LHC Lumi Days – 01/03/2012 Jean-Jacques Gras on behalf of the CERN Beam Instrumentation Group 1.

Slides:



Advertisements
Similar presentations
IEFC Workshop – 22/03/2011 JJ Gras on behalf of BE-BI 1.
Advertisements

LHC Lumi Days – 14/01/2011 D. Belohrad, JJ Gras, M. Ludwig, P. Odier (BE-BI) 1.
Status of the CTP O.Villalobos Baillie University of Birmingham April 23rd 2009.
TileCal Electronics A Status Report J. Pilcher 17-Sept-1998.
CMS ECAL Laser Monitoring System Toyoko J. Orimoto, California Institute of Technology, on behalf of the CMS ECAL Group High-resolution, high-granularity.
SuperB and the ILC Damping Rings Andy Wolski University of Liverpool/Cockcroft Institute 27 April, 2006.
January 15, 2005D. Rubin - Cornell1 CESR-c Status -Operations/Luminosity December/January vs September/October -Machine studies and instrumentation -Simulation.
BSRT Optics Design BI Days 24 th November 2011 Aurélie Rabiller BE-BI-PM.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Stability Workshop April , 2007 NSLS-II Electrical Systems G. Ganetis NSLS-II Electrical Systems NSLS-II.
Matching and Synchrotron Light Diagnostics F.Roncarolo, E.Bravin, S.Burger, A.Goldblatt, G.Trad.
Profile monitors, Injection Matching monitor, BSRT & BSRA LHC OP days - 19 th of January 2010 – Evian Stephane Bart Pedersen, Andrea Boccardi, Enrico Bravin,
S. White, LBS 17 May Van Der Meer Scans: Preliminary Observations.
Beam profile measurements based on modern vertex detectors and beam-gas interactions Slides from: Colin Barschel - TIPP 2014 third international conference.
SCH: LEADE LPM+AG 15/12/031 Non intercepting diagnostics based on synchrotron light from a bending magnet (started as “piggy back” on transverse profile.
The Transverse detector is made of an array of 256 scintillating fibers coupled to Avalanche PhotoDiodes (APD). The small size of the fibers (5X5mm) results.
Electronics for PS and LHC transformers Grzegorz Kasprowicz Supervisor: David Belohrad AB-BDI-PI Technical student report.
Status of the Beam Phase and Intensity Monitor for LHCb Richard Jacobsson Zbigniew Guzik Federico Alessio TFC Team: Motivation Aims Overview of the board.
Linac4 FBCT’s 18/ L4 BI BCT review Lars Søby On the behalf of: M. Andersen, D. Belohrad, L. Jensen, Franco Lenardon and J. C. Allica Santamaria.
S. De Santis “Measurement of the Beam Longitudinal Profile in a Storage Ring by Non-Linear Laser Mixing” - BIW 2004 May, 5th Measurement of the Beam Longitudinal.
BI day 2011 T Bogey CERN BE/BI. Overview to the TTpos system Proposed technical solution Performance of the system Lab test Beam test Planning for 2012.
My working experience Marco Villa Tue, 2 nd Dec 2008.
BCT for protection LHC Machine Protection Review April 2005 David Belohrad, AB-BDI-PI
C. Fischer – LHC Instrumentation Review – 19-20/11/2001 Gas Monitors for Transverse Distribution Studies in the LHC LHC Instrumentation Review Workshop.
LCLS_II High Rep Rate Operation and Femtosecond Timing J. Frisch 7/22/15.
Nominal intensity bunches ● First ramp with nominal intensity bunches suffered from an instability appearing around 1.8 TeV. ● Nominal intensity bunches.
The Quadrupole Pick-up in the CPS -intro and progress report PPC 3 Dec 1999 A. Jansson.
BSRT CALIBRATION MD SUMMARY LSWG #6-15/09/2015 BSRT TEAM.
Vertical Emittance Tuning at the Australian Synchrotron Light Source Rohan Dowd Presented by Eugene Tan.
Matching monitors for SPS and LHC E. Bravin 31 March 2011.
Wednesday ● 02h04: Stable beams # b x 121b. – Peak luminosity 1.2e25 cm-2 s-1 ● 08h32: Beams dumped on request. – Length=6h28. Rampdown.
Intensity measurements using TRIC Juan Carlos Allica On behalf of: M. Andersen, D. Belohrad, L. Jensen, F. Lenardon, A. Monera, L. Søby 1.
Adams Accelerator Institute 10 - E. Wilson - 1/24/ Slide 1 Lecture 14 ACCELERATOR PHYSICS MT 2004 E. J. N. Wilson.
Overview Consolidation projects for PS LIU-PS Main observable review Conclusion Acknowledgements S. Gilardoni R. Steerenberg G. Metral H. Damerau BI colleagues.
CERN LECC 2006, September, Valencia, Spain Acknowledgements: Eva Calvo Giraldo, AB/BI Rhodri Jones, AB/BI Greg Kasprowicz, AB/BI Thilo Pauly, ATLAS.
BCT’s for beam protection L. Søby On behalf of D. Belohrad, L. Jensen and P. Odier 6/12/15Internal workshop ON MPP readiness for MJ beams 1.
14/1/2011 LHC Lumi days - J. Wenninger 1 IP positions and angles, knowledge and correction Acknowledgments: W. White, E. Calvo J. Wenninger BE-OP-LHC.
9/25/2006All experimenters meetingA. Jansson 1 Tevatron Ionization Profile Monitors Andreas Jansson.
Challenges in Beam Instrumentation Rhodri Jones (BE/BI) LIU-2011 Event, 25 November 2011, CERN.
BSRT UPDATE LMC 02-OCT-2012 F.Roncarolo on behalf of the BSRT team W.Andreazza, E.Bravin, A.Boccardi, J-J.Gras, A.Goldblatt, M.Hamani, T.Lefevre, R.Jones,
Progress with Beam Report to LMC, Machine Coordination W10: Mike Lamont – Ralph Assmann Thanks to other machine coordinators, EIC’s, operators,
Thursday 20 th April 01:53 RCBV17.R7B2 tripped as happened few days ago: SIS intercepted. 05:54 Stable beams, 1380b, still RF problems B1, abort gap cleaning.
Instrumentation at ATF / TTF Accelerator Test Facility (KEK) Tesla Test Facility – FLASH (DESY) ESA / LCLS (SLAC) Marc Ross, SLAC.
Tevatron Beam Position Monitor Upgrade Stephen Wolbers (for the Tevatron BPM Upgrade Project) PAC05, Knoxville, TN May 16-20, 2005.
Improvements to the LHC DCCT system P. Odier, C. Barschel, J.-J. Gras, L. Jensen, J. Longo, M. Ludwig, S. Thoulet P.Odier BI day /18.
Summary of ions measurements in 2015 and priorities for 2016 studies E. Shaposhnikova 3/02/2016 Based on input from H. Bartosik, T. Bohl, B. Goddard, V.
Collimation Aspects for Crab Cavities? R. Assmann, CERN Thanks to Daniel Wollmann for presenting this talk on my behalf (criticism and complaints please.
Beam Instrumentation of CEPC Yue Junhui (岳军会) for the BI Group Accelerator Center, IHEP HF2014.
3/06/06 CALOR 06Alexandre Zabi - Imperial College1 CMS ECAL Performance: Test Beam Results Alexandre Zabi on behalf of the CMS ECAL Group CMS ECAL.
Requirements from BI and new instruments after LS1 LHC Optics Measurement and Correction Review; B.Dehning 1 Bernd Dehning CERN BE/BI
G. Trad on the behalf of the BSRT team Emittance meeting 04/11/2015.
LHC Wire Scanner Calibration
LCLS_II High Rep Rate Operation and Femtosecond Timing
Beam Gas Imaging Kick-off meeting 30-Oct-2012
Summary of experience with Tevatron synchrotron light diagnostics
Status of the Beam Phase and Intensity Monitor for LHCb
Saturday 21st April 00:33 Interlock during ramp on BLM HV
LHC Emittance Measurements and Preservation
Fill 1410 revisited Peak luminosity 1.4e32 Beam current 2.68/2.65 e13
Proton Beam Diagnostics
Tuesday 28th September Fill 1375 ongoing 09:00 Move in Roman Pots
Beam Current Monitoring with ICT and BPM Electronics
450 GeV Initial Commissioning with Pilot Beam - Beam Instrumentation
Towards a ground motion orbit feed-forward at ATF2
90m "proper" VdM scans in the 90m/10m optics
Another Immortal Fill….
Measurement of the beam (transverse) emittances
ATLAS full run-2 luminosity combination
Wednesday 8th (I) 09:22 Fill #1855. Beams dumped by Alice dipole trip Stable beams for 10.5 hours; int. lumi 31 pb-1 After investigation EPC could not.
Beam Phase and Intensity Monitor for LHCb
Monday 152 bunch operation summary
Presentation transcript:

LHC Lumi Days – 01/03/2012 Jean-Jacques Gras on behalf of the CERN Beam Instrumentation Group 1

Presentation Overview This presentation will focus on the developments foreseen in the near future on Beam Instrumentation of relevance for luminosity determination. n.b.: Alex will cover the BRAN in the next talk. Beam Current MeasurementsBeam Profile MeasurementsBeam Position MeasurementsConclusions 2

Beam Current via DCCT As demonstrated yesterday by Colin (see conclusions below), our 2011 objective for an absolute accuracy below 1% of our DCCT in all conditions has been more than achieved. As explained, our remaining main source of error is now linked to our ADC bins. Work in progress (see next slide) and looks extremely promising We also have to convince ourselves in the lab during 2012 that the DCCT will perform as well with nominal 25ns beams. 3 P. Odier, S. Thoulet, M. Ludwig, L. Jensen

Beam Current via DCCT In addition to some uncertainty on the calibration, our poor ADC bin (12 bits) is also giving some artefact on the measurement like it is shown on the top picture. This can be explained by a combination of ADC bin, noise and acquisition averaging. See the demo (n.b. you must install first the CDF Player to enjoy it)demo CDF Player Bottom picture shows the results of our 24 bits ADC during this time. This board is still under commissioning but it can already be used during VdM scans bits ADC 24 bits ADC P. Odier, S. Thoulet, M. Ludwig, L. Jensen

Beam Current via DCCT The results of this 24 bit ADC board are really promising. Let’s look in details on this 01/11/2011 fill where some studies on UFO happened These UFO’s seen by this ADC. Some more than in Logbook. We are currently studying plugging lifetime on this device to (see below) 5 P. Odier, S. Thoulet, M. Ludwig, L. Jensen

Beam Current via Fast BCTs As demonstrated yesterday by Massi (see conclusions below), FBCT provided accurate measurements during 2011 VdM scans but we start seeing systematic effects at the permil level. We identified the weakest part of our system to be the monitor itself, which suffer from bunch length and position dependence. Our priority this this will be to assess a other monitor technology: Integrating Current Transformers 6 D. Belohrad, M. Ludwig, L. Jensen

Beam Current via Fast BCTs: ICT Plans  April: production of two ICTs, laboratory tests, winding of the cores.  April TS: installation in the tunnel instead of one system B FBCT,  May onwards: tests and performance assessments  If OK, produce monitors for LS1 7 D. Belohrad, M. Ludwig, L. Jensen Split into to 2 parts allow installation without vacuum intervention. Final version would be a in 1 piece.

Beam Current via WCM 8  Work is on-going to improve overall frequency response of system  We will assess this new algorithm on PS and LHC monitors and eventually use them as another input during vdM scans  We hope to achieve with this a relative accuracy below the 1% level.

Beam Current via Sync. Light (LDM-BSRA) Basic Principle : Charge particules produce light when they are bent by a magnetic field. This look simple but for many reasons, it is not! and our optical bench is quite crowded to try to cope with all abberations and requirements. It has to host the Abort Gap and Longitudinal Density Monitors in addition to our Profile Monitors 9

Beam Current via LDM 10  In the tunnel, it looks like ->  As explained by Adam yesterday, our main issues with the LDM are: Our dependence on beam position The difficulty to evaluate the debunched beam population

Beam Current via LDM  Method:  Single photon counting with synchrotron light  Avalanche photodiode detector  50 ps resolution TDC APD TDC synchrotron light LHC turn clock Electrical pulse Arrival time filter Longitudinal Bunch Shape Adam Jeff, Andrea Boccardi, Enrico Bravin and Rhodri for the animation

Beam Current via LDM: Emittance/Alignment Dependence 2011 Set Up 12 Focused light from BSRT APD APD acceptance Transverse profile APD acceptance Our APD has a small acceptance w.r.t. incoming beam size. Alignment variations (from undulor to D3 or due to beam motion) can modify the transmission. This also introduces a dependence on beam size. Adam Jeff, Andrea Boccardi, Enrico Bravin

Beam Current via LDM: Emittance/Alignment Dependence 2012 Test Set Up on B1 13 APD acceptance Profiles after diffusion Spot size after diffuser ~ independent of beam size -> emittance dependence reduced But we lose a lot of light! Adam Jeff, Andrea Boccardi, Enrico Bravin APD Light from BSRT Diffuser

Beam Current via LDM: Emittance/Alignment Dependence 2012 Test Set Up on B1 14 APD acceptance Profile after diffusion Spot size after diffuser ~ independent of beam size -> emittance dependence reduced Good coupling efficiency, plenty of light! Adam Jeff, Andrea Boccardi, Enrico Bravin Light from BSRT Diffuse r APD

Beam Current via LDM We will also investigate in 2012 if the Abort Gap could help us to define the amount of debunched beam we may neglect with the current algorithm used to evaluate ghost charges. 15 Adam Jeff, Andrea Boccardi, Enrico Bravin

Beam Emittances via BSRT 16 Fedrico Rocarolo, Aurelie Rabiller, Enrico Bravin, Ana Guerrero Diffraction Depth of field Extended source Camera resolution  PSF :

Beam Emittances via BSRT Not so Good - B2 3.5 TeV ● Single correction factor doesn’t work for both small & big bunches ● Indicates scaling factor in addition to correction in quadrature Actions 2012:  Understand sources of errors  Improve the optical line wherever possible  Publish corrected sigmas within error of ±10% at injection & top energy (and possibly corresponding emittances)  Move front-end software to new LINUX PC to allow quicker processing and acquire bunch by bunch profiles a factor 10 faster 17 Fedrico Rocarolo, Aurelie Rabiller, Enrico Bravin, Ana Guerrero

Beam Emittances via BWS Main 2011 Issue : noise on B1 signal (Source investigated during several technical stops but not identified) has been fixed :  We systematically acquire a dummy bunch in abort gap  Subtract this baseline from the real bunch signal  Tested in MD3 & successfully applied for subsequent operation BWS will remain the reference for beam emittance measurements (up to 5 e 12 p at 3.5 TeV, 2.5 e 13p at 450 GeV) 18 Ana Guerrero, Jonathan Emery Before and After Correction

Beam Position at BPMSW Both beams in the same pipe  Leads to cross-talk between the beams  Isolation is only ~20dB (factor 10) – difficult to improve  Main signal perturbed by parasitic signal from other beam  System can trigger on other beam (displaced at these locations) falsifying average orbit Solution  Use synchronous mode - orbit calculated from single bunch (firmware deployed)  Needs mask configured for filling pattern & BPM location (underway) 19

Beam Position at BPMSW The eratic behavior of the BPMSW should disappear with the implementation of the synchronous orbit. We expect noise below 10 microns on these BPMSW but they will still suffer from our overall temperature dependence, which we plan to significantly reduce during LS1 20  T = 1°C Eva Calvo, Rhodri Jones, Lars Jensen Prototype temperature controlled racks currently under test. Achieved stability <1°C over 3 day period The remaining 50μm variation is under investigation Currently ∆T +/- 5°C ∆x 200μm

Conclusions & Acknowledgments We would like to take this opportunity to again thank you for:  Your trust in our capacity and will to serve you well  Your patience  Your help (especially the BCNWG and in particular Colin and Gabriel) in analyzing our instrument results  Your very demanding requirements and gentle pressure, which significantly speeded up our progress on understanding our systems We were happy to hear yesterday that the bad news is that other sources of uncertainties can not rest in peace behind Beam Instrumentation’s ones anymore. But we’ll try to keep the current momentum and continue to progress on all these instruments until we feel we reached their full potential. 21

Beam Current via Fast BCTs: ICT Principe When the beam passes, the beam charge is first stored into the capacitor storage, then read away using high permeability toroid. Two time constants involved:  1 from beam passing to capacitor storage (T beam )  1 from readout (T readout ) Output charge independent of beam position and length but T beam has to be smaller than T readout 22 D. Belohrad, M. Ludwig, L. Jensen