New IP chamber for ATF2 goal 2 Philip Bambade Laboratoire de l’Accélérateur Linéaire Université Paris 11, Orsay, France ATF2 Technical Review KEK, 3-4.

Slides:



Advertisements
Similar presentations
Electrical wiring for piezo movers piezo power supply strain gauges readout temperature probes 1 Frédéric BOGARD – LAL/IN2P3/CNRS – Jan 25, 2013 Electrical.
Advertisements

1/8 T. Kume, Y. Honda, and T. Tauchi High Energy Accelerator Research Organization (KEK) T. Suehara, H. Yoda, M. Oroku, T. Yamanaka and Y. Kamiya The univ.
Wed 15 Jul 2009 ATF2 weekly meeting Oxford MONALISA 1 MONALISA at ATF2 First installation report 15 July 09.
Sta bilization of the F inal F ocus : Stabilization with Nano-Meter Precision.
Robert Ruland Installation Alignment -Magnetic Measurements – Fiducialization April 7-8, 2005 FAC Meeting 1 Installation Alignment,
Workshop TS May 2008 GENERAL CLIC ALIGNMENT Progresses and strategy. Hélène MAINAUD DURAND, TS/SU/MTI.
IPBPM piezo-mover system and plans for in situ monitoring of calibration and stability Current status and plan for ATF2 Philip Bambade Laboratoire de l’Accélérateur.
Status of IPBSM Improvement N. Terunuma, KEK 2012/July/13 ATF2 Weekly Meeting.
-brief report of October runs and some inputs for the Nov/Dec planning – Nobuhiro Terunuma, KEK, ATF ATF session on LCWS13, Tokyo Univ., Nov. 13, 2013.
ATF2 Progress Report For CLIC Workshop Kiyoshi KUBO.
ATF2 Status and Plan K. Kubo ATF2, Final Focus Test for LC Achievement of 37 nm beam size (Goal 1) – Demonstration of a compact final focus.
Plan for the summer Nobuhiro Terunuma, KEK ATF day: ATF Collaboration Meeting European Linear Collider Workshop ECFA LC2013, May 28,
Vibration measurements on the final doublets and the Shintake Monitor Benoît BOLZON7th ATF2 project meeting, 16/12/08.
1.Beam Tuning Simulation 2.IP Beam Position Stability 2-1 ) Magnet Vibration 2-2 ) IP position jitter subtraction for 2 nd bunch with FONT feedback 2-3.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett*, Talitha Bromwich, Glenn Christian, Michael Davis, Colin Perry.
1 ATF2 - IP Chamber Design and manufacturing of Chamber with high precision piezo actuators for high resolution BPMs Status / progress report – 26 June.
High Resolution Cavity BPM for ILC final focal system (IP-BPM) ILC2007/LCWS 2007 BDS, 2007/6/1 The University of Tokyo, KEK, Tohoku Gakuin University,
Discussion on Milestone and schedule Toshiyuki Okugi ATF2 commissioning meeting 1 / 7 / 2009.
LHC Machine Status Report Roberto Saban LHCC June 4 th 2014.
Status of QBPM Electronics and Magnet Movers as of June 3 rd 2008 D. McCormick, J Nelson, G White SLAC S Boogert Royal Holloway Y. Honda, Y.Inoue KEK.
ATF2 ILC Final Focus Test Beam Line at KEK-ATF References : ATF2 Proposal, KEK Report ATF2 Proposal Vol.2, KEK Report ホームページ:
ATF2 meeting LAPP; David Urner 1 David Urner Paul Coe Matthew Warden Armin Reichold Geoffrey Rayner MPhys alumnus MONALISA Monitoring, Alignment.
Technical Board ATF2 GM FF progress report A.Jeremie ATF2 GM System team: K.Artoos, C.Charrondière, A.Jeremie, J.Pfingstner (a lot of figures from him),
Stabilization of Focus at ATF2 David Urner University of Oxford.
1 Virgo Commissioning progress ILIAS, Nov 13 th 2006 Matteo Barsuglia on behalf of the Commissioning Team.
IP-BPM status Siwon Jang KNU. Contents The electronics repair status –Repair work status –Electronics RF test (by using Oscilloscope) –Electronics shipment.
Project Management Mark Palmer Cornell Laboratory for Accelerator-Based Sciences and Education.
Commissioning Status of Shintake Monitor (IP-BSM) T. Yamanaka, M. Oroku, Y. Yamaguchi, Y. Kamiya, S. Komamiya (Univ. of Tokyo), T. Okugi, N. Terunuma,
Compressor status AWAKE Technical Board meeting 19 August 2015.
Tomoyuki Sanuki, Daisuke Okamoto, Yosuke Honda, Toshiaki Tauchi TB&SGC meeting.
1 Progress of IR Vacuum Chambers Chen Peng May 11,2007.
Highlights and discussion at LAL FKPPL & FJPPL “Toshiko Yuasa” workshop Philip Bambade Laboratoire de l’Accélérateur Linéaire Université Paris 11, Orsay,
Technical Board “issues” Philip Bambade Laboratoire de l’Accélérateur Linéaire Université Paris 11, Orsay, France ATF2 Technical Review KEK, 3-4 April.
1 FONT R&D status Philip Burrows Douglas Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John Adams Institute Oxford University.
Design and Detailed Plan for In Vacuum Diamond Sensor for PHIL and ATF2 S. Liu, P. Bambade, F. Bogard, P. Cornebise, I. Khvastnov, H. Monard, C. Sylvia.
ATF2 Commissioning Toshiyuki Okugi 2008 / 7 /9 ATF2 beam commissioning meeting, KEK.
Greeting for 10 th ATF2 project and TB/SGC joint meeting 1.
Global Design Effort Introduction and goals of the meeting Andrei Seryi, Toshiaki Tauchi Fifth ATF2 Project Meeting December 19-21, 2007.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett*, Talitha Bromwich, Glenn Christian, Michael Davis, Colin Perry.
IP instrumentation configuration for Autumn 2010 ATF2 runs Toshiyuki OKUGI, KEK 2010 / 7/ 1 10 th ATF2 project meeting.
July 15, 2009 Interferometer Installation Report Mike Hildreth, Kurt Jung, Mickey McDonald Université de Notre Dame du Lac.
GM sensor tests and installation A.Jeremie K.Artoos, D. Kudryavtsev, Y.Renier, R.Tomas-Garcia, D.Schulte.
ATF2 Tuning Summary Nov & Dec 2010 Glen White, SLAC 11 th ATF2 Project Meeting, SLAC Jan
ATF2 Report ALCW Kiyoshi KUBO, for ATF2 Collaboration.
Task Lists of ATF2 commissioning Toshiyuki Okugi ATF2 Project Meeting 12 / 17 / 2008.
ATF2: Summary of Scheduling Strategy Session Grahame Blair Feedback and Feedforward systems Fast Kicker for ILC bunch train structure Laser-wire Shintake.
ATF2 beam operation status Toshiyuki OKUGI, KEK The 9 th TB&SGC meeting KEK, 3-gokan Seminar Hall 2009/ 12/ 16.
Vibrations studies for the nominal optics and the ultra-low beta optics Benoît BOLZON 1 B. Bolzon, A. Jeremie (LAPP) P. Bambade, Y. Renier (LAL) A. Seryi.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John.
Alignment system and impact on CLIC two-beam module design H. Mainaud-Durand, G. Riddone CTC meeting –
1 IP FB tests at ATF2 Philip Burrows Douglas Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John Adams Institute Oxford.
Test plan for CLIC MB linac quad LAPP option A.Jeremie.
Instrumentation at ATF / TTF Accelerator Test Facility (KEK) Tesla Test Facility – FLASH (DESY) ESA / LCLS (SLAC) Marc Ross, SLAC.
Design for a New Optical Table of the Shintake Monitor Takashi Yamanaka The University of Tokyo ATF2 weekly meeting 2007/9/26.
Progress of Shintake Monitor (ATF2 IP-BSM) ATF2 weekly meeting 2008/9/3 Takashi Yamanaka The University of Tokyo.
Technical Board Summary Preliminary Philip Bambade Laboratoire de l’Accélérateur Linéaire Université Paris 11, Orsay, France ATF2 project meeting, Technical.
Status of ATF2 linear collider focus prototype emphasizing France-China joint contributions Philip Bambade Laboratoire de l’Accélérateur Linéaire Université.
Current Status of QBPM Electronics and Magnet Movers D. McCormick, J Nelson, G White SLAC S Boogert Royal Holloway Y. Honda, Y.Inoue KEK.
ATF2 Status Background for the installation planning of Collimator
ATF2: Accelerator Test facility A.Jeremie LAPP: A.Jeremie LAL: P.Bambade, Shan Liu, S.Wallon, F.Bogard, O.Blanco, P.Cornebise, I. Khvastunov, V. Kubytskyi.
Alignment and stability session
ATF2 Status N.Terunuma, KEK
Special ATF Session - ATF/ATF2 day on 28th September -
Nanometer stabilisation at ATF2 within FJPPL and FKPPL
ATF2 post-IP Diamond Sensor Status
LAL Status - based on inputs from W. Kaabi and A. Stocchi - cf
Summary of the ATF2 project meeting at LAL (Jan.13-15, 2016)
IP configuration session
Breakout Session SC3 – Undulator
Presentation transcript:

New IP chamber for ATF2 goal 2 Philip Bambade Laboratoire de l’Accélérateur Linéaire Université Paris 11, Orsay, France ATF2 Technical Review KEK, 3-4 April 2013 On behalf of: LAL: Oscar BLANCO, Frédéric BOGARD, Patrick Cornebise, Max DEMAREST, Bruno LELUAN, Bruno MERCIER, Sandry WALLON LAPP: Laurent JOURNET, Christine GASCQ KEK: Sakae ARAKI, Toshiaki TAUCHI, Nobuhiro TERUNUMA

Requirements for new IP chamber 1.Pre-alignment of IP-BPM set with respect to rest of beam line < 200  m 2.Internal pre-positioning accuracy  50  m 3.Remote relative positioning via beam based alignment within < 5  m (dynamic range of IP-BPM electronics) 4.Mechanical calibration of IP-BPM scale factors  Compatibility with IP-BSM operation (viewports for lasers, wire-scanner, electron / laser beam alignment…) Present IP-chamber (FFTB)

Required precision on relative IP-BPM scale factors depends on beam parameters  ~ 1 m (e.g. diagnostic section)  123IP d  IP = (y 2 – y 1 ) / d y IP = 2 y 2 – y 1  = calibration error of 1 relative to 2  2 y 2 – y 1  y IP + 2   d Residual  2 (  /  ) 0.5 d (  jitter /  )       for 1 nm error d  0.1 m  y  12 pm  jitter /   10%  ~ / m (interaction point : nominal / 10 x optics) Residual  2 (  /  ) 0.5 d (  jitter /  )       / -3 for 1 / 10 nm error   / -3 for 1 / 10 nm error 1.Determination of resolution 2.Feedback to IP or to 3 rd IP-BPM

Main features of new IP chamber 1.Mechanical references for precise pre-positioning and alignment 2.Adjustable fixture for rigid mount on IP-BSM optical table 3.Base-plate + cradles support BPM1-2 and BPM3 in tripod configurations 4.Lateral & vertical adjustments with 8 piezo-movers in  m range 5.Positioning within of the range (strain gauges as input to feedback) 6.In-vacuum temperature monitoring 7.Remote electronics (25 meter cables)

Mechanical parts almost completed 4 PI piezo-actuators 4 Cedrat piezo-actuators Chamber and internal parts manufactured at LAPP Modifications, alignment tools and temporary flanges at LAL Mounting fixtures on IP-BSM vertical table and for vibration sensor on chamber in progress at LAL Upstream chamber extension, viewports extensions, final upstream / downstream flanges and tool for in situ relative laser / beam / IP-BPM alignment in progress at KEK

Dimensional checks

Adjustment of BPM positioning system Delayed to May (availability of 3D machine)

Vacuum test of chamber & piezo-actuators completed Outgasing of both PI and Cedrat with cables are OK :  flowrate at 8x10-8 mbar.l/s (suitable for UHV)  at 21° C and after 100 hours of pumping, no organic compound detected.

Piezo-mover performance checks : - on-going for PI - some delay for Cedrat ( noisy controller power supply affecting read-back ) - Closed-loop stability - Open-loop stability - Setting accuracy - Calibration - Thermal effects - Vibration mitigation

Near term prospects Still some components are scheduled to be received and some testing and adjustments will be done in April  mid May Preparations for shipment (paperwork & packaging) in May Delivery at KEK mid June Installation at KEK scheduled in first two weeks of July Commissioning with beam in Autumn 2013 Concluding remarks A mechanical support system is being prepared to meet the requirements of the IP-BPM project at ATF2 Re-establish IP-BSM setup procedure with new IP chamber Vibration studies are planned with the LAPP team Operation of involved piezo-movers is being prepared at LAL Residuals from thermal effects will need to be considered Central coordination & support for combined goal operation Demonstrate very small & very stable beams at ATF2 !