PACS IQR 13 Jan 2005 First Assessment1 The PI’s Self-Assessment A. Poglitsch.

Slides:



Advertisements
Similar presentations
Leicester SRC, 3-5 Dec 2007 Systems engineering at detector level Tim Stevenson.
Advertisements

PACS IIDR, Noordwijk 1-2 Mar 2001 Chopper R. Hofferbert D. Lemke, U. Grözinger, O. Krause, U. Klaas J. Katzer (ZEISS) Max-Planck-Institut für Astronomie,
PACS IQR Kick-off ESTEC, 13 Jan 2005 PACS Management, …1 PACS Management, Funding and Schedule Otto H. Bauer MPE Garching.
1 GAIA System Level Technical Reassessment Study Final Presentation ESTEC, April 23rd 2002 Part 1b Development & AIV.
PACS IHDR, Garching 12/13 Nov 2003 Chopper R. Hofferbert D. Lemke, U. Grözinger, O. Krause, A. Böhm, A. Bohm (Hardware) R. Vavrek, U. Klaas (ICC) J. Katzer,
PACS IBDR 27/28 Feb 2002 Herschel PACS SPU - IAC1 Herschel PACS - IBDR SIGNAL PROCESSING UNIT - SPU - HW Unit, Start-up SW and Low-level SW Drivers José.
PACS IIDR 01/02 Mar 2001 Herschel PACS SPU - IAC1 Herschel PACS - IIDR SIGNAL PROCESSING UNIT (SPU) HW Unit, Start-up SW and Low-level SW Drivers José.
Chapter 2- Software Process Lecture 4. Software Engineering We have specified the problem domain – industrial strength software – Besides delivering the.
MIRI EC Meeting C/D13, Dublin, 17 th to 19 th September JWST Status.
SPP FIELDS DFB Quarterly June 2014 Solar Probe Plus FIELDS Instrument Quarterly Digital Fields Board 1.
PACS IBDR 27/28 February 2002 PACS DEC/MEC1 Detectors & Mechanisms Controllers (DEC/MEC) J.-M. Gillis Centre Spatial de Liège (B)
PACS IHDR MPE 12/13 November 2003 AIV 1 PACS IHDR Integration, Qualification and Testing Reinhard Katterloher.
PACS IBDR 27/ BOLC/BOLA1 BOLC / BOLA SAp/DAPNIA/DSM/CEA C. CARA WE Design Team: A. BOUERE - N. DEVIN - G. DHENAIN - E. DOUMAYROU M. SEYRANIAN -
PACS IBDR 27/28 Feb 2002 SPU High Level Software1 H. Bischof, A.N. Belbachir (TUVIE) F. Kerschbaum, R. Ottensamer, P. Reegen, C. Reimers (UVIE)
PACS SVR22/23 June 2006 PACS Thermal Behaviour1 PACS Thermal Behaviour Tests T. Müller, H. Feuchtgruber, A. Contursi, Cs. Kiss, Sz. Csizmadia.
ASPERA-3 Sep. 25, 00 Monthly Status Report ASPERA Monthly Status ReportMonthly 9_25/ Page 1 Monthly Status Report Report due 9/25/00 Schedule statused.
August 2 and 3, 2010 Project Cost, Schedule, Risk and Contingency Jay Elias.
2007 CMBG Conference David Hembree Institute of Nuclear Power Operations June 20, 2007 Charleston, SC INPO Perspective on Configuration Management.
PACS IIDR 01/02 Mar 2001 Instrument Interfaces1 PACS FPU Opto-mechanical Design Overview and Interfaces J. Schubert MPE.
 CS 5380 Software Engineering Chapter 8 Testing.
PACS IIDR 01/02 Mar 2001 PACS  -ISVR 1  -ISVR Recommendations Introduction and Close-out A. Poglitsch.
PACS IQR 13 Jan 2005 PACS OBSW1/33 PACS On-board Software & User Manual A. Belbachir (UVIE/TUVIE, SPU) H. Feuchtgruber (MPE, SE) A. Mazy (CSL, DMC) S.
COROTWEEK n°8 Toulouse May the 24th, 2005 Program Status (Th. Lam-Trong) 1 COROT.
PACS IQR 13 Jan 2005 IHDR Close-out1 Close-out of IHDR: Concerns / Recommendations A. Poglitsch.
Rev. 0 CONFIDENTIAL Mod.19 02/00 Rev.2 Mobile Terminals S.p.A. Trieste Author: M.Fragiacomo, D.Protti, M.Torelli 31 Project Idea Feasibility.
PACS IBDR 27/28 Feb 2002 IIDR Close-out1 Close-out of IIDR Recommendations A. Poglitsch.
PACS IHDR 12/13 Nov 2003 IBDR Close-out1 Close-out of IBDR Recommendations A. Poglitsch.
PACS IQR ESTEC, 13 Jan 2005 Documentation1 G. Wildgruber MPE Garching Introduction to Documentation - CQM/AVM EIDP and IQR-
PACS SVR 2 18 Jan 2007 FM ILT: Mechanisms1 FM ILT Results: Mechanisms H. Feuchtgruber, H. Dannerbauer, N. Geis, C. Hartinger, U. Klaas, P. Royer.
PACS SVR 22/23 June 2006 PACS FPU Subunits1 FM FPU Subunits A. Poglitsch.
PACS SVR-II 18 January 2007 FM ILT overview1 The PACS FM ILT Phase I overview on actual test execution and analysis Eckhard Sturm MPE.
PACS IQR ESTEC 13 January 2005 Mech Qual Status 1 PACS IQR Mechanical Qualification Status and Plans for PFM Reinhard Katterloher R. Graue, D. Kampf, R.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Herschel/Planck January 13, 2005PACS IQR - SCI-PT/ ggonzale: Herschel PACS Instrument Qualification Review Review Objectives and Organisation G.Crone/G.Pilbratt.
PACS IIDR ESTEC 01/02 March 2001 OGSE 1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher OGSE.
PACS IBDR 27/28 Feb 2002 PACS Data Flow1 PACS Data Flow, Instrument Modes and Operations Helmut Feuchtgruber MPE.
PACS IBDR 27/28 Feb 2002 PACS PI Summary1 Where we are and where to go… A. Poglitsch MPE.
® SD 2000 INTEL SUPPLIER DAY 2000 SD 2000 INTEL SUPPLIER DAY 2000 Agility & Internet Speed Supplier wishes to Qualify New or Changed Product.
PACS IIDR ESTEC 01/02 March 2001 System Engineering 1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher System Engineering DDVP, Model.
PACS SVR 2 18 Jan 2007 FM ILT: Spectrometer1 Spectrometer Performance H. Feuchtgruber, T. Müller, A. Poglitsch.
Solar Probe Plus FIELDS DFB Report Quarterly Management July 18, 2013.
PACS IHDR MPE 12/13 November 2003 System Engineering 1 PACS IHDR Model Philosophy, Budgets, Interfaces and IID-B Reinhard Katterloher.
PACS IQR13 Jan 2005 Warm Electronics Qualification Status1 Martin von Berg PACS IQR.
PACS IHDR MPE, 12/13 Nov 2003 Overall Schedule1 Otto H. Bauer MPE Garching.
PACS IBDR 27/28 Feb 2002 Digital Processing Unit1/16 DPU PRESENTATION R.Orfei & S. Pezzuto CNR- IFSI.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
PACS IBDR 27/28 Feb 2002 OBSW Simulation1 PACS OBSW Simulation/Test A.Mazy (CSL), S.Pezzuto (IFSI), A.N.Belbachir (TUVIE), H. Feuchtgruber (MPE)
Goddard Space Flight Center Cryogenics and Fluids Branch Status of the AMS-02 Cryocooler January 2007 TIM.
Solar Probe Plus Fluxgate Magnetometer QSR – Oct SPF MAG Quarterly Report – Oct 2014 The MAG EM1 (EQM) (board and frame at right) was successfully.
PACS SVR 22/23 June 2006 Test Campaigns1 Overview of PACS Test Campaigns Helmut Feuchtgruber MPE.
PACS IIDR ESTEC 01/02 March 2001 Integration and Testing1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher Integration and Testing.
1DSM/DAPNIA/SAp – J. MartignacPACS - IHDR - MPE – Nov. 12 – 13, 2003 PACS – IHDR PhFPU Design J. Martignac CEA/DSM/DAPNIA Service d’Astrophysique.
PACS IBDR MPE 27/28 Feb 2002 System Engineering 1 PACS IBDR Model Philosophy / Development Plan Reinhard Katterloher.
Herschel EQM – Results and Lessons Learnt6/7 Feb 2006 PACS Overall Analysis1 Overall PACS EQM IMT Analysis Contributions by PACS ICC.
February Monthly Status Review (MSR) Note: No presentation this month
PACS SVR22/23 June 2006 Warm Electronics1 Warm Electronics: Components/Subsystems Test Results B. Voss PACS SVR.
PACS IBDR MPE 27/28 Feb 2002 AIV 1 PACS IBDR Test Cryostat and OGSE Gerd Jakob MPE.
Welcome to Software Project Management. CONVENTIONAL SOFTWARE MANAGEMENT The BEST and WORST thing about software is its flexibility. 1.Software development.
PACS IHDR12/13 Nov 2003 Warm Electronics1 Warm Electronics: Overview, Interfaces, Grounding and EMC Martin von Berg PACS IHDR.
PACS IIDR 01/02 Mar 2001 PACS Grounding Scheme and EMC1 Grounding Scheme and EMC Matthias Rumitz, MPE.
1 The next steps – focusing points Define the scope, strategy and cost of the project implementation. Main input: The evolution of the physics findings.
PACS IHDR 12/13 Nov 2003 Digital Processing Unit1/15 DPU PRESENTATION R.Orfei & S. Pezzuto CNR- IFSI.
PACS IQR Kick-off ESTEC, 13 Jan 2005 PA/QA Status1 O.H. Bauer MPE Garching PA/QA Status.
SPP FIELDS DFB Quarterly November 21, 2014 Solar Probe Plus FIELDS Instrument Quarterly Digital Fields Board (DFB) 1.
7th Belle II VXD Workshop, Prague
Proton Source and LEBT Luigi Celona & Lorenzo Neri
Peer Review Agenda (Suggested).
Nov. 19, 2009 prepared by H. Matsuhara, N. Takahashi, T. Nakagawa
Schedule (Major Deliverables and Milestones)
Presentation transcript:

PACS IQR 13 Jan 2005 First Assessment1 The PI’s Self-Assessment A. Poglitsch

PACS IQR 13 Jan 2005 First Assessment2 Achievements PACS integrated FPU mechanical/thermal/optical qualification/performance verified (with some understood exceptions) –Subunits function/perform as expected after integration –Remaining open issues are concrete, isolated problems that can be solved Almost all S/C interfaces settled, budgets (mass, electrical power, thermal power) stable PACS system operability (FPU + WE/OBSW + OGSE + EGSE) demonstrated Test & calibration plan + use of IA/QLA shown viable

PACS IQR 13 Jan 2005 First Assessment3 The Schedule and Its Consequences Several subunits on critical path (detectors, DECMEC, DPU?) Some modifications of FM subunits and OGSE mandatory No margin 6 month of FM ILT minimum Delivery on official need date (Nov 2005) impossible  Project will have to find ways to accommodate FM delivery in March 2006 – no recovery in sight

PACS IQR 13 Jan 2005 First Assessment4 PACS Areas of Concern Warm Electronics + OBSW Late qualification / late delivery of QM/FM units System stability / frequent crashes (H/W? S/W?) Potentially insufficient autonomy functions –If system stabilty does not improve dramatically then better recovery scheme needed –Improper commanding can damage FPU H/W DPU: Burst mode not working with CDMU SPU: Memory corruption; insufficient compression with reasonable CPU load BOLC: No immunity to uncontrolled power loss DECMEC: FPGA overheating, link losses; performance and operability still need to be demonstrated. Grounding scheme still open

PACS IQR 13 Jan 2005 First Assessment5 PACS Areas of Concern Photoconductor/readout performance –Required sensitivity not demonstrated yet –“FS” CREs to be used with FM detectors show promising performance, but measurements with detectors still missing Bolometer performance –QM bolometer performance insufficient –FM bolometer performance at subarray level probably ok –Performance at PhFPU level to be demonstrated, yet OGSE performance –Reproducibility of alignment –Scale/focus error

PACS IQR 13 Jan 2005 First Assessment6 PACS Areas of Concern Late availability of ILT analysis in some areas –There may be yet unidentified problems that could surface too late to be addressed in the final H/W implementation Lack of resources in some partner institutes to address known problems in time L0 interface as provided by industry for EQM tests and as foreseen for FM is incompatible with PACS requirements H field susceptibility – photometer performance could be seriously compromised

PACS IQR 13 Jan 2005 First Assessment7 Future Strategy Optimise/prioritise implementation of changes to H/W Improve reviewing/monitoring of subunit progress by PACS System Engineering –H/W + S/W –Subunits must be delivered fully tested Optimise FM ILT planning –Early execution and timely analysis of tests needed for performance verification Keep planning flexible to accomodate any adjustment in S/C schedule –Work towards open exchange on schedule between all involved parties –Extension of ILTs should always be possible/welcome