3. Improvement Methodology “Standards only exist to be superseded by better standards”

Slides:



Advertisements
Similar presentations
QA Programs for Local Health Departments
Advertisements

ORGANIZATION. 2 Problem scenario  Develop an organizational chart for your laboratory showing lines of authority from the head of the organization to.
ORGANIZATION. 2 Purchasing & Inventory Assessment Occurrence Management Information Management Process Improvement Customer Service Facilities & Safety.
ISO 9001 : 2000.
EPSON STAMPING ISO REV 1 2/10/2000.
Contractor Management and ISO 14001:2004
1 Quality Management Standards. 2 THE ISO 9000 FAMILY ISO 9000: 2005 Identifies the fundamentals and vocabulary for Quality Management Systems (QMS) ISO.
The ISO 9002 Quality Assurance Management System
Chapter 3 Global Supply Chain Quality and
Purpose of the Standards
ISO 9000 Certification ISO 9001 and ISO
THE PRINCIPLES OF QUALITY MANAGEMENT. DEFINING QUALITY Good Appearance? High Price? The Best? Particular Specification? Not necessarily, but always: Fitness.
ISO 9000 Implementation Imran Hussain.
TC176/IAF ISO 9001:2000 Auditing Practices Group.
4. Quality Management System (QMS)
Welcome ISO9001:2000 Foundation Workshop.
Fundamentals of ISO.
Management Overview of
Consultancy.
WHAT IS ISO 9000.
Quality Management Systems P.Suriya Prakash Final Mech Vcet
© 2011 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
UNIT-II Chapter : Software Quality Assurance(SQA)
Basics of OHSAS Occupational Health & Safety Management System
ISO 9000 and Public Awareness and Information Session 22 February 2006 Owen Glave, MBA-TQM.
1 Accreditation and Certification: Definition  Certification: Procedures by which a third party gives written assurance that a product, process or service.
Value Analysis/ Flow Analysis
ISO 9001:2000 QUALITY MANAGEMENT SYSTEM REQUIREMENTS
Software Quality Assurance Lecture 4. Lecture Outline ISO ISO 9000 Series of Standards ISO 9001: 2000 Overview ISO 9001: 2008 ISO 9003: 2004 Overview.
Lec#3 Project Quality Management Ghazala Amin. 2 Quality Specialist-Job responsibility Responsibilities Reports monitoring and measurement of processes.
Slide 1 D2.TCS.CL5.04. Subject Elements This unit comprises five Elements: 1.Define the need for tourism product research 2.Develop the research to be.
Introduction to ISO 9001:2000.
ISO 9000 & TOTAL QUALITY ISO 9000 refers to a group of quality assurance standards established by the International Organization for Standardization.This.
IAEA International Atomic Energy Agency Reviewing Management System and the Interface with Nuclear Security (IRRS Modules 4 and 12) BASIC IRRS TRAINING.
1 Unit 1 Information for management. 2 Introduction Decision-making is the primary role of the management function. The manager’s decision will depend.
Georgia Institute of Technology CS 4320 Fall 2003.
Paul Hardiman and Rob Brown SMMT IF Planning and organising an audit.
Quality Management.
AET0012PPT by Dr. Anwar El-Tawil Dr. Anwar El-Tawil Director ISO Programme for Developing Countries QUALITY MANAGEMENT SYSTEM ACCORDING TO.
Visit us at E mail: Tele:
Copyright  2005 McGraw-Hill Australia Pty Ltd PPTs t/a Australian Human Resources Management by Jeremy Seward and Tim Dein Slides prepared by Michelle.
9. Applying scientific tools & techniques for improving customer satisfaction.
QUALITY MANAGEMENT STATEMENT
ISO, QMS & CIR Awareness 2013.
Pollution Prevention and Environmental Essentials Conference – 2002 How An EMS Can Enhance Your P2 Program Presented by Mike Garcia.
Measuring Results of Improvement Actions Márcio Rodrigues, Tallin, 13/01/2015.
It was found in 1946 in Geneva, Switzerland. its main purpose is to promote the development of international standards to facilitate the exchange of goods.
TOTAL QUALITY MANAGEMENT
QUALITY MANAGEMENT SYSTEM
Lecture 27 Electronic Business (MGT-485). Recap – Lecture 26 E-Business Strategy: Implementation – Organizational Structure and e-Business The Boundary-less.
Pertemuan 14 Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
Company LOGO. Company LOGO PE, PMP, PgMP, PME, MCT, PRINCE2 Practitioner.
Alex Ezrakhovich Process Approach for an Integrated Management System Change driven.
TC176/IAF ISO 9001:2000 Auditing Practices Group.
1 Quality Management Z SUZSANNA E SZTER T ÓTH R ITA D ÉNES Department of Management and Corporate Economics 1 March 2016.
DOCUMENTATION ISO/IEC 17025:2005 Documentation.
PERFORMANCE MEASURES GROUP 4. DEFINITION PERFORMANCE MEASURES. These are regular measurements of outcomes and results which generates reliable data on.
Applying Lean Principles in Warehouse Operations
7 Design of Work Systems.
SWAMYNATHAN.S.M/TQM-UNIT4/BENCHMARKING
So where in ISO is Process?
UNIT V QUALITY SYSTEMS.
Quality Management Systems – Requirements
Quality Department
ISO 9001:2008 Quality Management Systems
TS Training Presented by: Internal Auditor Training.
Process Auditing Why do people think that this is something new?
TRAIN ADVENTURE ANALOGY
Production and Operations Management
Chapter 7 Process Management.
Presentation transcript:

3. Improvement Methodology “Standards only exist to be superseded by better standards”

“Making continual improvement of products, processes and systems an objective for every individual in the organization”.

1. Operational Analysis of process 2.Application of Process improvement Principles Process Improvement model 4. PDCA 3. Benchmarking FEEDBACKLOOPFEEDBACKLOOP

1. Operational Analysis of a Process This involves breaking the processes in 4 segments: Who? What? How? Where?

Who is performing the task ? Reveals hidden organizational problems Shows division of responsibility and authority Communication issues Skill base and experience Decision making power Technical vitality 1. Operational Analysis of a Process

What task is done ? Helps in redistribution of task Elimination of waste and unnecessary task Proper utilization of skills Consolidation of group activities Elimination of wasted efforts Correct skill deficiencies Task dependencies Time utilization 1. Operational Analysis of a Process

How is the task done ? Simplification of tasks Prioritization of task elements Elimination of excessive delays Eliminating unnecessary transportation Rearrangement of work stations Use of faster methods and tools Change in processing time Work load balancing Performance assessment 1. Operational Analysis of a Process

Where is the task done? Scrapping unwanted tools and equipment Efficient location of work stations Elimination of unwanted transportation Improvement in employee morale Changes in ergonomics Changes in work design 1. Operational Analysis of a Process

1. Operational Analysis of process 2. Application of Process improvement Principles Process Improvement model 4. PDCA 3. Benchmarking FEEDBACKLOOPFEEDBACKLOOP

2. Application of process improvement principles 1. Waste Reduction 2. Process Simplification 3. Cycle-time reduction 4. Process measures 5. Mistake - proofing Process Improvement Principles

Techniques of waste reduction a )Value-added assessment b) Eliminating non-value adding activities c) Minimize checks and inspections d) Minimize administrative tasks e) Minimize storage and transportation activities 1. Waste reduction

Value added assessment Value to customer : First, the customer’s view point should be considered. The customers are only interested in receiving the product or service that satisfies their requirements. All activities that must be performed to cater to the customer’s requirements are value -added activities.

Does the activity add value to the customer ? ? Would any customer care if the activity was not performed ? ? Would any customer object if the activity was not performed ? ? Do the customers appreciate the results of the activity?

Eliminate non-value adding activities Value to business : There are many activities that may not add value from the customer’s point of view. Attending meetings, developing plans, compliance with regulatory guidelines, writing procedures etc are examples of activities that may not add value to the customers, but they do add value to the organization. Each of these activities must be carefully examined.

Minimize checks & inspections Checks and inspections may be necessary in a process, however they do not add value to the process. Each inspection point should be identified and challenged. The next slide lists some questions to use in this challenge.

What if the inspection was eliminated? Would the inspection be missed? What is the potential impact in eliminating the inspection? What potential consequences exist if the inspection is eliminated? What is the likelihood that the inspection would have revealed a problem?

Administrative tasks often result in delays in process time due to excessive paper work, levels of reviews and multiple signatures (mostly by people who, it seems, are never available when needed). Reviews, approvals, signatures, preparing written documentation, making and distributing copies etc needs to be thoroughly reviewed.. Minimize administrative tasks

Minimize storage and transportation activities Sometimes storage and transportation are necessary evils but because they are both non-value adding they should be minimized. The purpose of just- in-time inventory systems to minimize the amount of inventory stored.

Transportation activities are also non-value adding. Often the relocation of single activity can significantly reduce the transportation requirements. Minimize storage and transportation activities

2. Process simplification Simplification means reducing the complexities of process. Simplification can lead to lessor activities and lessor things to go wrong. Process simplification can be done by combining similar activities and by analyzing decision points.

2. Process simplification Efforts should focus on reducing layers of management and structures that cause delays. Outdated systems and procedures need to be evaluated.

3. Cycle-time reduction Cycle-time is the time required to deliver a product or service to a customer. Long cycle-times not only prevent prompt delivery of product/ service to your customers, but also increase costs. One of the best ways to cut down on your cycle-time is to conduct activities in parallel and eliminate unnecessary waste times as demonstrated on the next slide.

1. Activities Performed in serial 2. Activities performed in parallel

If the performance of any system or process is not measured, it can not be meaningfully improved. Quantitative and qualitative measures that address both objective and subjective elements should be implemented. The measures recommended are Revenue per employee, percent defectives, cost of quality, profitability ratios, customer satisfaction index etc. 4. Create and implement performance based measures

Profit Sales Customer satisfaction Purchase price Efficiency variance Build inventory Many improved teams Many unfocused projects Select low price supplier Strategies Performance measures Incorrect performance measures create barriers

Profit Sales Customer satisfaction Supplier quality Cycle-timeCost of poor quality Strategies Performance measures Correct performance measures

5. Mistake proofing Mistake proofing

Mistake proofing is a scientific technique for improvement of operating system including materials, machines and methods with an aim of preventing problems due to human error. The term “error” means a sporadic deviation from standard procedures resulting from loss of memory, perception or motion. Example : Bar codes and bar code readers prevents incorrect billing.

Defect Vs errors It is important to understand that defects and errors are not the same thing. A defect is the result of an error, or an error is the cause of defects as explained below. ErrorDefect CauseResult

Prevention of defects Machine or human error Detect error Take corrective action zero defect Analyze for preventive action CauseIntermediate result End result Modify work procedure to prevent such errors Work Procedure

1. Operational Analysis of process 2. Application of Process improvement Principles Process Improvement model 4. PDCA 3. Benchmarking FEEDBACKLOOPFEEDBACKLOOP

Benchmarking is quality by comparison for achieving better standards. In the global movement today, the competition is increasing at a faster rate, and the only way to improve your relative quality and move upwards is to find out and implement the best industry practices. Benchmarking

Benchmarking processes :- Stages of improvement World Class Recognized as the best. Benchmarked by others even in other sectors Best in Class Exceeds customer expectations,outperforms all competitors and has clear competitive edge Efficient Meets all internal requirements for cost margins, asset utilization, cycle-time and measures of excellence Incapable Is ineffective, inefficient and at the risk of failing. Needs major redesign Effective Satisfies all customer requirements

Benchmarking methodology Benchmarking can be of various types - Competitive benchmarking, product benchmarking, process benchmarking and best practices benchmarking. Whatever be the category chosen by the organization, the benchmarking methodology remains the same in each case. Benchmarking methodology is explained through 5 simple steps in the following slides.

a. Identify processes to benchmark Select processes to benchmark. Measure current process capability. Understand detailed process which needs improvement.

b. Select organization to benchmark Select organizations which perform your process. Compile a list of world class process parameters.

c. Compile the required information Develop a detailed questionnaire to obtain desired information. Obtain the desired information. The information can be obtained from various sources viz: Internet, trade journals, professional associations, benchmarking centers, Industry publications, Industry experts, libraries etc.

d. Analyze gaps Too much information is as bad as too little. Gather and analyze only the information you need to make a direct comparison of performance. Compare like with like - Compare apples with apples and pears with pears. Identify the performance gaps and develop an action plan to close the gaps. Also highlight and quantify the consequences of not closing the gap.

e. Develop an action plan Review observations of the gap analysis. Set new performance standards. Develop an action plan for meeting the new performance standards.

1. Operational Analysis of process 2. Application of Process improvement Principles Process Improvement model 4. PDCA 3. Benchmarking FEEDBACKLOOPFEEDBACKLOOP

4. PDCA

Plan-Do-Check-Act ( PDCA Cycle ):- A four step process for quality improvement. In the first step (PLAN), A plan to effect improvement is developed. In the Second step (DO), the plan is carried out. In the third step ( CHECK), the effects of the plan are observed. In the last step (ACT),Action is taken to carry out the plan after making necessary corrections. This is repeated till the original plan is achieved. PDCA ( Plan-Do-Check-Act )

The PDCA cycle has the advantage of being cyclical - implying that improvement never ceases. Continuous process

Application of PDCA Cycle The ultimate aim of any management system is continual improvement of its performance. To achieve this, Deming’s PDCA cycle of improvement is interwoven in the structure of the new standard.

ACT Implementation of improvement ( Clause 4.1f ) PLAN Identification of sequence, interaction criteria & methods ( Clause 4.1 a,b,c ) CHECK Monitoring, Measurement & Analysis ( Clause 4.1e) DO Implementation of the planning ( Clause 4.1.d) PDCA Cycle applied to ISO 9001:2000 clause 4.1

Deploying Quality Improvement Process Continual improvement process of Quality Management System can be deployed throughout the organization by undertaking PDCA activities at various levels as explained in the subsequent slides.

Application of PDCA at top management level Plan Establish Policy Define Objectives Plan and Provide Resources Define organization structure Plan development of customer focus

Top Management DO Lead by Example Show commitment Communicate Importance of customers throughout Organization Deploy policy throughout Organization Define measurable objectives Delegate

Top Management CHECK Undertake management review to assess: Is the system working for us? Are we meeting objectives? Is our policy being followed? Are our customers happy? How is our business doing? Are we planning anything that could affect the system? (New product line; reorganization etc)

Top Management ACT Incorporate review results into strategic planning Provide for additional resources Reorganize Hire new staff “Convert”, “Sideline” or Fire “non- believers/non-performers”

Department/Section Heads PLAN Establish procedures and instruction for departmental activities Define responsibilities Establish objectives Plan resources including training of personnel Establish communication channel for instructions and feed-back

Department / Section Heads of Functional Units DO Allocate clear responsibilities Provide resources and support Coordinate and harmonize activities Resolve problems

Department/Section Heads CHECK How is my department doing? Are processes under control? What are my employees telling me? Are we meeting customer requirements? Am I meeting my objectives? What are the key problems in my area? How can we improve?

Department / Section Heads ACT Systematic problem-solving (based on importance, risks involved etc) Develop action plans Concentrate on improvement (incremental or “breakthrough” improvements) Review existing procedures, and need for new procedures

Management Representative PLAN Co-ordinate definition of key processes, their sequences and interactions Define needs for documented procedures Co-ordinate preparation of Quality Manual Co-ordinate elaboration of Inter-functional procedures (Document Control, Internal Audit etc) Determine Legal and Regulatory Requirements Coordinate Quality Planning

Management Representative DO Ensure processes are defined & maintained Promote customer focus Facilitate Internal Communication Support line management functions Coordinate Training Activities (with HR) Collate measurement data (Product/ Process/System)

Management Representative Check (Internal Audits) Is everyone managing their processes? Are the customers happy? Is our system working? Are we communicating adequately? How can we improve?

Management Representative ACT Stimulate/co-ordinate inter-functional actions Review Internal Audit frequency Alert Top Management