WBS: Lowest level OBS: Lowest level
Advertisements

TIME MANAGEMENT 641 Topic 03 Activity Sequencing.
Estimating, scheduling and budgeting
IX- CONSTRUCTION PLANNING
Estimating & Tendering. Estimating work involves dealing with Measurements and quantities Pricing and rates Subcontract packages Tender preparation.
THE HIERARCHY OF SCHEDULES. DR. Nabil Dmaidi 1. Materials Need to determine – Quantities takeoff – Availability and probable delivery time – Type of materials.
Planning PERT - Project Evaluation and Review Technique) and CPM - Critical Path Method are network analysis techniques that are commonly used in project.
 Chapter 6: Activity Planning – Part 1 NET481: Project Management Afnan Albahli.
1 Lecture by Junaid Arshad Department of Engineering Management Abridged and adapted by A. M. Al-Araki, sept WBS: Lowest level OBS: Lowest level.
Design C a s t i n g E r e c t i o n F i n a l S t r u c t u r e D e s i g n C o n s t r u c t i o n P r o c e s s P r e–c a s t C o n c r e t e 3D M o.
Scheduling. Putting the activities in chronological order –Chicken or the egg Allows the PM to determine the time required to complete a project.
Planning & Monitoring. The Purpose of Planning and Monitoring To ensure that the project is produced on time, within the cost constraints and at the quality.
Degree and Graduation Seminar Scope Management
Teaching Project Management Mauricio Gonzalez (M.Sc) Frederick Douglass Academy, NYC Roy B. Melton, Purdue University 2010.
Roberta Russell & Bernard W. Taylor, III
Time Management Ahmed Awad, Ph.D., PMP. Time Management It includes the processes required to ensure timely completion of the project. b Activity Definition.
Project Management and Scheduling
Topic 7: Timber Subfloor Systems – Basic
Professional Development Programs
Dr. Godfried Williams1 Project Management – Topic 6 Lecture Content Planning Tools/Techniques Optimization Techniques Resource Planning & Allocation Linear.
Introduction The Gamma Bracing System  Gamma bracing system is a light weight steel, structural truss bracing frame that fits INSIDE the timber studs.
Department of Industrial Engineering 1 Project Management Kim LaScola Needy, Ph.D., P.E., CFPIM University of Pittsburgh 1041 Benedum Hall Pittsburgh,
EGNR 300 Project Management Planning & Scheduling ENGR 300 Dept. of Computer Science and Engineering University of Bridgeport,
ELEMENTAL COST ANALYSIS (ECA)
1 Project Planning Faculty of Applied Engineering and Urban Planning Civil Engineering Department Week 4 2 nd Semester 2008/2009 UP Copyrights 2008 Construction.
Project Time Con trol. Control = Monitor + Compare + Analysis + Action  Definition: Controlling  Controlling involves making sure that the results achieved.
Objectives 4 Understand the basic concepts of project planning and control 4 Explain PERT and Timeline (Gantt) charts.
Work Systems and the Methods, Measurement, and Management of Work by Mikell P. Groover, ISBN ©2007 Pearson Education, Inc., Upper Saddle.
Estimating Activity Duration Time Interval –Time Interval is selected according to the nature of the activity (seconds - minutes …) –It is common practice.
11/9/2015 9:42 AM 1 Project Time Control. 11/9/2015 9:42 AM 2  Controlling involves making sure that the results achieved are in line with the planned.
12/2/2015 2:45 AM 1 PROJECT TIME PLANNING Process and Bar Chart Technique.
PROJECT PLANNING AND SCHEDULLING
Project management Topic 2 Planning.
Construction Coordination BIM Curriculum 06. Topics  Problems of the Construction Industry  Objectives  The Virtual Construction Model  Benefits.
1 EASTERN MEDITERRANEAN UNIVERSITY FACULTY OF ENGINEERING DEPARTMENT OF CIVIL ENGINEERING CIVL 493 Construction Management Assoc. Prof. Dr. Ibrahim YITMEN.
GROUPAMA Football Stadium, Budapest Design and other engineering work for the precast concrete structure Precast solution of the structure (splitting.
Model-based Estimating Olli Seppänen Professor of Practice Operations Management in Construction Department of Civil and Structural Engineering.
Week 6 Timber based columns
McGraw-Hill/Irwin Copyright © 2011 The McGraw-Hill Companies, All Rights Reserved Chapter 10 Projects.
(M) Chapter 12 MANGT 662 (A): Procurement, Logistics and Supply Chain Design Purchasing and Supply Chain Analysis (1/2)
3.0 DESIGN PROCESS FOR THE PROPOSED PROJECT 3.1 TIME PLANNING Now, having understanding the Project Management in general and its strategy in the project.
Programming Taija Puolitaival, Department of Construction, Unitec 2014.
Estimating and Scheduling CEE 492
Project Management Planning and Scheduling. “Failing to plan is planning to fail” by J. Hinze, Construction Planning and Scheduling Planning: “what” is.
A Brief intro to Project Management What can it do for you
Project Management – PTM721S
Training processes for extension education
Business Decision Making
TOPIC-8A- PROJECT TIME CONTROL
Construction Project Management
Activity Planning.
ENGINEERING MANAGEMENT (GE 404)
PLANNING RESOURCES 1. Materials Need to determine 2. Equipment
ENGINEERING MANAGEMENT (GE 404)
PLANNING ENGINEERING AND PROJECT MANAGEMENT
Weather and Contingency Allowance
Project Scheduling Basics Activity on Node Precedence Diagrams
PLANNING ENGINEERING AND PROJECT MANAGEMENT
THE HIERARCHY OF SCHEDULES
Chapter 6 Activity Planning.
Resource Planning, Cost Estimation and Budgeting
ESTIMATION Estimation is the scientific way of working out the approximate cost of an engineering project before execution of the work. It is totally different.
Part 1: Designing the Experiment My Question:
In-Class Scheduling Exercise
Introduction The Gamma Bracing System
ENGINEERING MANAGEMENT (GE 404)
FACULTY OF ENGINEERING CONSTRUCTION AND BUILDING DEPARTMENT
CHAPTER ONE: RESOURCE ALLOCATION AND SCHEDULING
Introduction The Gamma Bracing System
Presentation transcript:

G’Day! Stefan Hörnlund University of South Australia

Planning ahead

Learning Objectives After this lecture you should be able to; explain why we need to plan for the completion of a building project break down a project into a number of activities prepare a chart (precedence diagram) showing how these activities relate to each other, i.e. that some must be completed in a certain order whilst others can be carried out independently list some of the many considerations that the planner must take into account

Why do project planning? To achieve a stated objective in the way best suited to the particular project. To estimate what resources, like materials and labour, are needed and when they are needed. To provide a method of measuring and comparing actual progress with what was planned. To foresee problems and prepare for them.

Planning versus Control Planning decisions set the objectives to be accomplished and an agreed program of the activities required to accomplish that objective. In other words - we must do A, B and C etc to achieve our objective. Control decisions check the accomplishment of the activities and the agreed procedure for further activities or even changes to the objective, if the outcome of each activity is not in accordance with the planning decisions already made.

Constructability Constructability is the optimum integration of construction knowledge and experience in planning, engineering, procurement and field operations to achieve overall project objectives. ( CII 1983 )

No Door?

List of activities for a ‘Project’ A. Getting up B. Going to the bathroom C. Getting dressed D. Making breakfast E. Collecting the newspaper F. Eating breakfast G. Reading the paper H. Washing up I. Get briefcase J. Leave and lock door

Precedence diagram A B C D E F G H I J

Who does the planning? Senior management Client organization Estimating department Design team Site management team Subcontractors

Construction Description or Work List -Describe your activities -State any assumptions made

Method statement Method study techniques

Erection of timber framed partitions in two-storey blocks of units. Framing material: Timber x mm. Activity content Starting point: Material in materials storage area Content: Transportation Erection of frame including bottom plate, studs, top plate and noggins. Finishing point: Frame ready for cladding Work time Accumulated work time (t) in hours/m2 for 5000 m2 wall area Average area (m2) of each panel Transportation of materials Erection of frames with studs at centres: 0.4 m m m Quantity of work Correction factors for work time at different total quantity of work Quantity of work (m2) Correction factor Slower Faster

Learning curve Time/unit Number of units

Special considerations Small site Geotechnical problems Remote location etc

Activities networks Precedence network A B C D E F G Arrow & Node network

Barchart Activity Day Excavation Formwork Reinforcing Concreting Curing Form stripping

Heartbeat diagram Activity Day Excavation Formwork Reinforcing Concreting Curing Form stripping

Calendar 2007 March April Activity M T W T F S S M T W T F S S M T W T F S S A H B O C L D I E D F A Y

Linked Barchart (Gantt chart) ABCDEABCDE

Activity Draw a bar chart based on the following information Activity Duration (days) Depends on A 5 Can start immediately B 5 A C 12 A D 3 C E 6 B and 2/3 of C F 8 B and 2/3 of C G 14 A H 5 D, E, F and G

Solution A B C D E F G H