Experimental tests of SA simulation Irene Fiori – Simulation Workshop – March 18, 2004 Virgo dataSiesta simulation 1. Inertial Damping simulation  test.

Slides:



Advertisements
Similar presentations
MSC recent activities virgoweek Cascina 4 Dec 2006.
Advertisements

Vibration Isolation Group R. Takahashi (ICRR)Chief T. Uchiyama (ICRR)Payload design H. Ishizaki (NAOJ)Prototype test R. DeSalvo (Caltech)SAS design A.
Status of the Virgo Commissioning G.Losurdo – INFN Firenze/Urbino for the Virgo Collaboration.
September 21, 2005Virgo Status – ESF Workshop1 Status of Virgo B. Mours.
Cascina, January 25th, Coupling of the IMC length noise into the recombined ITF output Raffaele Flaminio EGO and CNRS/IN2P3 Summary - Recombined.
One Arm Cavity M0 L1 L2 TM M0 L1 L2 TRIPLE QUAD 16m R = 20m, T=1% R = ∞, T=1%  Optimally coupled cavity (no mode matched light reflected back)  Finesse.
Takanori Sekiguchi Italy-Japan Workshop (19 April, 2013) Inverted Pendulum Control for KAGRA Seismic Attenuation System 1 D2, Institute for Cosmic Ray.
Payload design methods versus modeling E. Majorana.
1 Virgo commissioning status M.Barsuglia LAL Orsay.
Suspended Mirror control: Learning through Virgo Experience E. Majorana - I.N.F.N. Pisa Aspen GWAD February 16, 2004.
1 Virgo Commissioning progress and plans ILIAS, Jan 23 rd 2007 Matteo Barsuglia on behalf of the Commissioning Team.
rd ILIAS-GW annual general meeting 1 VIRGO Commissioning progress J. Marque (EGO)
Thursday, 18 March 2004 Andrea Viceré, Urbino University 1/34 Issues in the Virgo mechanical simulation Why a mechanical simulation How the simulation.
Use ofSiesta in VIRGO commissioning Lisa Barsotti University of Pisa – INFN Pisa For the Virgo collaboration Caltech, December 19th 2003.
SIESTA for Virgo locking experience L. Barsotti University of Pisa – INFN Pisa on behalf of the Virgo Locking Group Cascina, March 16th 2004 Simulation.
COMMISSIONING PROGRESS G.LOSURDO – INFN Firenze for the Virgo Collaboration.
Present Superatttenuator performance vs. AdV & ET Requirements S.Braccini for Virgo Suspension group.
Virgo Control Noise Reduction
Stefan Hild 1Ilias WG1 meeting, Sep 2005, Perugia Title GEO 600 Commissioning progress Max-Planck-Institut für Gravitationsphysik (Albert-Einstein-Institut)
Thoughts on short term improvements for Mirror Suspension Control G.Losurdo - P.Ruggi.
Interferometer Control Matt Evans …talk mostly taken from…
The status of Giovanni Losurdo - INFN Firenze-Urbino on behalf of the Virgo Collaboration Workshop on GW detection– Gingin, Oct. 4-7, 2005.
Virgo Commissioning update Gabriele Vajente for the Virgo Collaboration LSC/VIRGO Meeting – MIT 2007, July LIGO-G Z.
1 Noise sources at high frequency in Virgo E. Tournefier (LAPP-CNRS) ILAS WG1 meeting, Hannover December 12 th,2005 Recycled ITF sensitivities Noise sources.
ILIAS – WG1 Hierarchical suspension control G.Losurdo INFN Firenze.
MSC recent activities Commissioning Cascina 2 Apr 2007.
Takanori Sekiguchi External Review Control and tuning of suspension 1 T. Sekiguchi KAGRA 4th External Review.
SUSPENSIONS Pisa S.Braccini C.Bradaschia R.Cavalieri G.Cella V.Dattilo A.Di Virgilio F.Fidecaro F.Frasconi A.Gennai G.Gennaro A.Giazotto L.Holloway F.Paoletti.
Cavity Work at LASTI LSC-VIRGO Meeting, Hannover - 24 th October 2007 Lisa Barsotti and Matthew Evans for the LASTI group G D.
1 Virgo Commissioning progress ILIAS, Nov 13 th 2006 Matteo Barsuglia on behalf of the Commissioning Team.
1 The Virgo noise budget Romain Gouaty For the Virgo collaboration GWADW 2006, Isola d’Elba.
Abstract The Hannover Thermal Noise Experiment V. Leonhardt, L. Ribichini, H. Lück and K. Danzmann Max-Planck- Institut für Gravitationsphysik We measure.
MSC - 18 Oct 071 LOW FREQUENCY SEISMIC NOISE: LOCKING AND SENSITIVITY ISSUE Paolo Ruggi noise meeting.
Paolo La Penna ILIAS N5-WP1 meeting Noise analysis in Virgo Cascina, 7-8 July 2004 Analysis of noise in VIRGO.
ILIAS Geneva 29 March 2007 Virgo suspension control progress E. Majorana INFN Mirror Suspension Control workgroup.
LIGO-G Z The Status of VIRGO E. Tournefier for the Virgo Collaboration GWADW 2004, Aspen From the CITF to VIRGO Commissioning of the Fabry-Perot.
M. Mantovani, ILIAS Meeting 7 April 2005 Hannover Linear Alignment System for the VIRGO Interferometer M. Mantovani, A. Freise, J. Marque, G. Vajente.
Analysis of the Virgo runs sensitivities Raffaele Flaminio, Romain Gouaty, Edwige Tournefier Summary : - Introduction : goal of the study / Overview on.
Laser Frequency Stabilization – 2004, May 04 1 Laser Frequency Stabilization François BONDU CNRS – ARTEMIS, Nice VIRGO How it works (Design) Make it work.
The VIRGO Suspensions Control System Alberto Gennai The VIRGO Collaboration.
MSC winter, short-term schedule Commissioning meeting Cascina 2 Oct 2006.
The control of the Virgo Superattenuator: present and future Giovanni Losurdo - INFN Firenze/Urbino on behalf of the Virgo Collaboration.
Paolo La Penna ILIAS N5-WP1 meeting Commissioning Progress Hannover, July 2004 VIRGO commissioning progress report.
Gabriele Vajente ILIAS WG1 meeting - Frascati Noise Analysis Tools at Virgo.
MSC recent activities COMM Cascina 5 Feb EM-MSC Commissioning-oriented running activity Operation and interface updates Hardware checkup.
LIGO-G Z March 2007, LSC meeting, Osamu Miyakawa 1 Osamu Miyakawa Hiroaki Yamamoto March 21, 2006 LSC meeting Modeling of AdLIGO arm lock acquisition.
Caltech, February 12th1 Virgo central interferometer: commissioning and engineering runs Matteo Barsuglia Laboratoire de l’Accelerateur Lineaire, Orsay.
1 DC readout for Virgo+? E. Tournefier WG1 meeting, Hannover January 23 rd,2007 DC vs AC readout: technical noises Output mode cleaner for DC readout.
Monica VarvellaIEEE - GW Workshop Roma, October 21, M.Varvella Virgo LAL Orsay / LIGO CalTech Time-domain model for AdvLIGO Interferometer Gravitational.
1 Frequency Noise in Virgo by Matt Evans. 2 The Actors  Noise Sources  Input Mode Cleaner length noise  Sensing noise on IMC lock  Frequency Servo.
SAT Plans for System R&D Signal Recycling Construction and A&I Short Suspension Upgrade Roberto Passaquieti Università di Pisa and INFN-Pisa AdV Review.
Sensitivity of Virgo E. Tournefier (LAPP-CNRS) LSC-Virgo week May 23 rd,2007 LIGO-G Z.
Filter #7 control April 18, 2016 –, Cascina Paolo Ruggi.
Yoichi Aso Columbia University, New York, NY, USA University of Tokyo, Tokyo, Japan July 14th th Edoardo Amaldi Conference on Gravitational Waves.
Advanced SA Specifications & Scientific Motivations S.Braccini, Cascina 21 Settembre 2007.
Paola Puppo INFN – Rome Thermal Noise Meeting – “Sapienza”-Rome - February 26 th 2008.
VIRGO Superattenuator performance and its evolution in the SAFE Project F. Frasconi – INFN Pisa (ET-WP2 Workshop – Roma – February 27, 2009)
Time domain simulation for a FP cavity with AdLIGO parameters on E2E
Last stage SA F7 monitor/control
Type-A SAS Local Control Simulation (Current Status)
VIRGO–KAGRA Meeting about bottom filter damping
Time domain simulation for a FP cavity with AdLIGO parameters on E2E
Present Superattenuator performance vs. ET Requirements S
Control of the KAGRA Cryogenic Vibration Isolation System
Superattenuator for LF and HF interferometers
The Superattenuator upgrades and the SAFE Project
MSC report September weekly meeting EM-MSC
Frequency Noise in Virgo
Weekly meeting Cascina 9 Jan 2007
weekly meeting Cascina 28 Nov 2006
Presentation transcript:

Experimental tests of SA simulation Irene Fiori – Simulation Workshop – March 18, 2004 Virgo dataSiesta simulation 1. Inertial Damping simulation  test with Real Seism (the Sea-storm) 2. Marionetta  Mirror TF  ITF Lock from marionette

Inertial Damping Seism Reduce the SA motion below  2Hz (in particular at resonances …. IP resonance  30mHz, chain resonances  200mHz ) Helps for Lock acquisition (together with mirror Local Controls) F0 ACCELEROMETERS POSITION SENSORS (LVDTs) COIL-MAGNET C Corr Lvdt_x Acc_x (similar on z,  y ) x z F0 top view: yy (force on F0_x) + x z F0 top view: Err

H L L+H=1 5 Hz Open loop gain: Filters:

The code : MIsa SuNI 0 Sisma.out "ni_tuned.sad 0 dampTotal damping.out "defaults" UJclock masterClocks UFrIFile input 1../mareggiata_guralp/guralpdispl_full_200hz.gwf UFrDump 1 input.frameH UFrUnpack Sisma_mare 0 proc.Guralp_displ input.frameH US6Set Sisma 0 Sisma_mare.out Sisma_mare.out Sisma_mare.out NULL NULL NULL /* */ /* NEW Inertial damping GENERIC tower (A.Vicere, I.Fiori, G.Losurdo) */ /* */ USfilterZPK hp1_acc_s0 SuNI.dxyzt.s USfilterZPK …. US6Set damping 0 viscous_s0.out NULL viscous_s2.out NULL viscous_s4.out NULL USadder error_s2 0 2 lvdt_notched_s2.out hp_acc_s2.out …..

Mirror motion ID on / off, with nominal seism (…only with Simulation!)

SA modes Real vs Siesta Resonances F0 cross bar Siesta “nominal” SA tower (not simulated yet)

F0 horizontal modes (poles) [ Hz ] BS towerSiesta (% deviation) (+3%) (+2%) (+7%) (-2.5%) (-2%) (+2.5%) (+1.9%) (+1%)

Ground Seism in Siesta Real Seism (SEA-STORM) Nov. 16, 2003 (C1 run) y x z

Inertial damping (C1) Simulation fed with REAL SEISM of SEA-STORM on Nov. 16, 2004 (C1) Quiet seism (data) F0 position sensor Sensor electronic noise

Inertial damping (C1) Real data Siesta F0 cross-bar Simulation fed with REAL SEISM of SEA-STORM on Nov. 16, 2004 (C1) F0 accelerometer m/s^2/sqrt(Hz) Accelerometer Noise not Simulated, here

New local controls reading marionette position: a tilted mirror couples a  z resonance to  y (300 mHz). This resonance is not controllable: we do not have  z actuators A storm during C1 caused an increase of seismic mHz of about 100  Big excitation of the  z resonance (coupled with  y )  Loss of lock A new mathematical solution (L5 damping) has been found that allows to: –Move the blending down to 70 mHz preserving the phase margin –Rolling off the LVDT as 1/f 3 New Inertial Damping for C2 run (from G.Losurdo) …..

New Inertial Damping (C2) Siesta prediction F0 accelerometer response, with Nov. 16 SEA-STORM Seism Accelerometer electronics noise

New Inertial Damping (C2) “fortunately” a new, even bigger, sea-storm occured during C2 … C2 C1 Ground seism

Marionetta  Mirror A good simulation of the Marionetta 2 Mirror mechanical TFs is important for implementing simulation of: mirrors Local Controls (  x and  y ) ITF Linear Alignement (  x and  y ) ITF Lock acting from the Marionette (z)

Marionetta  Mirror (z) Siesta, since v3r88 1/ f 4 Measured (Luciano)

Marionetta  Mirror (  y) Siesta Measured

Marionetta  Mirror (  x) Siesta  TM wires: 400  m 200  m Measured NOW

Marionetta Z modes [Hz] MeasuredSiesta (P) (+1%) (Z) (+1.5%) (P) (+0.5%) (Z) (-2%) (P) (+0%) (ZP) (-0%) (ZP) (+0.7%) (P) (+0.5%) (Z) (P) (Z) (-4%) (P) (-2%) -(Z) (P) 1.08 (Z) (0%) (P) (0.8%) (Z) (P)  y modes [Hz] MeasuredSiesta (P) (+0.3%) (Z) (-0.9%) (P) (-0.6%) (Z) (-2%) (P) (-0.7%) (Z) (-0.3%) (P) (-1%) (P) (-3%)  x modes [Hz] MeasuredSiesta (P) (+1.7%) (Z) (-0.2%) (P) (+1%) (Z) (+0.5%) (P) (-3.8%) (Z) (+7%)

ITF Lock with Marionetta What is there :What is still missing : C Noise DAC  dL B1p_quad B7_DC Seismic noise (5.E-8 / f 2 ) Inertial Damping (v.C2) Actuators (F7): 8.8Hz pole, DAC noise, saturation Higher modes (now TEM00) Control mirror Tx, Ty Noises: shot, thermal, laser tuning of Mario resonances B7 B1 seism F7 coil (I.Fiori, A.Gennai, G.Losurdo)

Compensator f 4 25 Hz G  2E+5  45°  f -2 (f 3 )

Linear Locking (from Marionetta) 0.1% “Lock Quality” similar to standard-lock simulation

Lock Transition: Mirror  Mario Err Coil RM 480 Hz) Anti- TRIGGER Coil F7 8.8 Hz) x TRIGGER Ramp 10s x DAC noise (300nV/sqrt(Hz)) DAC noise (300nV/sqrt(Hz)) Err_mario Err_lisa RM coils DAC noise turned OFF

Lock Transition: Mirror  Marionetta 10s RAMP

Sensitivity curve Can improve the compensator (lower unity gain)

Conclusions SA Siesta simulation being tested against data, with good results most SA resonant modes reproduced within < few % tower by tower tuning, in progress. Implementation/validation of SA control loops, in progress: SA Inertial Damping Mirror local angular controls Mirror Linear Alignement (Tidal control) More complex Siesta simulations (ITF locking) also demonstrate SA simulation works satisfactory Siesta simulation being used to test/design Virgo controls