1)Materials Cost 2)Labour Cost 3)Electricity Cost 4)Profit.

Slides:



Advertisements
Similar presentations
Enzyme Stabilized Mud (Earthen) Construction using DBV-1
Advertisements

GCSE Ratio, Scale and Similar Triangles
SHOTCRETING K.V.SUBBA RAO.
ASPHALT & CONCRETE FOR INDOOR FACILITIES Presented by Tom DeRosa.
(1) Delivery Program Shate ● Alloys: ● 5049 AlMg2Mn0,8 ● 5454 AlMg3Mn ● 5754 AlMg3 ● 5086 AlMg4 ● 5083 AlMg4,5Mn0,7 ● 5182 / 5186 AlMg4,5Mn0,4.
Learning Outcome: To improve the image of Cambridge Primary School.
ME31B: CHAPTER TWO BUILDING MATERIALS.
Concrete
How much is your product worth?
What is safe building? Life of a reinforced building lasts 50 to 100 years or longer; Safe building means it will not collapse during span of life; A.
Er. Kashmir Dass M.E. (Hons.) Civil Sr. Lecturer in Civil Engineering, Sant Baba Attar Singh Govt. Polytechnic College, Badbar, Barnala Measurements in.
The Good, the Bad, and the Ugly 2 May 2008 Sacramento, CA Alan Macnab
Spot Welding Quiz Steel Aluminium Copper High Speed Steel 1.Spot Welding is most commonly used to join which material ?
Estimating Waste Week 3 CTC-415. What is waste Waste is material that needs to be supplied but may not be used All material items except steel beams and.
Construction Estimating Using Excel Professor Locurcio CON4003, CVE4073, CVE5073.
Volume and Surface Area. Objectives Calculate the volume of given geometric figures. Calculate the surface area of given geometric figures. Solve word.
Concrete Dry Quantities examples in class Week 3.
CONSTRUCTING A FIVE CABIN LATRINE
HERWG Updates Reporting Status Agencies Registered to date = 44 Update Received for today meeting Agencies = 02 Last update compiled – July.
Chapter 14 Continued.
More about concrete Ag III and IV. Today’s objectives Define properties of hardened concrete Discuss selection of materials for quality concrete.
“Properties of Concrete” Introduction
Concrete Unit 24 Carpentry and Building Construction.
4.7.4 Pumped Concrete Introduction Requirements of Raw Material Mix ratio Design of Pumped Concrete.
Improving engineering productivity APEGGA. Improving Productivity Mega Projects  History  What is needed  How will it be done  Division of Labour.
Concrete Technology Ch8: Proportioning Concrete Mixes Lecture 14 Eng: Eyad Haddad.
SOME COMMON RELATIONS USED IN BUILDING ESTIMATES
By the end of the activity you should be able to: understand how different materials are used in your environment. You should be able to recognise different.
Structures: Design and construction of stream crossings
1.Preliminary model estimation and 2.Actual Model costing Prepared by: Assoc. Prof. Sr Dr. Mastura Jaafar Prepared by: Assoc. Prof. Sr Dr. Mastura Jaafar.
Dividing a Quantity into a Given Ratio
Introduction  Civil Engineering Materials -Concrete, Steel, Pavement  Construction Materials Timber, Glass, Aluminum, Paint, Plastic, Masonry, Ceramic.
Chapter 4 Ordinary Concrete. §4.2 Ingredient of Ordinary Concrete Cement4.2.1 Cement Aggregate Water Concrete Admixture.
PILE CHECK A NEW DYNAMIC PILE TESTING SYSTEM GEORGE GOBLE GOBLE PILE TEST.
Chapter 23: Structural Drafting
 Definition – a comparison of two or more quantities measured in the same units. › The units are not written › Expressed with a (: ) or (/) › Read at.
FOUNDATION ELECTRIC POLES
Bridge Builder With (INSERT DELIVERER’S NAME). Session Aims Understand about the iterative design process Use important skills such as communication and.
How can we help to conserve the environment
 Mix Proportion  Tasks  Basic Requirements  Principle  Steps and Methods  Design of Preliminary Mix  Ascertaining the basic mix proportion  Laboratory.
Measuring Measuring Length, Mass, and Volume. How long is the following? Ans. 7.7 cm.
Estimating Concrete Construction and Material Cost
Rocks and Building 1.5 Cement and concrete. Learning objectives Understand how cement and concrete are produced Understand how cement and concrete are.
Necessary Information Required compressive strength at 28days: 30 Mpa Type of structure: mass concrete, beam, column. Maximum size of aggregate: 20 mm.
CONSTRUCTION SYSTEMS. What Is Construction? Our Constructed World shelter travel.
FUN REVIEW AND EXTEND IDEA……. Volume and Surface Area.
Buy Artistry in Concrete UtahOnlineArtistry in Concrete Utah Buy Artistry in Concrete UtahOnlineArtistry in Concrete Utah.
SOIL MECHANICS AND FOUNDATION ENGINEERING-III (CE 434)
Concrete Concrete Cement Sand Gravel Water.
CONCRETE RATIO.
Bamboo Roofing Sheets.
Mixing our Concrete.
Concrete Strength Testing
Planning and Placing Concrete
Ultra High Performance Concrete (UHPC)
Flood: Build a Stronger Plinth
أهداف المحاضرة مراجعة المفاهيم والعلاقات الأساسية لتحليل العلاقة بين التكاليف والحجم والربح. بناء نموذج لتحليل التعادل في حالة وجود منتج وحيد. بناء نموذج.
SAB 3122 CONSTRUCTION TECHNOLOGY AND ESTIMATING CONCRETE AND REINFORCEMENT Dr. Chai Chang Saar.
G.B.N GOVT. POLYTECHNIC, NILOKHERI
Assumption: in a water / HC mixture, mass fraction is the same as volume fraction. Example 1: 99 kg HC (density 700 kg/m3) and 1 kg H2O (density 1000 kg/m3).
FBE05 – Mathematics and Statistics
Deck Building Assignment
2018 Wauchope Rotary Club, Australian International Partnership Project with Canggu Rotary Club, Bali.
How much is your product worth?
2018 Wauchope Rotary Club, Australian International Partnership Project with Canggu Rotary Club, Bali.
Spot Welding Quiz.
How much is your product worth?
FBE05 – Mathematics and Statistics
Presentation transcript:

1)Materials Cost 2)Labour Cost 3)Electricity Cost 4)Profit

1)Materials Cost 10m 4m 9m 5m concrete Steel pipework Nails Weld electrodes GI sheeting Paint

PipeCost (rupees/m) 0.5’26 1.5’66 2’82 2.5’98 3’164 10m 4m 9m 5m Roof Tension – 1.5’ Roof Compression – 3’ Posts – 3’ Total Length 3’ Pipe = ( x ) + ( x )5m 4m 6 6 = 81m Purlins – 3’ + ( x ) 9m 3 Total Length 1.5’ Pipe = x7m 3 = 21m Total Cost 3’ Pipe = x 81m 164 Rs/m = Rs Total Cost 1.5’ Pipe = x 21m 66 Rs/m = 1386 Rs Total Cost = Rs 1386 Rs = Rs

10m 4m 9m 5m MaterialCost Cement200 Rs./kg Sand245 Rs./m 3 Gravel81 Rs./m 3 Concrete Mix – 1:3:6 Volume: 1.4m 3 Volume cement = x 1/10 = 7m Required Dry Volume = x 1.65 = Bags Cement = / = 7 bags Volume sand = x = 1.4m 3 Volume gravel = x 2.31m m m 3 /50kg bag cement 2.31m 3 3/10 6/ m m m 3 = Cost cement = x 7 bags 200Rs. = 1400Rs. Cost sand = 169Rs. Cost gravel = 113Rs. Total Cost = 1682Rs.

MaterialCost (rupees/m 2 ) GI270 Plastic GI431 10m 4m 9m 5m GI Sheeting Total Roof Area = x x 4m 10m 2 = 80m 2 7m Total Cost Roof = x 270 Rs/m 2 = Rs 80m 2 Total Cost = Rs.

1)Materials 2)Electricity 3)Labour Project Planning Can see when tasks need to be done – saves time Can see who needs to do each task – people always occupied, not bored Can predict and keep track of costs

Time Cost Quality Why things go wrong: Assumptions Bad Planning Bad Communication Wrong leadership Unrealistic timescale No clear aim