Design skills Site analysis

Slides:



Advertisements
Similar presentations
Mississippi Chapter – American Society of Landscape Architects 2006 Awards Program Walnut Square and Walnut Circle Public Design Project Name: Project.
Advertisements

Renewable Energy Louise Dolan Giuseppe Genovese Haruka Kobayashi Rita Costa,
Civil Society Summit on Urban Renewal DISTRICT-BASED URBAN RENEWAL METHODOLOGY Presented By: HO Man Yiu Ivan.
February 10, 2010 Sarasota Memorial Health Care System Management Council February 10, 2010.
WHAT MAKES A PLACE SPECIAL? Newtown exercise. Note  These outputs reflect the discussion at the seminar  The responses are those of the participating.
PLACECHECK AND ENGAGEMENT. WARREN LEVER – URBAN DESIGNER Borough of Poole.
Future London Leaders Project Tracker Round Table Event 27 th January 2011.
Also known as manufacturing industries
RENOVATION & ADDITION OPTIONS TORONTO DISTRICT SCHOOL BOARD NORTH TORONTO COLLEGIATE INSTITUTE REDEVELOPMENT STUDY.
Inspiration: Historical MED buildings on site to be retained; The recreational, amenity, ecological and cultural values of the Avon corridor; and The historic.
Urban Design PrinCIPLes UrbAn DeSigN Done By : Majed Al-madhoun 2010.
Expect More !. Woodland Heights Rajapura (Jigani - Bommasandara Road), Bangalore.
ArchSD ARCHITECTURAL SERVICES DEPARTMENT Case Study Project Data Wetland Park Visitor Centre (Phase I) Project Cost (Phase I) $16M Site Area (Phase I)
WJEC (B) GCSE Geography Theme 1 Topic 4 Click to continue Hodder Education Revision Lessons Changing housing and service provision in more developed countries.
MTF Rail Development Forum
CONSTRUCTION. Construction Systems –Early people lived in caves or in the brush --- teepees from animal hides were used –Wood, stone, mud and straw were.
Design skills Computer aided design (CAD). As illustrated through the Aquatics Centre by Zaha Hadid Architects. Inspired by Design © Zaha Hadid Architects.
Module 6/7: DPR (Detailed Project Report) & EPC (Engineering Procurement Construction)
Cit CREATING PLACE a library without books inside/out City Lounge St Gallen Switzerland.
Your trip to New York {School Name Here}, Years {7 & 8}
Operational Assets - Property, Plant, and Equipment Chapter 10 Kieso, Weygandt, Warfield.
WHO WANTS TO BE A MILLIONAIRE?
URBAN LAND-USE.
Integration at the urban and the architectural scale
Book Reference : Pages To understand how electricity is distributed in the UK via the National Grid 2.To understand how transformers are used.
Shireen Abdelrahman Lecture 5. Individual development projects - new construction, expansion, or renovation - can affect the surrounding environment in.
Skills Section 1.OS Maps 2.Aerial Photographs 3.Graphs This appears throughout all sections of the exam paper but particular emphasis on settlement (human.
DAMBOVITA COUNTY COUNCIL MODERNIZATION OF S.C. MORENI INDUSTRIAL PARK S.A. Local initiative. Regional development.
Title Sub-title PLACE PARTNER’S LOGO HERE European Commission Enterprise and Industry Craiova City CHUMS Changing Habits for Urban Mobility Solutions Gabriel.
ThyssenKrupp Permanent Bridges Elevated steel constructions and Stadium roofs System Bridges (auxiliary bridges) Architectural buildings, Turn-key constructions,
Sport And Urban Regeneration. The Commonwealth Games; 2002 In 1995, Manchester was awarded the 2002 Commonwealth Games. It also made an unsuccessful bid.
Chapter 46 Commercial Construction Projects. 2 Links for Chapter 46 Types of Drawings Floor Plans Elevations Site Plans.
Glasgow 2014 Commonwealth Games Village Forbes Barron Head of Planning and Building Control Glasgow City Council.
Chapter 10 Architectural Design. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Distinguish.
Japan Visit: 6-13 January 2002 Paul M. Grant Potential Electric Power Applications for MgB 2 Paul M. Grant Science Fellow EPRI.
Chapter 16 Site Preparation. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Identify tasks required.
Design journeys Velodrome. © Antony Palmer Inspired by Design.
1 2001: WTP Construction Began. 2 WTP in 2015 Pretreatment Facility High-Level Waste Facility Low-Activity Waste Facility Analytical Lab.
Fraser Group  Singapore Top 3 leading developer  Market Capitalisation of AUD$13.7 billion  Residential Commercial Hospitality.
By Marsailli and Katy. Olympic and Paralympic Swimming. Some of the things you can do in the aquatic centre are Diving, Modern Pentathlon Swimming and.
By : Takalynn Ellis. The London bridge was built by the Romans around A.D. 50. It was the first bride built on Thames river. The London bridge is a busy.
Fabrik are an award winning landscape design practice working from studios in Alton, London and Manchester on projects in the United Kingdom and abroad.
How Green Technology is Being Used Chris B, Chris T, Kenny, Vera, and Dimitri.
Natural Sciences and Technology Grade 5 Term 3: Energy and Change Mains Electricity (PPT 2)
Summer Olympics General Information Takes place every 4 years Last summer Olympics were in Beijing (2008) 43 different sports have been part of.
Though while when who which where who which where 2. Then, continue the sentence using a word next to the first one 1. Start from the left of the board.
SITE/PLOT PLANS APPLICATIONS OF TECHNOLOGY. DESIGNING A BUILDING ON A SITE Architects must consider the following about a site when designing a building.
MIC..... Architect ( Member ) Dr.Swe Swe Aye U Sun Oo U Khin Maung Maung Daw Htoo Htoo Ngwe Daw Hlaing Maw Oo.
NATIONAL COMPANY INDUSTRIAL ZONES Partner for Investors in Bulgaria.
Olympic Heritage London hosted the 1908 and 1948 Olympic Games.
PowerPoint Presentation
Development Control/ Planning Control
ARCHITECTURAL DRAWINGS
What do I need to know? What is sustainable development?
Electricity is produced at the power station.
Industrial Parks Revitalization Programme Presented to the Portfolio Committee on Trade and Industry 12 April
WJEC GCSE in Geography Place.
AR-315 BUILDING CODES & BYE LAWS
Architectural Site Analysis
PAPER 2: Challenges in the human environment
Your New York Tour {Year}
Commercial Construction Projects
Voinova Julia.
Location Plans & Site Plans
Nanaimo Old City Association
Geographical Skills Gathering Techniques.
Neighbourhood Plans What is a Neighbourhood Plan?
With funding from the Appalachian Regional Commission
Design Charrette and Detailing
What is Site plan and Site Plan Rendering Service Linesgraph.
Presentation transcript:

Design skills Site analysis

© NORD Architecture For further information about substations visit: http://en.wikipedia.org/wiki/Electrical_substation As illustrated through the Olympic Park electricity substation by NORD Architecture Inspired by Design

© NORD Architecture Teachers’ notes: Gathering maps and site plans is one of the first things an architect does. You could discuss the reasons why with your students. Aerial photos are also very useful – use Google Earth to help students find their school and analyse the surrounding area via different views. The primary substation was the first building to be completed on the Olympic Park – the brief was to create a permanent building which would inspire the design of other utility buildings on an old industrial site. Inspired by Design

© NORD Architecture Teachers’ notes: diagrams are helpful when working out how a site functions. Provide pens and paper so your students can do the same. You could ask them to make a memory map and illustrate the school and other landmark buildings in the local area, before adding more layers of information such as transport routes etc. As part of the utilities infrastructure, around 50 pylons were removed from the site and all cabling routed underground. The cabling now connects to the King’s Yard substation via a basement within the building, providing electricity across the Olympic Park and beyond. Inspired by Design

© NORD Architecture Existing buildings had not been demolished when the project began – as part of their analysis NORD visited the site to record and photograph these old warehouses. The architects wanted to respond to this industrial heritage. They decided to design a substation with ‘weight’ which would have its own identity next to the temporary venues due to be built later. Inspired by Design

© NORD Architecture The architects gathered all the site information (dimensions and detail about boundaries such as roads and railways) and created a 70m long building which sits proudly on site. As the building isn’t a venue for London 2012 visitors (it contains plant and equipment) most people will experience it from a distance. The architects therefore wanted the building to work as a sculptural form. Inspired by Design

© NORD Architecture The massing of the substation responded to the proposal for the neighbouring Energy Centre and land bridge. The towers are different heights due to restrictions of a viewing corridor. The substation will ultimately have a green roof to help its sustainability performance and appearance on site. Teachers’ notes: ask students to discuss how the buildings work together e.g. the bottom layer in both (shown in mid grey) follow the same height. Inspired by Design

© NORD Architecture The architects were keen to use brick – to reference the old warehouses and to help make the building look permanent on site. They researched other brick buildings and liked the black brick used in streetscapes. Inspired by Design

© NORD Architecture Perforated Decorative Traditional They tested different forms and patterns for the black brick work – in a lattice bond design. The 3 layers are illustrated here. Inspired by Design

© NORD Architecture Teachers’ notes: there are 20,000 perforations and the 130,000 bricks took 14 brick layers to construct. You can ask students to guess the number of bricks used before revealing the answer. The open pattern of the bricks allows for ventilation across the cooling towers and for illumination at night. Inspired by Design

The completed building looks ‘heavy’ but dignified on the old industrial site. © Andrew Lee Inspired by Design

Your turn Take a sketchbook and camera out into your local area and record the buildings – think about their character and materiality. This will be useful for developing a portfolio of work to show at interview. www.architecture.com/inspiredbydesign