1 Development of a Regional BRT System Proposal Presented to the TPB Access for All Committee April 23, 2009 Michael Eichler and Monica Bansal Transportation.

Slides:



Advertisements
Similar presentations
Tysons Tysons Corner Circulator Study Board Transportation Committee June 12, 2012.
Advertisements

1 The Role of Bus Transit in the Regional Transportation, Present and Future Howard Benn, Chair, TPB Regional Bus Subcommittee TPB Regional Priority Bus.
Los Angeles Bus Rapid Transit Tour Lessons Learned.
D2 Roadway Discussion Sound Transit Board September 22, 2011.
1 Presentation to Transportation Planning Board Ronald Kirby, Director of Transportation Planning January 28, 2009 Status Report on Criteria and Process.
Transportation Operations Master Plan John Ward ITS-Pennsylvania Panel Discussion Vision for Achieving Regional Mobility through ITS November 23, 2010.
Capital Investment Program Listening Session Presented at APTA Annual Meeting -- 10/03/2012 RailVolution /14/
OHIO & LAKE ERIE REGIONAL RAIL CLEVELAND HUB STUDY Ohio Rail Development Commission TMACOG Annual Transportation Summit September 29, 2003.
SR 50/UCF Connector Alternatives Analysis Orange County Board of County Commissioners January 13, 2015.
1 Monica Bansal and Michael Eichler Department of Transportation Planning Presentation to the TPB Scenario Study Task Force November 19, 2008 Progress.
Presentation to the AMP Leadership Team Moving forward. April 17, 2013.
Land Use Impacts of Bus Rapid Transit: The Boston Silver Line Victoria Perk, Senior Research Associate National Bus Rapid Transit Institute Center for.
SR520 Urban Partnership Project 2008 ITS Washington Annual Meeting November 12th, 2008 – Seattle Jennifer Charlebois, P.E. Tolling and Systems Project.
1 Status Report on the Bus Systems in the National Capital Region Report of the Regional Bus Subcommittee to the Access for All Advisory Committee April.
1 Example of How Bus Stop Inventory is Used and Issues are Addressed.
1 Presentation to TAC June 17, 2009 Overview of Rapid Bus Measures and Effectiveness And Case Studies.
Less Stop More Go EXPRESS LANES Travel Choices and Strategies to Relieve Congestion Presentation to FDOT’s Annual ITS Working Group Meeting March 2008.
Rapid Transit System Steering Committee Meeting December 4, 2012.
Bus Rapid Transit: Chicago’s New Route to Opportunity Josh Ellis, BRT Project Manager Metropolitan Planning Council.
South/West Corridor Improvements Service and Facility Alternatives September 9, 2014 Planning & Project Development Committee March 3, 2015.
MONTGOMERY COUNTY EXECUTIVE’S TRANSIT TASK FORCE System Design and Attributes Work Group “A” Prepared For: The Rockefeller Foundation Prepared By: Jonathan.
Project Briefing Metropolitan Washington Council of Governments Transportation Policy Board Project Briefing Metropolitan Washington Council of Governments.
Orange County Business Council Infrastructure Committee December 14, 2010 Draft Long-Range Transportation Plan Destination 2035.
Trains are better for our environment than other modes of travel.
1 John B. Catoe, General Manager June 24, 2009 Metrobus’ Priority Corridor Network: An Opportunity for Priority Bus Transit in the Washington Region:
BPAC. “Congestion management is the application of strategies to improve transportation system performance and reliability by reducing the adverse impacts.
1 Michael Eichler Department of Transportation Planning Presentation to the TPB Technical Committee January 8, 2009 CLRP Aspirations Scenario Preliminary.
TRB/APTA 2004 Bus Rapid Transit Conference When is BRT the Best Option? the Best Option? 1:30 – 2:40 p.m. Paul Larrousse Director, National Transit Institute.
Portland North Small Starts Alternatives Analysis Coordination Meeting June 16, 2009.
7 May 2015 Introduction to bus rapid transit. What is BRT? Enclosed and secure stations New, clean, high- capacity buses Pre-board payment with smart.
OPEN HOUSE #4 JUNE AGENDA OPEN HOUSE 6:00 PM  Review materials  Ask questions  Provide feedback  Sign up for list  Fill out comment.
1 Monica Bansal and Michael Eichler Department of Transportation Planning Presentation to the TPB Scenario Study Task Force September 17, 2008 Progress.
Managed Lanes CE 550: Advanced Highway Design Damion Pregitzer.
1 Monica Bansal and Michael Eichler Department of Transportation Planning Presentation to the TPB Technical Committee December 5, 2008 Progress on “CLRP.
Transit Partnerships. Goal of Presentation Review the Transit Partnership Proposal Seek Ordinance Approval: –Authorizing the Mayor to submit Transit Partnership.
Implementation Transit Priority System and Mobile Internet Passenger System in the City of Los Angeles Kang Hu and Chun Wong City of Los Angeles Department.
1 Item 12: Report on Draft Bicycle and Pedestrian Plan for the National Capital Region Michael Farrell TPB Staff Presentation to the Transportation Planning.
Los Angeles County Metropolitan Transportation Authority Overview of Metro’s Transportation Program Pam O’Connor Metro Chair July 25, 2007.
PROJECT UPDATE PUBLIC OPEN HOUSE #3 OCTOBER 17 4:30 PM – 6:30 PM Dakota County Northern Service Center.
1 Monica Bansal and Michael Eichler Department of Transportation Planning Presentation to the TPB Scenario Study Task Force October 15, 2008 Progress on.
1 Presented to the Transportation Planning Board October 15, 2008 Item 9 Metrobus Priority Corridor Network.
Weighing the Scenarios: The Costs and Benefits of Future Transit Service Produced for MTDB by The Mission Group © 2000 by The Mission Group. 1 Dave Schumacher.
Line 22 BRT: Summary Santa Clara Valley Transportation Authority May 2003.
TRB/APTA 2004 Bus Rapid Transit Conference The Results of Selected BRT Projects 2:00 – 3:20 p.m. Walt Kulyk Director, FTA Office of Mobility Innovation.
NEW STARTS/SMALL STARTS. New Starts Eligibility  Based on the results of planning and Alternatives Analysis  At least 50% or more of the total project.
1 Presentation to TAC May 20, 2009 Priority Corridor Network (PCN) Evaluation Project Introduction.
2030 Transit-Oriented Development Scenario: Travel Model Results
TPB CLRP Aspirations Scenario 2012 CLRP and Version 2.3 Travel Forecasting Model Update Initial Results Ron Kirby Department of Transportation Planning.
Federal Funding Challenges and Opportunities David Vozzolo Vice President National Transit Planning and Project Development.
Express/Rapid Bus Opportunities for Priority Bus Transit in the Washington Region Sponsored by National Capital Region Transportation Planning Board Chun.
Federal Funding Strategies Update Internal Working Document Update on Federal Funding California High-Speed Rail Authority In Partnership with: Kadesh.
Transit Signal Priority: The Importance of AVL Data David T. Crout Tri-County Metropolitan Transportation District of Oregon (TriMet) Presented at Transportation.
1 Status Report on the Bus Systems in the National Capital Region Report of the Regional Bus Subcommittee to the National Capital Region Transportation.
The Regional Mobility and Accessibility Study Initial Results of CLRP/CLRP+ Analysis with Round 6.4 Growth Forecasts and Five Alternative Land Use Scenarios.
Board of Supervisors Transportation Committee June 25, 2013 (6/18 presentation draft) Proposed High Quality Transit Network Concept 1.
Lecture 2: Improving Transit Service Through Planning, Design, and Operations This lecture was originally prepared by Dr. Kari Watkins, Georgia Institute.
1 Bus Rapid Transit Strategic Plan May BRT Strategic Plan Evaluate feasibility and effectiveness of six BRT corridors Establish framework for.
GRTC Bus Rapid Transit Project July 17, Agenda 1.BRT Concept 2.Project Goals 3.Project Benefits 4.Project Corridor 5.Proposed Multimodal Access.
BUS RAPID TRANSIT (BRT) PLANNING EFFORTS STATUS 1 Planning & Development Committee April 5, 2016.
Monica Bansal Department of Transportation Planning Presentation to the TPB CAC November 13, 2008 Progress on “CLRP Aspirations” & “What Would it Take?”
SAN FRANCISCO COUNTY TRANSPORTATION AUTHORITY SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Geary Bus Rapid Transit Project Presentation to the San Francisco.
The Partnership between Transportation and Technology Jennifer Mitchell, Director Department of Rail and Public Transportation ITSVA Conference.
2016 APTA Sustainable and Public Workshop COTA’s Role in Smart City Columbus Implementation July 25, 2016 Michael L. Bradley Vice President of Planning.
The TPB What Would It Take Scenario: Meeting Regional Climate Change Mitigation Goals for the Mobile Sector Presentation to MWAQC CAC June 15, 2009 Monica.
Bus Rapid Transit (BRT) ACEC Presentation May 25, 2017
2016 APTA Sustainable and Public Workshop COTA’s Role in Smart City Columbus Implementation July 25, 2016 Michael L. Bradley Vice President of Planning.
D Line Project Overview
I-81 Corridor Improvement Plan
M14A/D Select Bus Service
WELCOMES YOU TO THE COMMUNITY OPEN HOUSE OCTOBER 2018.
Presentation transcript:

1 Development of a Regional BRT System Proposal Presented to the TPB Access for All Committee April 23, 2009 Michael Eichler and Monica Bansal Transportation Planning Board staff Crafting a package of bus-related projects for funding consideration under the American Recovery and Reinvestment Act

2 The American Recovery and Reinvestment Act provides a real regional opportunity Although almost $50 billion in highway and transit transportation funding is mostly formula funding… $1.5 billion in competitive discretionary grants for capital projects What can we propose that would benefit the entire region and compete for these funds?

3 The bill tells us that projects will have to be: 1. National or regional in scope and impact 2. Multimodal 3. Ready-to-go 4. Completed quickly (< 3 years) 5. Relatively low-cost 6. Job creation/Economic benefit Current TPB and other regional initiatives point to bus rapid transit as a wide-reaching, flexible, and reasonable-cost focus for a regional project that could be implemented within a tight timeframe.

4 Beginning with a series of existing regional initiatives that could fit into broad requirements: 1. WMATA Priority Corridor Network (PCN) 2. TPB Regional Bus Subcommittee Priority Bus Project List 3. TPB Scenario Study, CLRP Aspirations Scenario 4.Other state-wide and local initiatives TPB Scenario Study Task Force charged TPB staff with assembling $300-million grant application for a pilot phase of a regional bus rapid transit (BRT) system.

5 Working toward a Regional BRT Network Proposal to use stimulus funding to develop a pilot BRT project – a step towards demonstrating that BRT on a larger regional scale can really happen in the region.

6 What is Bus Rapid Transit?

7 Why BRT for the Washington Region? An implementation of true BRT can: –Increase bus operating speeds –Reduce travel time variability Increasing bus speeds can greatly reduce operating costs, which can provide for increase service levels. The perception of a “new transit system” will: –Raise the perceived level of service for bus passengers –Provide increased levels of mobility across the region

8 How Does BRT Save Operating Costs? Route Distance5miles Headway10minutes Avg. Speed10mph Round Trip Time1hour Buses Needed6.0buses 5miles 10minutes 15mph 0.67hour 4.0buses 5miles 6.67minutes 15mph 0.67hour 6.0buses Before Priority Treatments After, keeping headway the same After, keeping buses the same Increasing the bus speed by 50% results in: –33% reduction in operating costs and capital needs, or –33% reduction in headway with same operating costs.

9 Causes of Bus Delay Running-Way Cause of DelayPrimary SolutionLow-Investment Option High-Investment Option Traffic SignalsTransit PriorityActive or Passive Transit Signal Priority Graded Separated ROW Traffic QueuesRemove Cars from Bus ROWBus Lanes and Queue Jumpers Delay caused by illegal traffic movements, parking, etc.Education, EnforcementBus-mounted Enforcement Cameras Right turns blocked by pedestriansRemove Cars from Bus ROWFar-side bus stops Bus Stops Cause of DelayPrimary SolutionLow-Investment Option High-Investment Option PaymentOff-board paymentSmarTrip Full-service curbside boarding stations Use of front door onlyMulti-door boardingSmarTrip / trust Wheelchair lift operationLevel boarding Low-floor buses

10 Smart Stations SWIFT, Snohomish WA Viva, York ON

11 Regulation of Peak Period Curb-Lane Parking New York City San Francisco

12 Bus Lanes New York City 7 th St NW, DC Boston

13 Enforcement SingaporeLondon

14 Reversible Bus Lanes Connecticut Ave, NW DC Colesville Rd, Silver Spring

15 Queue Jumpers Charlotte Area Transit System (CATS)

16 Transit Signal Priority Viva, York ON

17 Full Dedicated Right-of-Way K St Busway, DC eMX, Eugene OR Los Angeles

18 Cost for BRT Strategies

19 Other requirements for BRT Real-time arrival information –Includes regional real-time arrival prediction database Distinctive identity and branding.

20 Current System

WMATA Priority Corridor Network The WMATA Priority Corridor Network (PCN) proposes to enhance bus service along the top 24 bus transit routes in the region through a combination of service enhancements and running-way improvements

22 Arterial corridors recommended for evaluation in a Phase 1 BRT network eligible for stimulus funding. *

23 Next Steps Continue to develop details on: –Routes for inclusion in plan –Priority treatments for each segment of proposed network Further input provided by committees and task force. USDOT guidelines for proposals released mid May Project proposal due mid November

24 WMATA PCN Corridors