Feasibility Study Cost Estimates ©2002 Dr. Bradley C Paul.

Slides:



Advertisements
Similar presentations
Doing Order of Magnitude Cost Estimates (C) 2002 Dr. Bradley C Paul.
Advertisements

Mandated benefits Here we want to define the idea of mandated benefits and see what impact this type of benefit has on the market.
Section 3B Putting Numbers in Perspective Reprise Pages
Construction Cost Estimation Michael Mincic Civil Engineering Technology Department 22 February 2007.
Chapter 8 Pricing General Expenses. Introduction The direct costs of a building project include the cost of labor, material, equipment, and subtrades.
Skyscraper Construction
Handling Solution in a Heap Leach ©2009 Dr. B. C. Paul.
McElroy Mine Shaft Explosion Investigation Summary This presentation is for illustrative and general educational purposes only and is not intended to substitute.
Chapter 9 Pricing the Work. Introduction Non-computer estimates are priced in two stages: –Stage one: Prepare a recap by sorting and listing all takeoff.
Blasting Economics ©Dr. B. C. Paul 2009 Note – The example contained in these slides was prepared by the author for use in the courses he instructs. It.
Objectives In the 1 st half of this Module we’re going to cover: The computerized estimating process. How a Contractor comes up with his Material Costs.
Matching An Excavator to Our Trucks ©2009 Dr. B. C. Paul Note – These Slides contain tables and information found in the Caterpillar Performance Handbook.
Composite Functions Consider a person working for a concrete contractor. One of his jobs is to estimate the cost for the product to put in a concrete driveway.
Factored Cost Estimates (With Inflation Indexing) ©2002 Dr. Bradley C Paul.
Profile elevations Sometimes the profile is too steep to illustrate on our profile sheet so we have to break the profile. This partial profile illustrates.
Work Breakdown Structure –Early compilation of significant work items w/ associated cost and schedule considerations –Overview of project –First look.
How to do an estimate. Steps 1) Estimate from bottom up –How you construct the project –Lets you get an understanding of project path –Lets you find errors.
Activities CTC-415. Activity Consumes Time Usually consumes resources (cure time for concrete) Definable start and finish Assignable – V. important –
1 Budget Here we explore the combinations of income and leisure the individual can obtain.
It’s more than adding and subtracting..  Before bidding, the site should be examined for the following:  Distance from the office  Site conditions.
Adjusting a Mine Cost Service Model. A Note About MSOPIT Compatibility Mine Cost Service Expressed Mining Costs as Costs Per tonne of Ore Mined MSOPIT.
CAPITAL COST ESTIMATES INSTALLED EQUIPMENT COSTS.
Profile of the Ore Minerals Recovery Industry ©2011 Dr. B. C. Paul.
Pre-Feasibility Study Cost Estimation Resources ©2002 Dr. Bradley C. Paul.
Itemized Cost Estimates ©2002 Dr. Bradley C. Paul.
Stiffness Ratio Stiffness Ratio = B H / B where B H is Bench Height B is the Burden Target Stiffness Ratios 3 to 4 is normal range > 4 does not improve.
Analysis of Project Economics © Dr. B. C. Paul 2002.
Step 5 Truck Fleet Costs ©Dr. B. C. Paul 2000 Revised 2008 Note – This presentation includes screen shots from the Caterpillar Performance Handbook, Catapillar’s.
BIS Internship Summary Powerpoint Created by BIS Student Cylor Morgan (used with permission)
Construction Cost Estimating Class #2: Concept Estimating Prof. Ralph V. Locurcio, PE.
Construction Math This presentation gives examples of scenarios one would use math in construction situations.
Landscape Business Concepts
BILL OF MATERIALS. BEGINNING THOUGHTS ► IDENTIFY ONE MACHINE THAT YOU WILL USE TO BULID YOUR CONCRETE FLOAT? ► WHY MUST YOU USE A RULER WHILE BUILDING.
Obtaining Information From the Geologic Block Model
An-Najah National University Engineering Faculty Civil Engineering Department Submitted in partial fulfillment of construction project management for the.
Towers. Why worry too much about the tower? Would you put a solar collector in the shade? Wind is the fuel! Remember, 30’ above anything w/in 500’ Measure.
Surface Mining Ore Body Geometry ©2011 Dr. B. C. Paul Note- Concepts given here are considered to be common knowledge to those involved in early stage.
Measurement and Payment. Construction Progress Payments –Contractor gives a bill for progress to RPR Outlines what bill is for Give details as needed.
UNIT: CONCRETE/MASONARY
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
1 Intermediate Microeconomic Theory Labor Supply.
Using Konya’s Method to Identify Blast Design Problems An overview of the Havablast 4 Spreadsheet.
4.01 FORMS OF COMPENSATION / PAY. MONETARY COMPENSATION Wage - The amount of money paid for a specified quantity of labor. Salary - A set amount of money.
Pricing for Profit …… Making sense out of the mayhem… Craig Chase, Field Specialist Farm & Ag Business Management.
Designing Basic Blasting Shots Part I ©Dr. B. C. Paul 2000 Note – The topics covered in these slides represent the author’s summary of information familiar.
Designing Basic Blasting Shots Part II ©Dr. B. C. Paul 2000 Note – The topics covered in these slides represent the author’s summary of information familiar.
Computer Aided Mine Design Part III Cut-Off/Equipment Interactions ©Dr. B. C. Paul 2000 ©Dr. B. C. Paul Summer 2003.
Next Part of Step II Determining Peak Speed ©Dr. B. C. Paul 2000 revised 2008 Note – The methods outlined here are typical of widely known published engineering.
On-Shift Examination Scenario Continuous Miner Section What you will need: Pencil and paper to take notes or perform calculations Calculator to calculate.
Week 2 Senior Design. Critical Findings Workers and their families should be housed in Ruby Alaska – The company should build a dental and medical clinic.
Construction Estimating Using Excel Professor Locurcio CON4003, CVE4073, CVE5073.
Week 9 ©2012 Dr B C Paul. Coal Trouble in the Board Room –Plans to ignore large amounts of met coal and drop mining your low sulfur coal and cut down.
Basic Blasting Patterns ©Dr. B. C. Paul 2000 Note – The concepts contained in these slides represent the author’s view of information commonly held among.
Predicting Fragmentation ©Dr. B. C. Paul 2000 Note – This series of slides portrays the author’s summary of knowledge commonly held by people well studied.
House 18 ft 20 ft Sidewalk is 36 inches wide and 4 inches thick. Driveway is 15 feet wide, 60 feet long, and 6 inches thick. DRIVEWAYDRIVEWAY.
Entering Our Choices into FPC ©2009 Dr B C Paul Note – This slide series contains screen shots of the computer program FPC developed by Caterpillar Equipment.
Costs and Cash Flows Estimation. Engineering Economic Analysis - Seven Steps 1. Recognition and formulation of the problem. 2. Development of the feasible.
Anytime, Anywhere Access Benefits Functionality Work Order Administration Dispatch Work Order Work Order Details New Work Order Additional Functionality.
Riprap Installation Construction Inspection for Field Office Activities Will use Riprap Gradation and Riprap Subgrade Problems from Class Problem Section.
UNIT: CONCRETE/MASONARY Concrete Proportions Modified by Georgia Agricultural Education Curriculum Office July, 2002.
Joseph Uno, LEED AP BD+C J. Uno & Associates, Inc.
2016 Alaska Western Workshop Cost Estimating 101
Escalator Installation
5th FCC Infrastructure & Operation meeting
Department of Navy Money Part 2 (FAR Part 22) 9/20/2018.
Estimating – Overhead, Profit, Margins, & Markups workshop
Department of Navy Money Part 2 (FAR Part 22) 4/13/2019.
Basic Principles of Estimating
Presentation transcript:

Feasibility Study Cost Estimates ©2002 Dr. Bradley C Paul

Feasibility Study n Processes are actually worked out and planned – checked for technical flaws – checked for permit flaws n Format – Pre-feasibility may give you a lot of factored cost estimates – Start Shifting big ones to itemized cost estimates – Itemized estimates become more detailed

Feasibility Study Overviews n Major Cost Items are Identified – Quotes are secured on major cost items – Minor items tend to be listed with general comparison cost estimates attached. n Important error avoid - missing and double counting.

Pre-Feasibility/ Feasibility Contrast n Major Cost Items from Pre-Feasibility move either to Itemized Cost format or are expanded n Example - Our Mine Shaft could easily be a big cost – Advance rate likely to be 8 feet per day using 3 eight hour shifts in solid – Only get 2 feet day through first 200 feet of unconsolidated – Lets Detail the crew

Shafting Crew n Typical Sinking Crew would be 5 people – 4 laborers – 1 supervisor – doing rounds, support ect. (from SERPA) – wages $15.46/hr (1997 base from WMCS) – 4*24*$15.46 = $1,484/day – Time 100 days for first 200 ft n 69 days more for next 550 ft through solid rock – 169 days at $1,484/day = $250,823 – I’ll deal with supervisor later

Support People n Engineering/Technical Crew – 1 person (some would use 2) (3 for 3 shifts) SERPA – $16.15/hr 1997 cost WMCS – $388/day * 169 days = $65,504 n Mechanical Crew – 2 people (6 for 3 shifts) SERPA – $20.98/hr 1997 cost WMCS – $1007/day*169 days = $170,190

Surface Crews n Surface and Yard Workers 2 n Rate $11.89/hr – 2*$11.89*24*169 = $96,452 n Sinking Hoist Operator – $16.50/hr*24*169 = $66,924

Supervisory Crews n 1 supervisor/shift $23.94/hr – $23.94*24*169 = $97,101 n Total Labor Cost – $746,994 say $747,000 n Indexing Labor – $747,000* 17.89/16.15 = $827,500

The Burden of Burden n Workers get fringe benefits – health, vacation time etc. – government mandated programs n social security / medicare / unemployment / workers compensation n Often Expressed as a percentage of wage – Quarries around 30% – Metals commonly around 40% – Some coal may be 60% – WMCS estimates 36% for Shaft Sinking

Dropping the Burden on the Project n $827,500 * 1.36 = $1,125,000 n Explosives Cost – Rounds at 4 lbs/ton – Need to know concrete thickness n have about 15 inch thick (some squeeze for horizontal stress) n for 20 ft finished diameter - need 22.5 feet – with some over-excavation 23 feet – Rock density about 170 lb/ft^3 n 35.3 tons per foot of Advance

Having a Blast n 35.3 tons/ft * 4 lbs/ton = 141 lbs of explosive per foot of advance – 106,000 $1.54/lb = $163,000 n At about 1 round shot/day – 110 caps/day * 169 days = 18,590 caps each = $33,650 n Chord and Supplies about 50% of caps (no boosters here) – $16,824

Breaking Cost n $213,500 for explosives n Drilling Consumables at about 25% of explosives – $53,400 n Breaking Cost (less labor counted elsewhere) – $267,000 n Index to end 2002 – $267,000 * 149.7/149.1 = $268,000

Non-Labor Mucking Costs n At $2.50/ton (include disposal) – 35.3 tons/ft * $2.5 = $88.30/ft – for 750 ft $66,216 (current cost) n Concrete Cost – 23 ft outside diam - 20 ft inside – 3.75 cubic yard per foot of advance – Concrete at $80/cubic yard delivered to site – $225,000 for concrete

Other Supplies n Steel cost at about 1.5 times concrete – $337,500 – includes materials to advance utilities down shaft and put in guides for skips n Concrete and Steel – $562,500 n 10% for misc supplies – $56,250 total n Supplies Subtotal $618,750

Direct Cost of Shaft n Labor $1,125,400 + Breaking $268,000 + Mucking $66,200 + Supplies $618,750 n $2,078,350 n 10% contingency $2,286,200 n 15% contractor mark-up and mobilization – $2,629,000 n Note that we did consider some site specific problems with large amounts unconsolidated Overburden and ground stresses

Pre-Feasibility / Feasibility Contrast n At Order of Magnitude just scaled off of someone elses approximate cost n Pre-Feasibility was either a factored cost estimate or a simple itemized cost estimate (ie cost per foot of shaft) n At Feasibility stage it became a much more carefully itemized exercise – we were still flakey on cost of service lines pipes n As move to Budget Authorization likely bring in contractors to bid specifically on the job