 MW80 MW Total Peak Load Reduced 1 MW25 MW Average Peak Load Reduction 13 %34% DR Programs under AutoDR CPP – Critical Peak Pricing DBP – Demand Bidding CBP – Capacity Bidding

California Energy Commission - Public Interest Energy Research Program Automated Demand Response (AutoDR) PG&E AutoDR Test Day – Non-Industrial AutoDR Participants :003:006:009:0012:00 Noon 3:006:009:0012:00 Whole Building Power (kW) Loads 3-10 MA Baseline AutoDR saves Energy Auto-DR Load Impact – 8/30 Non-Industrial

California Energy Commission - Public Interest Energy Research Program Load Impact – 8/30 All Participants Automated Demand Response (AutoDR)

California Energy Commission - Public Interest Energy Research Program 2007 Customer Response by DR Option Automated Demand Response (AutoDR) Southern California An EDISON INTERNATIONAL ® Company ® ® 0% 10% 20% 30% 40% 50% Average Peak Load Reduction CPP (1) DBP (3) C PP (28) DBP (34) CPP (7) CPP (1) 31% 51% 20% 14% 53% 19% IndustrialCommercialIndustrial CBP (62) 50% Commercial

California Energy Commission - Public Interest Energy Research Program CPP Performance With and Without AutoDR Average CCP Peak Load Reduction 8% w/AutoDR -1% w/o AutoDR Automated Demand Response (AutoDR)

California Energy Commission - Public Interest Energy Research Program Automation by Sector Programmable Communicating Thermostat Demand Response Automation Client Internet

California Energy Commission - Public Interest Energy Research Program Next Steps – Auto-DR and Related Research Complete final draft of Open DR Automation Server and client specification (May 2008) Facilitate implementation of open standards in state and national DR efforts Explore links to Building Codes (Title 24) Ensure compliance of Global Temperature Adjustment in 2008 Building Code (Title 24) Explore continuous energy minimization, energy management systems, and building codes

California Energy Commission - Public Interest Energy Research Program Behavior Research DR is a behaviorally driven system Behavior research explores “why and the how” not “who and the what” Current projects – residential and small commercial DR rates and technologies Field tests in summer 2008

California Energy Commission - Public Interest Energy Research Program Rate Transition Project Purpose Develop a framework for developing new, innovative and more equitable rate and incentive designs that simultaneously support energy efficiency and demand response. Objectives  Identify the leading issues in rate design  Identify barriers and constraints  Propose remedies and solutions  Develop strawman rate designs that illustrate the solutions  Draw out these themes in workshops  Work closely with the regulators and utilities  Guidance from a national Peer Review Group

California Energy Commission - Public Interest Energy Research Program Rate Transition Project 1. Revised Rate Design Principles 2. Recommendations for resolving rate related policy/design conflicts 3. Framework for side-by-side comparisons of rate design impacts on DR, equity, customer bills, risk, etc. Example Products

California Energy Commission - Public Interest Energy Research Program Rate Transition Project Example Products The largest impacts are produced by a default CPP/TOU for residential and medium C&I customers, and default RTP for large C&I customers The smallest impacts are produced by an optional RTP for all customers

California Energy Commission - Public Interest Energy Research Program DR Value Project 1.Summarize key observations from previous DRRC-sponsored work; 2.Compile and review prior and ongoing DR valuation research and methodology development efforts 3.Develop a provisional list of DR benefit categories that includes all forms of demand response – (1) economic (pricing),(2) reliability (emergency), and (3) financial for both wholesale and retail markets. 4.Consider benefits across stakeholders (e.g., System/Market Operators, Electricity Services Providers, Non-Participating End- use Customers; Generators; and Regulators) characteristic of each type (e.g., price-based or reliability-based) Demand Response program Objectives

California Energy Commission - Public Interest Energy Research Program PIER Emerging Technology Development

California Energy Commission - Public Interest Energy Research Program Demand Response Enabling Technologies DR Business Network (DR BizNet) Elegant architecture allows utilities to simplify enrollment in DR and other programs Allows more direct control of DR assets  Proving Concepts Developed and demonstrated a “proof of concept” PCT to ensure compatibility with commission standards, establish cost reasonableness and resolve technical issues DR BizNet Architecture Overview Equivalent Programmable Thermostat$12.70 Added Interfaces Communication Interface$3.45 Human-Machine Interface$0.15 HVAC Interface$2.15 Expansion Interface$1.75 Total Bill of Materials $20.20

California Energy Commission - Public Interest Energy Research Program Demand Response Enabling Technologies

California Energy Commission - Public Interest Energy Research Program Smaller, Cheaper Radio Components No External Components (inductors, crystals, capacitors) 0.13mm CMOS Full digital SPI control of analog/RF blocks 2mm 1mm

California Energy Commission - Public Interest Energy Research Program Testing Demand Response Enabling Technologies

California Energy Commission - Public Interest Energy Research Program Barrier Immune Radio Communications

California Energy Commission - Public Interest Energy Research Program

Use of Reference Designs to Accelerate Commercial Adoption of Interoperable Devices and Systems Erich W. Gunther EnerNex Corporation March 3, 2008

California Energy Commission - Public Interest Energy Research Program What is a Reference Design? “Reference design refers to a technical blueprint of a system that is intended for others to copy. It contains the essential elements of the system; however, third parties may enhance or modify the design as required. The main purpose of reference design is to support companies in development of next generation products using latest technologies. The reference product is proof of the platform concept and is usually targeted for specific applications.” Source: Wikipedia

California Energy Commission - Public Interest Energy Research Program EXAMPLES OF SUCCESSFUL REFERENCE DESIGNS Cell Phone Personal Computer Point of Sale Terminals Automatic Teller Machines Cable Modems USB Thumb Drive

California Energy Commission - Public Interest Energy Research Program Facets of a Reference Design Hardware  Cell phone, GPS, meter, thermostat, ATM Software  Word processor, spreadsheet, customer information system, billing application, ATM Networks  Internet, PSTN, cellular, ATM Information and Transactions  EDI, POS, ATM

California Energy Commission - Public Interest Energy Research Program Thumb Drive Reference Design

California Energy Commission - Public Interest Energy Research Program Benefits of a Reference Design “Reference Design Packages enable a fast track to market thereby cutting costs and reducing risk in the customer's integration project. Reference designs enable customers to shorten their time to market.” 1 Facilitates the rapid development and deployment of interoperable systems, reduces system cost, increases competetion, reduces the potential for vendor lock-in 1 Source: Wikipedia

California Energy Commission - Public Interest Energy Research Program Cable Modem Evolution LANcity (Nortel) Com21 Terayon Motorola General Instruments Zenith Hewlett-Packard Cisco Systems (DOCSIS reference design partners)  Toshiba, Philips,… CM Proprietary  CM DOCSIS CM Proprietary Cable Infrastructure, STB, CM Proprietary Cable Infrastructure, STB, CM Proprietary w/ Telco Return CM Proprietary w/ Telco Return CM Proprietary  exited market in 1996 Vendor Lock-In (proprietary systems) Standards Formation Heterogeneous Solutions (DOCSIS best of breed & low cost) DOCSIS Standards Initiative Started

California Energy Commission - Public Interest Energy Research Program Energy Industry Reference Designs Revenue Meters Substation Automation RTU GEODE WebPAD RD for GE Smart Appliance UtilityAMI/OpenHAN

California Energy Commission - Public Interest Energy Research Program Energy Storage and Peak Load Shifting Technologies

California Energy Commission - Public Interest Energy Research Program California’s Electricity Demand is Dynamic

California Energy Commission - Public Interest Energy Research Program California’s Highest Peak Loads Occur Less Than 60 Hours Per Year

California Energy Commission - Public Interest Energy Research Program California’s Highest Peak Loads Can Result in High Energy Prices

California Energy Commission - Public Interest Energy Research Program Energy Storage Technologies Can Address California Challenges

California Energy Commission - Public Interest Energy Research Program Active Projects  Ultracapacitor Technology  Flywheel Technology  ZBB  VRB  NaS  CAES (underground and modular above ground) PIER Energy Storage Research

California Energy Commission - Public Interest Energy Research Program Ultra Capacitor Technology

California Energy Commission - Public Interest Energy Research Program Flywheel Technology

California Energy Commission - Public Interest Energy Research Program ZBB Technology

California Energy Commission - Public Interest Energy Research Program VRB Technology

California Energy Commission - Public Interest Energy Research Program Battery Module NAS Battery 8MW / 57.6MWh Fuses Cells 2.2 m 1.7 m Main Pole Sand Heater Vacuum Vessel 0.67 m NaS Technology

California Energy Commission - Public Interest Energy Research Program Capital Cost Comparison of Energy Storage Plant Types Technology $/kW + $/kWH * x H = Total Capital, $/kW Compressed Air, CAES - Large ( MW) Small (10-20MW) AbvGr Str Pumped Hydro, PH - Conventional PH (1000MW) Battery, BES (target) (10MW) - Lead Acid, commercial Advanced (NaS/Flow) Flywheel (target) (100kW) Superconducting (1MW) Magnetic Storage, SMES (target) Super-Capacitors (best today) / (target) / (target) / * This capital cost is for the storage "reservoir", expressed in $/kW for each hour of storage. For battery plants, costs do not include expected cell replacements. EPRI updates these plant costs as technology improvements occur. of storage. For battery plants, costs do not include expected cell replacements. EPRI updates these plant costs as technology improvements occur. Technology $/kW + $/kWH * x H = Total Capital, $/kW Compressed Air, CAES - Large ( MW) Small (10-20MW) AbvGr Str Pumped Hydro, PH - Conventional PH (1000MW) Battery, BES (target) (10MW) - Lead Acid, commercial Advanced (NaS/Flow) Flywheel (target) (100kW) Superconducting (1MW) Magnetic Storage, SMES (target) Super-Capacitors (best today) / (target) / (target) / * This capital cost is for the storage "reservoir", expressed in $/kW for each hour of storage. For battery plants, costs do not include expected cell replacements. EPRI updates these plant costs as technology improvements occur. of storage. For battery plants, costs do not include expected cell replacements. EPRI updates these plant costs as technology improvements occur.

California Energy Commission - Public Interest Energy Research Program

Questions???