Network techniques for Project Management

Slides:



Advertisements
Similar presentations
Chapter 17 Project Management McGraw-Hill/Irwin
Advertisements

Chapter 13 Project Scheduling: PERT/CPM
F O U R T H E D I T I O N Project Management © The McGraw-Hill Companies, Inc., 2003 supplement 3 DAVIS AQUILANO CHASE PowerPoint Presentation by Charlie.
Operations Management Session 27: Project Management.
PROJECT MANAGEMENT CPM/PERT V P B Chakravarthi. K Abhijeet Kumar.
Terminology Project: Combination of activities that have to be carried out in a certain order Activity: Anything that uses up time and resources CPM: „Critical.
Scheduling the Project
Gantt Chart Graph or bar chart with a bar for each project activity that shows passage of time Provides visual display of project schedule Slack amount.
1 1 Slide © 2004 Thomson/South-Western Chapter 12 Project Scheduling: PERT/CPM n Project Scheduling with Known Activity Times n Project Scheduling with.
Project Scheduling Prof. Jiang Zhibin Dept. of IE, SJTU.
1 1 Slide © 2011 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole.
1 1 Slide © 2009 South-Western, a part of Cengage Learning Slides by John Loucks St. Edward’s University.
Project Scheduling: Networks, Duration Estimation, and Critical Path
Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall Day 15.
Other Scheduling Methods Dr. Ayham Jaaron Chapter 11.
1 1 Slide © 2008 Thomson South-Western. All Rights Reserved Slides by JOHN LOUCKS St. Edward’s University.
Chapter 10 Project Scheduling: PERT/CPM
In the name of Allah the Most Gracious the Most Merciful.
Chapter 7 Networks and Scheduling Project Management for Business, Engineering, and Technology.
5/18/2015 L. K. Gaafar PROJECT MANAGEMENT Time Management* Dr. L. K. Gaafar The American University in Cairo * This Presentation is Based on information.
Project Management Techniques.
BA 333 Operations Management
Project Management An interrelated set of activities with definite starting and ending points, which results in a unique outcome for a specific allocation.
Project Scheduling Professor Stephen Lawrence Leeds School of Business University of Colorado Boulder, CO
Project Management. Introduction What – Project Management Where – Where the success or failure of a project will have major consequences for the company.
Project Scheduling Professor Stephen Lawrence Graduate School of Business Administration University of Colorado Boulder, CO
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Project Time Management J. S. Chou, P.E., Ph.D.. 2 Activity Sequencing  Involves reviewing activities and determining dependencies.  A dependency or.
Project Management Chapter 13 OPS 370. Projects Project Management Five Phases 1. Initiation 2. Planning 3. Execution 4. Control 5. Closure.
MANA 705 DL © Sistema Universitario Ana G. Méndez, All rights reserved. W6 6.2 Operation Management Operation Management Managing Projects Techniques.
Project Time Management J. S. Chou, P.E., Ph.D.. 2 Activity Sequencing  Involves reviewing activities and determining dependencies.  A dependency or.
Copyright 2006 John Wiley & Sons, Inc. Project Management OPIM 310.
Network Planning Techniques Program Evaluation & Review Technique (PERT): Developed to manage the Polaris missile project Many tasks pushed the boundaries.
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Chapter 17 Project Management Part.
1 Project Planning, Scheduling and Control Project – a set of partially ordered, interrelated activities that must be completed to achieve a goal.
Project Management (專案管理)
Project Management Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill.
9-1 Chapter 9 Project Scheduling Chapter 9 Project Scheduling McGraw-Hill/Irwin Copyright © 2005 by The McGraw-Hill Companies, Inc. All rights reserved.
Chapter 8 Scheduling © 2012 John Wiley & Sons Inc.
8-1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Project Management Chapter 8.
PROJECT MANAGEMENT Approaches
PROJECT MANAGEMENT Approaches By- Rahul Jain. Plan your work first…..then work your plan.
Project Planning and Budgeting Recall the four stages Project Definition and Conceptualization Project Planning and Budgeting Project Execution and Control.
INDE 6332 ENGINEERING PROJECT MANAGEMENT SCHEDULING LECTURE 1 University of Houston Dept. of Industrial Engineering Houston, TX (713)
Chapter 7 – PERT, CPM and Critical Chain Operations Management by R. Dan Reid & Nada R. Sanders 4th Edition © Wiley 2010.
CPM – Critical Path Method Can normal task times be reduced? Is there an increase in direct costs? Additional manpower Additional machines Overtime, etc…
Chapter 7 : Risk Management – part 2
Chapter 4 MIS Project Management Lecturer Sihem Smida Sihem Smida Developing a project plan.
Chapter 16 – Project Management
PERT CPM assumes duration of activity is known with certainty.
PROJECT MANAGEMENT.
Project Management (專案管理)
Project Management Chapter Topics
UNIT II Scheduling Procedures & Techniques FLOAT
Chapter 17 Project Management McGraw-Hill/Irwin
Project Scheduling
Project Management (PERT/CPM) PREPARED BY CH. AVINASH
Course Title: Production and Operations Management Course Code: MGT 362 Course Book: Operations Management 10th Edition. By Jay Heizer & Barry Render.
2nd Task of Your Project „All you have to decide, is what to do with the time that is given to you.“ J.R.R. Tollkin Prof. Dr. Christian Bleis 1 Interaktionskompetenz.
Projects: Critical Paths
PROJECT MANAGEMENT WITH CPM/PERT.
Project Planning and Budgeting
Probabilistic Time Estimates
ENM448-Project Planning and Management
Chapter 16 – Project Management
PROJECT MANAGEMENT CPM/PERT V P B Chakravarthi. K Abhijeet Kumar.
Importance of Project Schedules
PERT Program Evaluation and Review Technique
PERT/Activity Diagrams, Completion Probability and the Z Score
Presentation transcript:

Network techniques for Project Management Meaning of Project & PM Basic Network techniques

Introduction to Project Management A temporary endeavour undertaken to create a unique product or service (PMI, 2004, P.5) Variety and unique in nature Mainly used for large R& D activities Project management mainly developed by military

Two basic Network techniques PERT an acronym for Program Evaluation Review Technique Originally developed to facilitate the planning and scheduling the Polaris Fleet Ballistic Missile project of US PERT is Probabilistic CPM an acronym for Critical Path Method developed in 1957 by the DuPont company in US to solve scheduling problems in industrial setting. CPM is concerned with the trade off between cost and time.

Definitions used in PERT CPM Activity: A time consuming task. An effort that require resources and take a certain time for completion i.e. designing a part, connecting a bridge girder Event: A milestone. Is a specific point in time indicating beginning or ending of one or more activities. Does not consume time or resources.

Rules for Network Construction Each activity must have a preceding and a succeeding event Each event should have a distinct number There should be no loops in project network Each activity is represented by a uniquely numbered arrow.

Example of PERT Activity Optimistic Most likely Pessimistic Te=ta+4tm+tb/6 Variance V=(b-a)/6 1-2 9 12 21 13 2 1-3 6 18 2-4 1 1.5 5 3-4 4 8.5 10 8 2-5 14 24 15 2.33 4-5 3 0.33 Draw the network diagram Determine critical path Calculate event slack and activity float Find the standard deviation of CP duration Compute the probability of completing the project in 25 weeks

PERT Analysis Uses 3 time estimates for each activity Optimistic time (a) Pessimistic time (b) Most likely time (m) These estimates are used to calculate an expected value and variance for each activity (based on the Beta distribution)

PERT Analysis Expected activity time (t) t = (a + 4m + b) 6 Variance = [ (b – a) / 6 ]2 Standard deviation = SQRT(variance) = (b – a)

Project Variance and STD Deviation Project variance (σp2) = ∑ (variances of all critical path activities) σp2 = 0.11 + 0.11 + 1.0 + 1.78 + 0.11 = 3.11 Project standard deviation (σp) = SQRT (Project variance) σp = SQRT ( 3.11) = 1.76

PERT Analysis Z = (Target time – expected time) σp 1.76 This means 16 weeks is 0.57 standard deviations above the mean of 15 weeks.

2 7 10 6 5 4 1 10 3 7 7 2 5 5 8 4 5

CPM Cost -Time Relationship Expediting projects Expediting activities requires additional resources, which means increasing the cost of the project. Slope gives us the cost increase associated with a reduction of one unit of the activity duration Slope =Cc-Cn/Tn-Tc

Example 1 Find the all normal schedule and cost Find the all-crash schedule and cost Find the least cost plan for all crash time schedule Find the least cost plan for an intermediate time schedule of 22 weeks. Activity Normal Crash Cost Slope Cc-Nc/Tn-Tc week Cost Week A 0-1 5 100 4 140 40 B 0-2 9 200 7 300 50 C 1-2 250 340 30 D 1-3 280 E 2-4 2 460 70 F 2-5 11 400 720 80 G 3-5 6 420 60 I 4-5 8

CPM Contd..all normal solution 0-1-2-4-5 is the critical path Duration=5+7+5+8=25 weeks. Cost=1860 D9 3 1 G6 H0 A5 C7 4 E5 I8 5 2 B9 F11

CPM Contd.. All crash solution 0-1-3-4-5 is the critical path Duration is 17 days Cost=2860 D7 3 1 H0 G4 A4 C4 4 I6 E2 5 B7 F7 2

Find the minimum cost for the Crash time 0-1-3-4-5 is the critical path Duration is 17 days Cost=2860 D7 3 1 H0 G4 A4 C4 4 I6 E2 5 B7 F7 2

Find the minimum cost for the Crash time Step 1- Get the non critical activities with their slope Step-2 Select the activity which has largest slope & expand as much as possible to achieve as a large a cost reduction is possible Step-3 Expand the next largest activity slope and continue until all path become critical. D 7 3 1 H 0 G 4 A 4 C 4 4 I 6 E 2 5 B 7 F 7 2

Find the minimum cost for the Crash time Step 1- Get the non critical activities with their slope =B-50 C-30,E-70,G-60,F-80 Step-2 Select the activity which has largest slope & expand as much as possible to achieve as a large a cost reduction is possible= Select F for 2 days expansion cost 160 Step-3 Expand the next largest activity slope and continue until all path become critical.=E one day is possible at$70 in similar manner G by 2 days cost 120 finally activity B can be expanded by one day “ $50 saving. So total cost savings are :160+70+120+50=400.Thus the revised cost for 17 days are 2860-400=$2460 D7 3 1 H0 G4 A4 C4 4 I6 E2 5 B7 F7 2

Determine the least cost plan for any desired number of days ie Least cost plan for 22 days First step is to list all critical activities and their slope The activity with the least slope will be compressed first, because decreasing the project time by one day will result in smallest increase in cost.in this case activity C & I can be selected, arbitrarily C is selected but how many days -the most is up to is crash time 4 days here. However such a reduction may create one or more additional critical path. The minute an additional CP is created, the compression should be stopped. Thus here C is reduced from 7 days to 4 days at a cost of 90.So the least cost plan for 22 days is 1860+90=1950 Critical activities Activities by events Slope A 0-1 40 C 1-2 30 E 2-4 70 I 4-5

Example2 The following data were obtained from a study of the time required to overhaul a small power plant. Find the all normal schedule and cost Find the all-crash schedule and cost Find the least cost plan for all crash time schedule Find the least cost plan for an intermediate time schedule of 17 weeks. Activity Crash Schedule Normal Schedule Week cost 1-2 3 6 5 4 1-3 1 2-4 7 10 3-4 2 2-6 4-6 9 11 4-5 6-7 5-7

Example2 Activity Crash Schedule Normal 1-2 3 6 5 4 1-3 1 2-4 7 10 3-4 2 2-6 4-6 9 11 4-5 6-7 5-7 The following data were obtained from a study of the time required to overhaul a small power plant. Find the all normal schedule and cost 1-2-6-7=16 ,1-2-4-6-7=31, 1-2-4-5-7=25,1-3-4-6-7=28,1-3-4-7=22 and cost= 4+4+6+2=16 Find the least cost plan for all crash time schedule Find the least cost plan for an intermediate time schedule of 17 weeks. 6 6 2 5 5 11 1 10 4 7 6 4 5 3 5 7

Example2 The following data were obtained from a study of the time required to overhaul a small power plant. Find the all crash schedule and cost 1-2-6-7=6 ,1-2-4-6-7=14, 1-2-4-5-7=13,1-3-4-6-7=9,1-3-4-5-7=8 and cost= 6+7+9+4= 26 Find the least cost plan for all crash time schedule Find the least cost plan for an intermediate time schedule of 17 weeks. Activity Crash Schedule Normal 1-2 3 6 5 4 1-3 1 2-4 7 10 3-4 2 2-6 4-6 9 11 4-5 6-7 5-7 6 2 2 1 3 5 1 5 4 7 4 1 1 3 5 2

Example2 Activity Crash Schedule Normal Schedule Slope Cc-nc/nt-ct 1-2 3 6 5 4 1 1-3 0.5 2-4 7 10 0.6 3-4 2 0.4 2-6 4-6 9 11 4-5 1.5 6-7 5-7 The following data were obtained from a study of the time required to overhaul a small power plant. Find the least cost plan for all crash time schedule. Find the least cost plan for an intermediate time schedule of 17 weeks. 6 6 2 5 5 11 1 10 4 7 6 4 5 3 5 7

Project Management Framework

P

Project Management Framework

Project Management Framework

Project Management Framework

Project Management Framework

Project Management Framework

Project Management Framework