DUSEL Experiment Development and Coordination (DEDC) Internal Design Review July 16-18, 2008 Steve Elliott, Derek Elsworth, Daniela Leitner, Larry Murdoch,

Slides:



Advertisements
Similar presentations
Sponsored by the National Science Foundation GENI-Enabling Universities GENI Engineering Conference July 10, 2012 Larry Landweber GENI Project Office.
Advertisements

Pre- Conditioning course Prepared by DP Venter from pre-conditioning booklet as well as AEL presentation slides.
UNO R&D and  UNO Possible early use of Henderson Upper Campus UNO collaboration has submitted an R&D proposal covering Excavation R&D of large caverns.
May 2013 Mass Report Generation Managing High Volume Reporting.
DUSEL Experiment Development and Coordination (DEDC) Internal Design Review July 16-18, 2008 Steve Elliott, Derek Elsworth, Daniela Leitner, Larry Murdoch,
1 Partnering Presented at JUSTSAP/PISCES 2008 Collaboration with Colorado School of Mines.
Dark Universe: Dark Matter, Dark Energy and the Fate of the Universe.
1 st ITRUS meeting, 1 st ITRUS meeting, Paris 30 June 2009 TUC Slide 1 of total 9 Technology Innovation in Underground Construction Sixth framework program.
DUSEL Experiment Development and Coordination (DEDC) Internal Design Review July 16-18, 2008 Steve Elliott, Derek Elsworth, Daniela Leitner, Larry Murdoch,
Transparent Earth/Seismic Imaging Team Steven D. Glaser, working group herdsman Towards the full Homestake Transparent Earth Observatory – installation.
Henderson DUSEL Physics & Geoscience Workshops Lee Petersen, CNA Consulting Engineers Greg Hulne, Miller Dunwiddie Dale Holland, Dunham Associates.
Illinois Network for Science Undergraduate Research Experience (INSURE) National Science Foundation Undergraduate Research Center Site Visit May 3, 2004.
Transponder Beacons Control Box Head Mounted Display Inertial Sensor The IS600 Tracking System Ultrasonic Coordinate Base.
Site investigations and intrusive ground investigations
Rock Coring Obtain undisturbed samples of solid, fractured, or weathered rock formations.
DUSEL Working Group #9 Preliminary Outline by François Heuzé & Jean-Claude Roegiers Blackburg, Virginia – Nov
Geosciences in an Underground Laboratory:
Town of Hamilton Community Information Meeting For Well Harmony Intermediate School May 13, 2010.
CSM/CNA UNO R&D Proposal Lee Petersen –CNA Consulting Engineers Mark Kuchta –Colorado School of Mines Requested budget: $200k/year for two years Cavern.
2 Located within the Naval Petroleum Reserve No.3 (NPR-3), RMOTC –Operates in an oil field environment –Explores solutions to energy issues –Demonstrates.
Unconventional Rod Nelson Schlumberger IPAA 75 th Annual Meeting Oct 28, 2004.
John N. Dougherty, PG Lisa Campbell, PG EPA Region 2, New York City
Deep Underground Science and Engineering Lab Hamish Robertson for the DUSEL S1 P/Is: E.W. Beier, C. Fairhurst, T.C. Onstott, R.G.H. Robertson, B. Sadoulet,
Induced Slip on a Large-Scale Frictional Discontinuity: Coupled Flow and Geomechanics Antonio Bobet Purdue University, West Lafayette, IN Virginia Tech,
National Science Foundation Publishable Glass Research with Undergraduates Steve A. Feller, Coe College, DMR Annually, 25 undergraduates from Coe.
DUSEL Experiment Development and Coordination (DEDC) Internal Design Review July 16-18, 2008 Steve Elliott, Derek Elsworth, Daniela Leitner, Larry Murdoch,
Improving the knowledge of carbon storage and coal bed methane production by in situ underground tests HUNOSA:N. C ANTO A. G ONZÁLEZ,
Laughton 7/04 Long Baseline Neutrino Program Tunneling Chris Laughton, Fermilab.
UNO Cavity Liner System: Status Report and R&D Proposal D. Warner Colorado State University October 16, 2004.
Monitoring and Protecting Groundwater During Oil & Gas Development Overview of Colorado Aquifer Systems November 26, 2012 Christopher J. Sanchez, P.G.
The Role of Groundwater Sampling/Monitoring COGCC Proposed Rule 609 University of Colorado Law School Nov 26, 2012.
1 DUSEL and Gravitational Waves Vuk Mandic University of Minnesota 03/17/08.
U.S. Department of the Interior U.S. Geological Survey Ground-Water Monitoring in the Lake Michigan Basin Lake Michigan Monitoring Coordinating Council.
History and Cleanup at Chemical Commodities, Inc. Jeff Field US EPA Region 7 1.
Physical Characteristics and Constructability Bill Roggenthen and Herb Wang Homestake DUSEL April 20, 2007.
Rock Mechanics/Geophysics Larry Costin, Sandia National Labs Paul Young, University of Toronto Discussion Points November 12, 2004 DUSEL Workshop.
Fraser Duncan Queen’s University Synergies in Low Background Techniques 26 July 2005 Underground Facilities at SNOLAB.
ARMA-NSF-NeSS Workshop Some Needs and Potential Benefits Related to a National Underground Science Laboratory NUSL–Geo-Hydrology–Engineering-Team Overview.
Workshop on the draft General Permit for Discharges of Storm Water from Small MS4s Fresno August 6, 2002 Redding August 8, 2002 San Luis Obispo August.
OVERVIEW OF OIL & GAS EXPLORATION, DEVELOPMENT and STATE REGULATION OVERVIEW OF OIL & GAS EXPLORATION, DEVELOPMENT and STATE REGULATION February 18, 2012.
Peabody Coal Lower Basin Pipeline Engineering Appraisal Study Bureau of Reclamation September 18, 2002.
Pre-Excavation Rock Evaluation 1)Goal- Excavate the largest possible safe and stable detector chamber 2) Procedure a) measure characteristics of the rock.
Abstract Traffic accidents often occur when a major athletic event or concert is held at Iowa State University. This is a result of drivers not being able.
A Large Block Test to Study the Energetic Failure of Rock – Application to Rock-Bursting and Earthquake Mechanics Maochen Ge, Eliza Richardson, Chris Marone,
National Science Foundation Publishable Glass Research with Undergraduates Steve A. Feller, Coe College, DMR Annually, 25 undergraduates from Coe.
DUSEL Experiment Development and Coordination (DEDC) Internal Design Review July 16-18, 2008 Steve Elliott, Derek Elsworth, Daniela Leitner, Larry Murdoch,
May 27-30, 2008 Nuclear Physics at NSF Research and Education –200+ faculty –80+ postdocs –200+ graduate students –150+ undergraduates University facilities.
ILIAS Project Summary ILIAS is an Integrated Infrastructure Initiative that has pulled together all of Europe's leading infrastructures in Astroparticle.
B.Sadoulet CDMS DUSEL The Deep Underground Science and Engineering Laboratory The process Themes DUSEL and CDMS Bernard Sadoulet Dept. of Physics.
DUSEL Interdisciplinary Science Studies: Biology, GeoScience and Derek Elsworth, Larry Murdoch, TC Onstott, Duane Moser, Joe Wang.
IAEA International Atomic Energy Agency Presenter Name School of Drafting Regulations for Borehole Disposal of DSRS 2016 Vienna, Austria Procedures and.
Deep Underground Science and Engineering Laboratory at Homestake1 Richard DiGennaro, LBNL DUSEL Project Manager 20 June 2008 Facility Planning for DUSEL.
IAEA International Atomic Energy Agency Presenter Name School of Drafting Regulations for Borehole Disposal of DSRS 2016 Vienna, Austria Siting Strategies.
Dr. T.N.Singh Professor Rock Mechanics, Natural disaster, Climate change, Mining Research, Surface Mining.
Homestake DUSEL Project Management and Systems Engineering Richard DiGennaro LBNL April 20, 2007.
DUSEL Development Process: The Roadmap from Science & Engineering Plan to the Facility Description Lee Petersen CNA Consulting Engineers.
Opportunities for Geomicrobiological Characterization and Experimentation During DUSEL Site Selection and Development “ProtoEarthLab”? Tom Kieft, New Mexico.
Hydraulic Fracturing (Fracking)
 All civil engineering projects like dams, reservoirs etc. constructed on earth crust and constructed by material obtained from the crust.  So it is.
ANT11 Presentation, October, 10-13, 2011 David Vardiman Project Engineer Geotechnical Design and Excavation 1 Sanford Lab at Homestake, Lead, SD 4850L.
“Megaton” Cerenkov Detector - Excavation Kenneth Lande, Univ. of Pennsylvania 4200 mwe Depth.
Geotechnical Investigation
By Alex Milev, Steve Spottiswoode and Thabang Kgarume
Real time stress change estimation using strain measurements
Mining removes rocks and minerals that contain useful metals from the Earth’s crust. Image: G. Plumlee, USGS Metals-2-1.
Marcellus Well Pad Constructability
Department of Civil Engineering
Use of Joint Trace Plots to Evaluate Stability of Mining Excavations
Mining removes rocks and minerals that contain useful metals from the Earth’s crust. Image: G. Plumlee, USGS Metals-2-1.
DUSEL Experiment Development and Coordination (DEDC) Internal Design Review July 16-18, 2008 Steve Elliott, Derek Elsworth, Daniela Leitner, Larry Murdoch,
Presentation transcript:

DUSEL Experiment Development and Coordination (DEDC) Internal Design Review July 16-18, 2008 Steve Elliott, Derek Elsworth, Daniela Leitner, Larry Murdoch, Tullis C. Onstott and Hank Sobel

Homestake DUSEL Initial Suite of ExperimentsDUSEL Experiment Development and Coordination Underground Construction & Mining Cavern Design (16) H. Einstein (MIT), A. Bobet, L. Pyrak-Nolte (Purdue University), C. Laughton (FERMI Lab), M. Kuchta (Colorado School of Mines), W. Pariseau, J. Donovan (University of Utah), M. Mauldon (Virginia Tech), U. Ozbay (Colorado School of Mines), F. Tonon (University of Texas, Austin), R. Sousa (Lachel, Felice and Assoc), G. Callahan (RESPEC), P. Kulatilake (University of Arizona), E. Asa (North Dakota State), J. Rostami (Penn State),S. Glaser (UC Berkeley) Cavern Production (17) P. Cundall, C. Fairhurst (UMN/Itasca), J. Furtney (Itasca), E. Detournay, B. Guzina, J. Labuz, S. Mogilevskaya, R. Ballarini (UMN), R. Jeffrey (CSIRO), L. Petersen (CNA Engineers), H. Huang, L. Germanovich (Georgia Tech), M. Kuchta (Colorado School of Mines), Z. Hladysz (SDSM), M. Ge, D. Elsworth (Penn State), C. Dowding (Northwestern) Petersen 1999

Homestake DUSEL Initial Suite of ExperimentsDUSEL Experiment Development and Coordination Science Objectives: (i) fully integrate knowledge into the design and construction of a cavern (ii) develop and control fracture of rock through preconditioning and blasting studies Why DUSEL? Large in-situ stress, fractured rock mass, and large scale excavation Chen & Labuz 2006

Homestake DUSEL Initial Suite of ExperimentsDUSEL Experiment Development and Coordination Science Why is it important to do these experiments? The community will have access to underground facilities dedicated to fundamental research on completing engineered structures—preventing failure of the rock mass—and on controlling underground operations for removal of rock and production of resources— promoting failure of the rock. Expected results and their significance: Provide design guidelines for the large scale Excavate quickly, efficiently, and controlled

Homestake DUSEL Initial Suite of ExperimentsDUSEL Experiment Development and Coordination Proposed Experiments (Describe A+ Experiments in multiple slides: maybe 1 to 5 slides) Cavern Design Predesign Construction Long-term performance

Homestake DUSEL Initial Suite of ExperimentsDUSEL Experiment Development and Coordination Proposed Experiments (Describe A+ Experiments in multiple slides: maybe 1 to 5 slides) Cavern Production: Preconditioning & hydraulic fracturing (quasi-static load) Optimization of blasting (dynamic loading)

Homestake DUSEL Initial Suite of ExperimentsDUSEL Experiment Development and Coordination Proposed Experiments (Describe A+ Experiments in multiple slides: maybe 1 to 5 slides) The experiments will consist of several stages: 1. Analyses of fracture treatments 2. Characterization of local conditions 3. Installation of monitoring sensors 4. Mobilization of fracturing equipment 5. Fracturing / blasting and response 6. Post-fracture characterization 7. Mine through and mapping 8. Analytical and numerical modeling 9. Supporting laboratory experiments 10. Education and outreach E26 E48 Surface RL 10280m Undercut level RL 9700m Previous Mine through site

Homestake DUSEL Initial Suite of ExperimentsDUSEL Experiment Development and Coordination Facility Needs Facilities Rock volume that will be mined; approx 25 x 25 x 25 m Main fracturing pump, 50 MPa and 300 liters per minute Water supply of 10,000 liters per fracture 10 boreholes for monitoring ahead of the fracture 12 holes, 10 m deep, tiltmeters Microseismic array able detect to -3 magnitude events 6 boreholes for cross hole tomography Digital photogrammetric system

Homestake DUSEL Initial Suite of ExperimentsDUSEL Experiment Development and Coordination Facility Needs E&O Virtual lab Demonstration of instability—toy load frame Potential Problems Drilling and rig delays Poor hole quality from high stress Mine through carried out too quickly, not allowing full mapping and sampling

Homestake DUSEL Initial Suite of ExperimentsDUSEL Experiment Development and Coordination Schedule Development Needs Common access to Vulcan, the database and display system containing existing Homestake mine data S-4 activities Workshops Site visit Prelim modeling Hydraulic fracture Natural fracture