SO – CART Project Status Protocol Revision Subcommittee Update 2/23/06.

Slides:



Advertisements
Similar presentations
Reliability Software1 Reliability Software Minimum requirements & Best practices Frank Macedo - FERC Technical Conference July 14, 2004.
Advertisements

PacifiCorp-CAISO EIM Initiative Overview
ERCOT Nodal Protocols Telemetry Requirements Proposal
ERCOT’S COMPLIANCE ASSESSMENT PROGRAM Mark Henry Compliance Manager March 23, 2005.
System Operations Staffing Request Presented to the ERCOT Board Of Directors By Sam Jones, COO November 16, 2004.
9/14/2015 IEEE Presentation Time-Based Management of Large Scale Network Models John Moseley P.E. Lead Network Model Engineer.
1 TSP Nodal Engagement Market Participant Call ERCOT August 04, 2010.
June 12, 2008 ROS SEM Go-Live procedure Linda Clarke.
03/22/07 TPTF meeting ICCP Quality Codes Bill Blevins/Frank Kendall.
ERCOT IT Update Ken Shoquist VP, CIO Information Technology Board Meeting May 2004.
ERCOT PMO Update Robert Connell Director Program Management Fourth Quarter Results (Through 12/31/04) January 11, 2005.
Lead from the front Texas Nodal 1 Texas Nodal Market Implementation Program Implementation Scenarios September 6, 2006.
IO – CART Project Status Protocol Revision Subcommittee Update 06/22/06.
1Texas Nodal Texas Nodal Market Trials and Data Verification ROS Meeting By Steve Grendel, ERCOT Thursday, 01/11/2007.
Lead from the front Texas Nodal 1 Texas Nodal Energy Management System Requirement Documents December 5, 2006 Jay Dondeti EMS Project.
EDS 2 Early Delivery Systems Review and Request for Approval May 2007 John Webb.
1Texas Nodal Market Trials Update. 2Texas Nodal Full System Market and Reliability Test 24-Hour Test Observations Duration of Test for Week of 8/ Hour.
Application and Implementation of State Estimator at Idaho Power Company S. Kincic and M. Papic.
1 Compliance Update May Control Performance Highlights  NERC CPS1 Performance Performance further declined in March  March performance comparison.
Texas Nodal 1 Nodal Operations Model Posting Confirmation TAC May 7, 2009 Matt Mereness, ERCOT.
ERCOT Program Management Update RMS Meeting – May 15, 2003 Steve Wallace.
NPRR XXX: PRR 307 Inclusion in Nodal…Part II. Questions Raised 06/26/06 Section 3 –COP (resource parameters) –CLR participation limits –Telemetry Requirements.
Lead from the front Texas Nodal 1 EDS 3 R6.2 Testing Overview Texas Nodal Load Frequency Control (LFC) EDS 3 Release 6 LFC WebEx.
EDS 2 Early Delivery Systems Release 3 – WebEx Conference July 10, 2007.
ERCOT PMO Update Robert Connell Director Program Management Board of Directors Update February 2005.
Lead from the front Texas Nodal 1 Integrated ERCOT Readiness and Transition (IRT) TPTF - November 6 th, 2006.
© Property of ERCOT /17/20041 RTCA, CAM, and SFT Presented by: John Adams November 17, 2004.
ERCOT Operational Audit 2005 August 1 - August 19, 2005.
PMO Update to PRS Troy Anderson ERCOT Program Management Office December 17, 2009.
Managing Reliability and the Markets with PI
Page 1 TAC Program and Projects Update March 6, 2003.
Network Model Management System (NMMS)
COPS – ERCOT PROJECTS UPDATE WHOLESALE MARKET DEVELOPMENT Paula Feuerbacher February 22, 2005.
– 1Texas Nodal Texas Nodal ICCP Business Case By Jeyant Tamby, ERCOT.
July 10, 2008 ROS Early Delivery Systems Status – R6.3 2 Hour Test John Dumas and Jeff Gilbertson.
Lead from the front Texas Nodal 1 TPTF Update for TAC March 30, 2007 Trip Doggett.
Discuss Options to Improve Market Visibility to RTBES Presented by: Matt Mereness Friday, October 27, 2006.
1Texas Nodal Texas Nodal NMMS/RARF Data Discussion By John Moseley, ERCOT, Network Modeling Group.
August 25, 2008 TPTF Nodal Status Report: Integrated Schedule Update Change Control Update Adam Martinez Troy Anderson.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Load Frequency Control (LFC) Business Requirements Energy.
9/12/2006 TPTF MIS / Training Status & Update Pat Harris A portal is a web site or service that offers a broad array of resources and services such as.
September 21, Data Extract Projects Jackie Ashbaugh Commercial Operations Data Integrity & Administration September 21, 2006.
Current Operational Challenges Computing the West – North Limits Potential IROLs Local Voltage & Thermal issue (OOME) High Voltage Outages.
Scheduling and Operating Transmission Devices in the Nodal Environment.
Protocol Revision Subcommittee Rob Bevill January 5, 2012.
January 14, 2016 PacifiCorp-CAISO-NVE EIM Initiative Overview.
© Property of ERCOT EMMS Improvements Operations Review Group 11/17/04.
Texas Nodal 1 Nodal Operations Model Posting NATF Sep 29, 2009 Matt Mereness, ERCOT.
DC Tie Automation Project. Automation Project Objectives Automate Comparison of eTags to QSE DC Tie Schedules Automate Operator offsets for DC Tie eTag/Schedule.
Lead from the front Texas Nodal 1 Texas Nodal EDS 4 Early Delivery System Plan TPTF May 22 nd, 2007.
Lead from the front Texas Nodal 1 Current Telemetry Dashboards NDSWG March 24, 2009.
Lead from the front Texas Nodal 1 Integrated ERCOT Readiness and Transition (IRT) TPTF – December 4 th, 2006 ERCOT Qualification.
09/20/20061 RTCA, CAM, and SFT Presented by: John Dumas September 20, 2006.
Real Time Balancing (RTB) & Resource Plan Statuses Change to the QSE practice of showing offline units as online and available ERCOT Presentation to ROS.
Lead from the front Texas Nodal 1 Texas Nodal EDS Market Trials Approach Wednesday, November 29, 2006.
1 Compliance Update April Control Performance Highlights  NERC CPS1 Performance Performance further declined in March  March performance comparison.
Transition Plan Network Operations Model Change Requests 5/26/2010.
07/27/2006 Overview of Replacement Reserve Procurement ERCOT Staff PRS RPRS Task Force.
1 TAC Report to the ERCOT Board July 18, TAC Summary 4 PRRs for approval (3 unanimous) 4 PRRs for approval (3 unanimous) 5 Nodal PRRs for approval.
ROS Meeting – 06/12/081Texas Nodal Program - TPTF Update Texas Nodal Transition Plan Task Force ROS Meeting Stacy Bridges, ERCOT Thursday, 06/12/08.
6/21/2007 TPTF: Baselines 1&2 WP and CI Baselines 1 and 2 White Papers and Change Items Diran Obadina.
Lead from the front Texas Nodal 1 Texas Nodal Energy & Market Management System EMS/MMS Projects Requirement Documents November.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee May 7, 2009.
EDS 2 Early Delivery Systems Approach March 2007.
NPRRs 815NPRR Revise the Limitation of Load Resources Providing Responsive Reserve (RRS) Service.  This Nodal Protocol Revision Request (NPRR) revises.
Phase Angle Limitations
ISO New England System R&D Needs
Texas Nodal Load Frequency Control (LFC) EDS 3 R6
Time-Based Management of Large Scale Network Models
Presentation transcript:

SO – CART Project Status Protocol Revision Subcommittee Update 2/23/06

Page 2 SO Projects  EMMS Release R4A  RAP-C Modeling Enhancements  Replace DSM6 High-Speed Frequency Recorder  RTCA Archiving  Performance Monitoring for SCADA / State Estimator  EMMS Software Upgrade - OSI PI, OAG  Satellite Communications for Black Start suppliers  EDW EMMS Extracts  Congestion Management Reports  Aggregation of Combined Cycle Units Providing RRS  SCE Performance and Monitoring  Additional SMP Front End  Incident Report  OTS System  CSC Thermal & Volt Limits Calculations/Posting  Outage Scheduler Enhancements Phase II  DC Tie Automation  Topology Estimation System Phase I  Network Model Management System (NMMS)  SCR 747 – Removal of Price Administration for Zonal Congestion  Market Notice of LaaR Proration  Breaker to Breaker One Lines/System Map  Improvements to VSA/DSA - Phase II  MOMS  EMS Upgrade  SCR 746 – Dynamic Rating Data to TSP Using ICCP Link  AIMMS 3.6 Completed or near completion New or Not Started Active (at least in Initiation)

Page 3 Completed or Near Completion  RAP-C Modeling Enhancements  Gives the ability to enter conditional RAPs  Checks the topology for the defined condition and provides an indication that the RAP will work if the contingency occurs  RTCA Archiving  Real-time Contingency Analysis data necessary for IROL, SOL & Congestion Management Reports  Performance Monitoring for SCADA/State Estimator  Automatically evaluate the redundancy & observability of the network  Monitors SCADA & SE performance  Replace DSM6 High-Speed Frequency Recorder  Monitors & Collects frequency disturbance data for PDCWG reports  Satellite Communication for Black Start Suppliers  Provides the ability to communicate via satellite phone during a system blackout or emergency situation  EMMS Software Upgrade – OSI PI, OAG  Upgrade to a more supportable version of ICCP  EMMS Release R4A  PRR342 PRR359 PRR413 PRR422 PRR485  Enhanced the OOM tool  Provided more real-time update of the resource plan  Replacement is nearing completion  AS Simultaneous Selection

Page 4 Active (at least in Initiation)  Congestion Management Reports  PRR 492, PRR 515  RTCA Archiving provides the data and this project represents the reporting and user interface  Reports will be used for identifying overloads and re-occurring congestion  Aggregation of Combine Cycle  PRR 502, OGR 149  Counts responsive reserve on the entire train instead of individual units  SCE Performance and Monitoring  PRR 525  Implemented sending EMS values to QSEs  Enhancements to the EDW reporting function near completion  Additional SMP Front End  Provides QSE RTU connection  Provides capacity for new QSE requests (Currently near capacity)  Incident Report  Automates the ability of the operator to generate a compliance violation and route to the appropriate management  OTS System (Operator Training Simulator)  Training that can be applied toward operator certification hour requirements  Ability to train on scenarios for historical and or new events  CSC Thermal & Volt Limits Calculation/Posting  Automates the process of calculating CSC limits  Incorporates a 24 hour load study rather than a manual peak hour study

Page 5 Active (at least in Initiation)  Outage Scheduler Enhancements Phase II  PRR 425  Validate TO input data  Introduce tracking of outage schedule changes  DC Tie Automation  Automate Comparison of eTags to QSE DC Tie Schedules  Automate Operator offsets for DC Tie eTag/Schedule mismatches  Monitor/compare eTag Net Scheduled Interchange to DC Tie SCADA on EMS Display  Automate Inadvertent Energy Accounting  Topology Estimation System Phase I  Identify incorrect switching device status  Proof of concept  Pave the way for system integration and nodal requirements  EDW EMMS Extracts  Transition to new data archive  Network Model Management System (NMMS)  Improve Planning and Operational model consistency  Improve data submittal interface between ERCOT and Market Participants  Improve links between the Model and Outage Scheduler

Page 6 New or Not Started  Market Notice of LaaR Proration  PRR 558  Before a floor of zero bid limit was established (negative bids were allowed)  Breaker to Breaker One Lines/System Map  NERC Audit stated that ERCOT needed a visual wide-area display to continually provide the operators with an overview of the entire ERCOT system  The ability to quickly trace flows & problems for a transmission element from one breaker to the next  Improvements to VSA/DSA – Phase II  Automates the data input necessary to include transient stability studies as part of the real-time sequence  SCR 747 – Removal of Price Administration for Zonal Congestion  Newly initiated project  MOMS  PUC Study SPD enhancements  EMS Upgrade  Current HW reaching its lifespan  ERCOT EMS current server and OS platform not compatible with AREVA roadmap  AREVA support philosophy on the “old versions” —No standard support for releases that are either 4 years old or two releases behind  New functionality and applications to support Market Redisgn  Security enhancements in the new AREVA development  SCR 746 Dynamic Rating Data to TSP Using ICCP Link  AIMMS 3.6  Necessary for MOMS and ERCOT Market System  AVR Validation  NERC Audit Item

Page 7 Integration & Resource Constraints  Single ITEST Environment for all EMS Changes  Approximately 200 SIRs (MOS,POS & Portal)  Weekly Database Loads  Market Redesign effort