Integrity Management Continuous Improvement Fitness For Service and Management of Pre-Regulation Pipe Chad Zamarin Chief Operating Officer NiSource Midstream.

Slides:



Advertisements
Similar presentations
Museum Presentation Intermuseum Conservation Association.
Advertisements

GTI’s Composite Materials (CM) Program
2010 PODS User Conference Houston, Texas October 28, 2010 PHMSA Update John A. Jacobi, P.E. CATS Manager, SW Region.
August 21, 2012 Western Regional Gas Conference Paul Gustilo Southwest Gas Corporation.
Integrity Management Program Special Permits (IMP-SP) Draft Administrative Plan 12/5/2007.
Pipeline Personnel Qualification
Ohio’s One-Stop Utility Resource Gas Pipeline Safety Pipelines - State and Local Issues Pete Chace GPS Program Manager (614)
Interstate Natural Gas Association of America INGAA Action Plan to Build Confidence in Pipeline Safety INGAA Integrity Management Continuous Improvement.
AGA Perspectives on Current Pipeline Safety Regulations August 2014.
Gas Transmission Pipelines
Congressional Reauthorization and PHMSA Rulemakings – Enough to avoid future tragedies? Carl Weimer, Executive Director Pipeline Safety Trust.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration PHMSA Office of Pipeline Safety Kenneth Y. Lee Engineering & Research.
High Consequence Areas & Pipeline Assessment Intervals –Is there a need for change? Terry Boss Sr. VP Environment Safety and Operations Interstate Natural.
U. S. Department of Transportation Pipeline and Hazardous Materials Safety Administration
Overview of Key Rule Features
Session 121 National Incident Management Systems Session 12 Slide Deck.
Pipeline Safety Program Regulatory (DOT) Pipeline Risk Management Pipeline Safety Trust New Orleans, Louisiana November 16, 2007 John A. Jacobi, P.E. PHMSA.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration PHMSA Update Kenneth Y. Lee Engineering & Research Division
Pipelines and Informed Planning Alliance A Real Estate Symposium International Right of Way Association/Appraisal Institute Las Vegas, NV January 13-15,
Pipeline Qra Seminar Title slide Title slide.
ILLINOIS COMMERCE COMMISSION Darin Burk Pipeline Safety Program Manager.
Safety Management Systems
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration San Bruno – Lessons Learned Alan K. Mayberry, P.E. Deputy Associate.
SCC DA Program Stress-corrosion-cracking direct assessment (SCCDA) is a structured process that contributes to pipeline company’s efforts to improve.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Harold Winnie, CATS Manager (Central Region) Leak detection for.
Safety Management Systems Presentation to PHMSA Advisory Committees December 2012.
Western Regional Gas Conference August 25, 2009 Distribution Integrity Management Programs (DIMP) & SHRIMP.
Technical Advisory Committee December 2012 Fitness for Service.
U. S. Department of Transportation Pipeline and Hazardous Materials Safety Administration
Lessons Learned….. Were PG&E practices an anomaly or the tip of a bigger problem? How would we know? 2011 Pipeline Safety Trust Conference – Getting to.
Distribution Integrity Management John Erickson, PE American Public Gas Association.
Physical Building Audit Physical Building Audit By; Engr.Dr.Attaullah Shah PhD ( Civil) Engg, MSc Engg ( Strs), BSc Engg ( Gold Medalist),), MBA, MA (
Western Regional Gas Conference August 24, 2010 Distribution Integrity Management Programs (DIMP) Rule.
RAILROAD COMMISSION OF TEXAS Stephanie Weidman Austin Regional Manager Oversight and Safety Division Pipeline Safety September 2015.
Pipeline Safety Trust Fort Worth Natural Gas Production Issues John W. Pepper Project Manager Office of Pipeline Safety Southwest Region, Houston, Texas.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Overview of Integrity Verification Process (IVP) Workshop Held.
America’s Natural Gas Utilities’ Distribution Pipelines November 2, 2006 The Connection To the Customer.
ILLINOIS COMMERCE COMMISSION Darin Burk Manager – Pipeline Safety 1.
HCAs & Pipeline Assessment Intervals Is There a Need for Change? Richard B. Kuprewicz President, Accufacts Inc. For Pipeline Safety Trust New Orleans Conference.
WHAT DOES IT MEAN FOR YOUR MAOP? REAUTHORIZATION, SAN BRUNO, AND PHMSA’S ADVISORY BULLETIN.
U. S. Department of Transportation Pipeline and Hazardous Materials Safety Administration
A Framework for Your Pipeline Integrity Program. 2 A Few Thoughts Before Beginning l This rule is new to the pipeline industry although many of the concepts.
API 18LCM (Life Cycle Management) Report back to SC17 August 27, 2015 Review Team: Dave Wilkinson, John Strut, Smarty John, David Saul, Peter Moles.
What’s Wrong with Integrity Management? How Do We Improve Integrity Management? Terry Boss Senior Vice President Safety Environment and Operations PST.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Verification of Records Linda Daugherty – Dep Associate.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Pipeline Standards and Rulemaking Division: Current Rulemakings.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Gas Transmission 2012 Annual Reports Joint Advisory Committees.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration 1 Mike Israni Senior Technical Advisor Manager: Standards & Committees.
Pipeline Safety – 2015 Year in Review. Large PHMSA Budget Increase Pipeline Safety spending in 2015 was increased $26.9 million. Main areas of expansion.
How Old is too Old? Who Makes that Decision? Alan Mayberry New Orleans, Louisiana Pipeline Safety Trust Annual Conference
U.S. DOT Pipeline and Hazardous Materials Safety Administration Integrity Management Systems November 18, 2015 Chris McLaren - 1 -
Stress Corrosion Cracking (SCC) Josef Kopec, P.Eng.
Who is INGAA? INGAA represents the majority of the interstate natural gas transmission pipeline companies operating in the U.S., as well as comparable.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Section 24 Pipeline Safety Standards Incorporated Into the Federal.
Need Information or Assistance? Where to go, what’s available and what’s not.
Office of Pipeline Safety Remedial Action Review Protocol Integrity Management Workshop July 23-24, 2002.
Gas Pipeline Safety Federal Regulatory Update Pete Chace Public Utilities Commission of Ohio Gas Pipeline Safety Program Manager.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Pipeline Standards and Rulemaking Division: Current Rulemakings.
Integrity Management Continuous Improvement Project Status and Implementation Process Presentation for: PHMSA Advisory Committees July 11, 2012.
Pipeline Regulations Susan Miller Enbridge Technology Inc.
Pipeline Safety Issues
Legislative & Regulatory Update on Validation of MAOPs of Transmission Pipelines January 17, 2012 Best Practices Kickoff Meeting Andrew Lu
Traceability of Gas Pipeline Materials Research & Materials Manager
Utility Technologies International
AGA Positions on Current PHMSA Rulemakings
AGA Legal Forum - July 2017 Regulatory Concerns for LDCs
AGA Operations Conference
Pipeline Integrity Management Programs
Gas Transmission Pipelines
Presentation transcript:

Integrity Management Continuous Improvement Fitness For Service and Management of Pre-Regulation Pipe Chad Zamarin Chief Operating Officer NiSource Midstream Services For: Gas Pipeline Advisory Committee December 13, 2012

What Is Fitness For Service (FFS)? The ability of a system or component to provide continued service, within established regulations and margins for safety Well-accepted approach to evaluate condition of a system or component to determine acceptability for continued operation Applied in petroleum refining, petrochemical, pulp and paper, nuclear, coal and gas-fired electric power industries One of the first acknowledged threat specific applications was in the pipeline industry  B31G, a method for calculating the remaining strength of pipelines in areas with metal loss, first published in 1984

Fitness For Service (FFS) for pipelines Disciplined approach to assessing the condition of a pipeline component or system to demonstrate safety and reliability Not a bypass for strong regulations – in fact, a basis for strong regulations Process focused Based on sound engineering Numerous examples within existing regulatory framework  Alternative MAOP (liquids and gas)  ERW Seam Integrity  Threat specific integrity assessment  Defect specific engineering critical assessment (ECA)

3 “Traceable, verifiable and complete” Significant Focus on Records and MAOP PHMSA Advisory Bulletins NTSB Recommendations California MAOP Order MAOP impacts numerous key functions Understanding MAOP and related properties are critical to operating a safe pipeline system Gas Control Facility PlanningFERCCompressor Measurement & Regulation Project Mgmt Pipeline & CorrosionOperations Integrity Mgmt Technical Data / Geographic Data Systems SCADA set points and alarms System operation Capacity & through-put to meet market demand Modeling analysis FERC certificated MAOP for pipeline Shutdown set points for compressor units Operation of compressor units Set points for over-pressure protection Type of over- pressure protection selected Pipeline design, construction & qualification testing requirements for new or replacement pipes Safety measures taken during maintenance, construction or anomaly investigations Jurisdictional gathering line determinations RSTRENG or other remaining strength calculations Load and other calculations May influence defect repair methods CIS frequency based on risk May impact areas considered active corrosion zones Pipeline operations, type & frequency of maintenance activities Recordkeeping associated with pipeline Safety measures regarding defects, excavation, public safety, etc. Emergency measures & planning Pipeline isolation and valve design Determining HCA areas based on PIR calculations May impact ability to pig pipeline Failure pressure calculations for anomaly indications Risk calculated for the pipeline Outcome of Class Locations determinations PIR calculations MAOP data in GIS

Recognized need to define and implement a “fitness for service” protocol for pipelines built prior to regulations Develop and apply guidance, including a process for systematically validating records and the MAOP. Process will address NTSB recommendations and PHMSA advisory to demonstrate traceable, verifiable and complete records Where records do not meet this standard, a process will include MAOP validation protocol to be applied within a defined period of time INGAA Commitments Fitness For Service for Pre-Regulation Pipe and MAOP Validation

Augmenting risk assessment and threat management to address material threats more aggressively for previously untested pipe. Where traceable, verifiable and complete records exist to establish MAOP, and there is a pressure test to 1.25xMAOP, continue to operate under 49 CFR 192. Where records are incomplete, or if the pressure test does not meet above criteria or there is no historical pressure test, apply FFS Process For Managing Pre- Regulation Pipe. Where records do not exist or are incomplete for a segment containing short sections of pipe in a replacement project or tie in of a line or appurtenance prior to the Federal regulations coming into effect, assign the segment as a high priority for hydrostatic pressure testing, direct examination and testing or replacement (San Bruno Provision – High Priority Slide 13). Evaluate use of historical pressure tests and piggability INGAA is working with AGA, API, AOPL and research community to develop ILI technology to evaluate material and construction threats in lieu of hydrostatic pressure testing.

Process for Traceable, Verifiable and Complete Records Locate Records Are There Gaps In Data? Are There Gaps In Data? Compile Data Verify Data Document Gaps Are Gaps Resolved? Are Gaps Resolved? Link To Data Base and Retain Apply MOC In Changing Records Define Means To Resolve Gaps Lack of Pressure Test Meeting 1.25xMAOP - Apply Process For Managing Pre-Regulation Pipe Yes NoYes No Valid Data Traceable, Verifiable and Complete Record Guidance

Process For Managing Pre-Regulation Pipe Legislation included an MAOP / records requirement, broad stakeholder need INGAA commissioned workgroup focused on records and MAOP Broad Industry Involvement Operators are already aggressively researching their systems Fitness For Service for Pre-Regulation Pipe and MAOP Validation

Process For Managing Pre-Regulation Pipe FFS Process based on prior precedent – hazardous liquids regulation Highest risk pipelines likely require pressure test if records are not available Medium risk pipelines will require test or equivalent measure on longer timeline Continue operating low risk pipelines under current regulations Fitness For Service for Pre-Regulation Pipe and MAOP Validation

Process For Managing Pre-Regulation Pipe Discussion Draft – Work In Progress Fitness For Service for Pre-Regulation Pipe and MAOP Validation

Risk Based Alternative Risk Based Alternative Draws From Approach Used for Hazardous Liquid Pipelines at 49 CFR LF-ERW is low frequency electric resistance welded; EFW is electric fusion or flash welded; and JF is joint factor as defined at 49 CFR Process For Managing Pre-Regulation Pipe Discussion Draft – Work In Progress Fitness For Service for Pre-Regulation Pipe and MAOP Validation

Technical Lead Mark Hereth Managing Director Blacksmith Group/P-PIC Executive Champion Chad Zamarin Chief Operating Officer NiSource Midstream Services FITNESS FOR SERVICE FOR PRE-REGULATION PIPE AND MAOP VALIDATION