September 24, 2015. Joseph Lynch Government Affairs Manager, Entergy Vermont Yankee (ENVY)

Slides:



Advertisements
Similar presentations
The Entergy facility is a boiling water reactor with a rated core thermal power level of 1912 MW, providing a gross electrical output of 620 MW. The facility.
Advertisements

THE STANDARDS DEVELOPMENT PROCESS STEP 1 PUBLIC AND COMMITTEE PROPOSAL STAGE PUBLIC AND COMMITTEE PROPOSAL CLOSING DATE FIRST TECHNICAL COMMITTEE MEETING.
BoRit Superfund Site Timeline
Floyd County Board of Commissioners Special Town Hall Meeting Topic: Update on status of Georgetown WWTP.
Vermont Yankee Presentation to VSNAP 7/17/13 VY/Entergy Fukushima Response Update Bernard Buteau.
February 26, August 27, 2013 Entergy announces it will cease operations December 29, 2014 Permanent Shutdown April 2016 Implement.
RIVER RANCH ORGANICS AN ENFORCEMENT ODYSSEY. Parvaneh Byrth Riverside County LEA Phone:
Cyber Security Plan Implementation Presentation to CMBG Glen Frix, Duke Energy June 20,
US NRC Protective Action Recommendation Study National Radiological Emergency Preparedness Conference April 10, 2008 Las Vegas, NV Randy Sullivan, CHP.
Overview of State Decommissioning Activities April & May 2015 (Mostly from a VT Public Service Department Perspective) Presented by Tony Leshinskie, VT.
NRC Decommissioning Activities for the San Onofre Nuclear Generating Station Bruce A. Watson, CHP Chief, Reactor Decommissioning Branch Division of Decommissioning,
Setting the Stage: Review of 2013 IEPR Nuclear Recommendations Danielle Osborn Mills Former Senior Nuclear Policy Advisor to the California Energy Commission.
Federal Energy and Environmental Regulation Agencies and Laws
Nunavut Water Board (NWB) NWB’s Community Session Presentation for Type “A” Licence 1AR-NAN0914 Renewal-Amendment Application 1 October 8 - 9, 2014 Public.
Prepared by National Flood Services Flood Insurance It’s more than just a lender requirement – don’t get left behind… 1.
Federal Emergency Management Agency Radiological Emergency Preparedness Program Region I, Boston September 10, 2012.
Sector Planning Process Alachua County Commission July 8 th,
Update On 2000 Bureau of State Audits Report Item L; March 10, 2003 Permitting & Enforcement Committee Item J; March 12, 2003 Budget & Administration Committee.
California Energy Commission James Madigan April 27, 2015.
Overview of Regulatory Changes, Policy and Implementation Colleen Brisnehan Colorado Department of Public Health And Environment Hazardous Materials and.
Water Supply Planning Initiative State Water Commission November 22, 2004.
VERMONT YANKEE Transitioning into SAFSTOR ​SEPTEMBER 2, 2015 Paul Paradis Director Decommissioning.
Kathy Alexander, Ph.D. Technical Specialist Water Availability Division Texas Commission on Environmental Quality.
August 4,  Vermont Yankee Nuclear Power Station (VYNPS) ceased power operations on December 29, 2014 after 633 days of continuous power operation.
Radiological Emergency Response Plan (RERP) Emergency Planning Overview- Now and in the Future Vermont Division of Emergency Management and Homeland Security.
Presented by: Yolanda Chavez, RN, BSN Policy Rules and Curriculum Development Unit DADS Regulatory Services 1 DADS REGULATORY UPDATE March 2013.
Policy Research Shop Support for the Policy Research Shop is provided by the Fund for the Improvement of Postsecondary Education, U.S. Department of Education.
1 LICENSING A U.S. GEOLOGICAL REPOSITORY WILLIAM BORCHARDT Executive Director for Operations U.S. Nuclear Regulatory Commission.
Energy for the Future Belene Nuclear Power Plant Project Status.
Presentation to the HELLENIC MEDITERRANEAN PANEL HELLENIC MEDITERRANEAN PANEL (Athens, Greece - 23 October 2008)On US DISCHARGE STANDARDS -The NPDES Program-
February 26, Joseph Lynch Government Affairs Manager, Entergy Vermont Yankee, LLC (ENVY)
N O L UTI O NS OI ZS LLC An EnergySolutions Company Zion Status Update for Zion Community Advisory Panel. John Sauger – General Manager June 8, 2015.
MODULE “PREPARING AND MANAGEMENT OF DOCUMENTATION” SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo da Vinci”
Overview of State Decommissioning Activities September 2015 Tony Leshinskie VT State Nuclear Engineer September 24, 2015 NDCAP Meeting.
Community Development Department Comprehensive Plan Amendment & Development of Regional Impact Settlement Agreements & Remedial Amendments.
Licensing of a Potential Geologic Repository at Yucca Mountain Lawrence Kokajko, Director Division of High-Level Waste Repository Safety U.S. Nuclear Regulatory.
1 Status of Ongoing Rulemakings and Safety Culture Update Deborah Jackson, Deputy Director Division of Intergovernmental Liaison and Rulemaking OAS Annual.
Status of Ongoing Rulemakings OAS Annual Meeting August 29, 2012 Deborah Jackson, Deputy Director Division of Intergovernmental Liaison and Rulemaking.
November 4,  Vermont Yankee Nuclear Power Station (VYNPS) ceased power operations on December 29, 2014 after 633 days of continuous power operation.
November 12,  As of September 30, 2015, the ENVY NDT Balance was $595,733,175 ◦ Changes in the NDT are due to market losses/gains, reimbursement.
November 12, Joseph Lynch Government Affairs Manager, Entergy Vermont Yankee (ENVY)
NRC Lessons Learned Steve Barr Senior Emergency Preparedness Inspector Region I US Nuclear Regulatory Commission 2008 NRC Region I Joint Exercise Scheduling.
After-the-Fact Conservation Area Impact Permit Request* Keene’s Pointe Community Association, Inc. District 1 November 1, 2011 *Postponed from the December.
RESPONSIBLE – ACCOUNTABLE – TRANSPARENT – DEMOCRATIC Overview Of CAN-NIRS Comments Tim Judson Nuclear Information & Resource Service Contact: (301)
Vermont Yankee- The Last Yankee Standing Bev Good Entergy Nuclear- Sr. Project Manager Boston, MA July 29,
N O L UTI O NS OI ZS LLC An EnergySolutions Company Zion Status Update for Zion Community Advisory Panel. John Sauger – General Manager February 22, 2016.
Vermont Public Service Board Certificate of Public Good Review Process Vermont Public Service Department Aaron Kisicki May 28, 2015 NDCAP Meeting.
Decommissioning San Onofre
“Status of the ReACTOR Decommissioning Program” October 7, 2016 LLW Forum Ted Smith, Project Manager Reactor Decommissioning Branch Division of Decommissioning,
Emergency Preparedness During Decommissioning
Vermont Yankee Decommissioning Update
Janet R. Schlueter Senior Director, Radiation and Materials Safety
NRC’s Decision Process: Judging The Safety Of A Proposed Repository
Updating the NRC’s Alternative Disposal Request Guidance Document
LLW Forum Meeting October 16, 2017 Alexandria, Virginia
Joseph D. Anderson, Chief
NRC Export and Import Licensing 10 CFR Part 110
CR3 and Crystal River Energy Complex
Robert Kahler Branch Chief
Overview of NRC Low-Level Waste Activities and Initiatives
NRC’s Ongoing Rulemaking Activities: Recent Developments and Path Forward April 17, 2018 Spring 2018 Low-Level Waste Forum San Francisco, CA Maria Arribas-Colon,
SONGS Past, Current, and Future State May 4, 2016
Possible Transition from Operating to Decommissioning
Julie Woosley, Division of Waste Management
Temporary Rulemaking for 15A NCAC 02L Section .0400
Decommissioning Rulemaking
Alaska Roadless Rulemaking
Julie Woosley, Division of Waste Management
November , 2018 State Roundtable Reports Pennsylvania
Nuclear Decommissioning Citizens Advisory Panel (NDCAP) Certificate of Public Good (CPG) – Second ISFSI Pad & New 200 kW DG May 28, 2015.
Presentation transcript:

September 24, 2015

Joseph Lynch Government Affairs Manager, Entergy Vermont Yankee (ENVY)

3  Decommissioning Preparation Activities ◦ System Draining/Lay-Up (50 Systems/16 Complete/5 In Progress) ◦ Building Power and Services Removal – Ongoing  Security Plan Changes ◦ Phase 1 and Phase 2 Modifications - Complete  Emergency Plan Drill – October 21, 2015 ◦ Part of ongoing training and Emergency Response Organization (ERO) qualifications.  NRC Inspection Activities ◦ On-Site Inspection completed the week of 9/14-9/17 ◦ Inspection scope informed by the NRC Decommissioning Program ◦ Debriefed with no issues identified

 NRC Licensing Action/Exemption Status ◦ Emergency Plan (E-Plan) Submittals made to date:  Post-Shutdown E-Plan License Amendment Request (LAR) – Implemented 2/5/15. Covers SAFSTOR Period 1 - Plant Shutdown to April 2016  State filed appeal to Commission to keep ERDS in service – February 9, 2015  Commission decision – 4Q15 to 1Q16 (6-12 months)  EP Exemption Requests – NRC Commissioners voted to grant exemptions on March 2, 2015 (supports Permanently Defueled E-Plan and EALs)  State filed petition for reconsideration of Commission vote – March 12, 2015  Commission decision on petition for reconsideration – 4Q15 (6)  Permanently Defueled E-Plan and Emergency Action Levels (EALs) LAR – Approval requested in late Covers SAFSTOR Period 2 - April 2016 to All Fuel in Dry Storage  State filed petition to intervene/request for hearing before the ASLB – February 9, 2015  ASLB decision denying request for hearing – May 18, 2015  State appeal of ASLB decision to NRC Commission – June 12, 2015  Commission decision – 1Q16 to 2Q16 (6-12 months) 4

August 27, 2013 Entergy announces it will cease operations December 29, 2014 Permanent Shutdown April 2016 Implement Permanently Defueled Emergency Plan September 23, 2013 Entergy submits notification of intent to cease operations to the NRC January 12, 2015 Fuel permanently removed from reactor vessel Commercial Operations began in February 5, 2015 Implement Post-Shutdown Emergency Plan SAFSTOR I SAFSTOR II ISFSI 2020 Implement ISFSI Emergency Plan

 Emergency Plan Funding – SAFSTOR II ◦ Commensurate with reduced risk and events limited to Spent Fuel storage. ◦ Consistent with the Permanently Defueled E-Plan and new Emergency Action Levels (EALs).  Offsite emergency measures are consistent with all hazards planning approach  Emergency Planning Zones (EPZ)  Within Plant Site Boundary commensurate with risk  Unusual Event and Alert Classifications ◦ Focused on local support, populations and a declining funding scale. ◦ State of NH recently signed to a 4-year agreement (FY17-FY20) for a total cost of $279K (EP and DOH) ◦ ENVY has been contacted by MA to discuss long-term EP funding.

 NRC Licensing Action/Exemption Status ◦ Nuclear Decommissioning Trust (NDT) License Amendment Request (LAR)  Entergy filed this LAR to change the current requirement in the ENVY Operating License for providing NRC a 30-day notification prior to withdrawals to the NDT.  State filed petition to intervene/request for hearing before the ASLB – April 20, 2015  State filed motion to add new and amend existing contentions – July 6, 2015  ASLB decision to allow hearing request for 2 of 5 contentions – July 31, 2015  After a review of options, EVY has decided to withdraw the LAR.  ENVY will continue to comply with its existing license conditions and will continue to provide notifications to the NRC at least 30 days in advance of any withdrawals from the trust fund. ◦ Commingled Funds Exemption  Approved and issued by the NRC - June 17, 2015  State, GMP and VYNPC petitioned the D.C. Circuit for review of NRC’s issuance of the commingled funds exemption – August 13, 2015  Entergy filed a motion to intervene – September 2,

 Vermont State Agency Interactions ◦ Public Service Board (PSB) – Second ISFSI Pad CPG  Filed supplemental pre-filed testimony in May 2015 to explain results of additional soil analyses, update pad construction schedule, revise plans for security diesel generator, and revise dry storage funding plan.  Intervention was granted to New England Coalition (NEC), Windham Regional Commission (WRC),and the Town of Vernon.  PSB issued order limiting scope of NEC’s, WRC’s, and Vernon’s participation in proceeding in July  Impacts on the local environment,  The reuse of the Vermont Yankee property,  Regional planning, and  Aesthetics.  Completed first two rounds of discovery in July  Pre-filed testimony received from DPS, ANR, WRC, and NEC in August  Entergy discovery requests issued to ANR and WRC on September 2,

 Vermont State Agency Interactions ◦ Public Service Board (PSB) – Second ISFSI Pad CPG (Con’t)  Entergy filed an Objection to Admission of Pre-filed Testimony of Mr. Ray Shadis on Behalf of NEC – September 18, The basis for the Objection: 1)Addresses issues that are irrelevant to the CPG proceeding; 2)Exceeds the limited scope of intervention allowed by the PSB; and 3)Addresses areas that are preempted by federal law.  Responses to Entergy’s discovery requests due – September 30, 2015  Approval expected in May ◦ Department of Health (VDH)  Response to April 2, 2015 Request For Information (RFI) provided to VDH on April 22nd, regarding questions on lead and asbestos as well as offer to meet to discuss any questions. 9

 Vermont State Agency Interactions ◦ ANR/Department of Environmental Conservation – Waste Management  Site Visit/Inspection on May 18, 2015 noted issues/observations with labeling, waste characterization and inventory records.  Received a Notice of Alleged Violation (NOAV) from ANR with a 35-day response provided on September 9th. All issues have been corrected.  Received letter from ANR Waste Management & Prevention Division on July 31, 2015 seeking written assurance that ENVY will comply with the Vermont Hazardous Waste Management Regulations (VHWMR).  ENVY has and will continue to be compliance with all State of Vermont Regulations. ◦ ANR – River Corridor & Floodplain Protection Program  New State program (effective March 2015) that regulates new development in flood hazard areas and river corridors.  ANR has been consulted by ENVY for applicability of the regulations as it pertains to the second ISFSI pad because it is new development may be located within the Connecticut River corridor. 10

 Nuclear Decommissioning Citizens Advisory Panel (NDCAP)  Stakeholder Outreach: Speaking Engagements, Community Involvement, and Facility Tours  SAFSTOR Matters – Monthly Cable TV Show  Vermont Yankee Decommissioning website: 11

 SAFSTOR Matters – Monthly Cable TV Show ◦ Episode 6 – Maine Yankee Public & Government Relations Manager, Eric Howes - Decommissioning process at Maine Yankee 12