Eng 1181 College of Engineering Engineering Education Innovation Center Marble Delivery System Introduction Lab 1.

Slides:



Advertisements
Similar presentations
EG1003: Introduction to Engineering and Design
Advertisements

EG1003: Introduction to Engineering and Design Renewable Energy Lab.
Engineering H193 - Team Project Gateway Engineering Education Coalition Spring Quarter 2006 P. 1 Today and the Week Ahead Week 3 Day 1.
Teacher/Mentor Institute SoCo State 2015 Season and Demographics Jenn Swanson June 2, 2015.
Warm-up 2.5 The Normal Distribution Find the missing midpoint values, then find mean, median and standard deviation.
Solar Energy Labs – Part 1 ENGR Today's Learning Objectives  After today's class, students will be able to: Describe and build both a calibration.
Projects CE 311K Introduction to Computer Methods.
EXPECTATIONS, USE, AND ABUSE HALL PASSES. HALL PASS EXPECTATIONS Every student is expected to have a yellow hall pass. All students are expected to bring.
Solar Energy Labs – Part 1 ENGR Solar Meters in the Real World A real world application of using solar light to generate power is describe in this.
First-Year Engineering Program Advanced Energy Vehicle Performance Test 4: Final Test.
Solar Energy Labs – Part 2 ENGR Solar Cells in the Real World Solar panels are becoming commonplace. We’re most familiar with fields or rooftops.
Wind Turbine Lab (Part A)
APSU Jack Hunt STEM Center Martha McIlveene, PhD Director
Circuits Lab ENGR 1181 Lab 3.
ITIS  Today’s Notes  Misc.  Lab Schedule  Team Project  Big Hint!  Lecture: Connections  Lab 1.
Circuits Lab ENGR 1181 Lab #3. Circuits in the Real World Many engineering fields and products require the use of circuits. Some are more complicated.
Engineering H191 - Drafting / CAD Gateway Engineering Education Coalition Lab 1P. 1Autumn Quarter Marble Carrier Lab 1.
The Guide to Your ISN Anthony’s Guide to Your Personal Organizer for this Class!
Beam Bending Lab ENGR 1181 Lab # 6.
EARLY RELEASE ROSEBURG PUBLIC SCHOOLS-ELEMENTARY 1 ST TRIMESTER-2013 PLEASE SIT IN MIXED GRADE LEVELS! Fractions-Part 2.
Engineering H193 - Team Project Gateway Engineering Education Coalition P. 1 Spring Quarter Work Day Check Robot Against Budget Work on Oral Report Work.
Circuits Lab Introduction
College of Engineering ENGR 1181 Engineering Education Innovation Center Quality and Productivity Lab.
Circuits Lab ENGR 1181 Lab 3. Circuits in the Real World All engineering fields employ electronic circuits – electric cars, biomedical devices, computers,
Quality and Productivity Lab ENGR Q&P in the Real World Many industries use assembly lines to speed up production, reduce costs, and improve safety.
Tuesday, October 5 th Please collect your science notebook in the back of the room before class starts! How do you eat an Oreo cookie? Do you bite into.
Solar Energy Lab 1 ENGR Today's Learning Objectives  After today's class, students will be able to: Describe and build both a calibration and solar.
College of Engineering Solar Energy Meter Lab 4 Engineering Education Innovation Center ENGR 1181.
ENGR 1181 College of Engineering Engineering Education Innovation Center Solar Cell Lab 5 Intro.
College of Engineering Problem Solving Lab Final Build & Testing Lab – Problem Solving C Engineering Education Innovation Center ENGR 1181.
First-Year Engineering Program Solar Cell Lab Investigation of Solar Cells How Solar Cells work Understand different characteristics and their impact on.
Example 1 Understanding and Planning The table shows the biking and running speeds (in meters per minute) for both you and your friend. Who has the better.
Beam Bending Lab Introduction
Magnetic Levitation Competition
Matching Functions with their Derivatives
Engineering 1182 College of Engineering Engineering Education Innovation Center Inclined Surfaces in Orthographic Projection Sections of Text.
VI-D-15(PP) Disassembly of the Small Engine Figure 1.
40 Minutes Left.
Marble Delivery System Lab ENGR 1181 Lab #1. Build a tower, build a team  Effective teamwork is the basis for team success
CSE 1111 Week 3 CUP (Computer Use Proficiency) This week: Word and/or Excel no signups – just show up* Times (in 123 /124 NH) Fri 1/31 1:00 – 5:00 (in.
Wind Turbine Power Plant. Sources ●
TA Meetings ECE 445: Senior Design - 09/15/15. Overview  Meeting expectations  How to prepare  Evaluation.
Introduction to Engineering Lab 1 – 3 Report & Project Notebook Agenda Complete & turn in Lab 1 Report Learn requirements for Project Notebook.
College of Engineering Wind Turbine – Part A Engineering Education Innovation Center ENGR 1181.
10/10/11 Agenda 1)Study while I check notes 2)Cell respiration quiz – open poster 3)Grade and review quizzes 4)Hand out study questions – make study plan.
Engineering Notebooks
Curve Sketching Today we will look at the graph of a function, and then the graph of the derivative of a function and draw conclusions about important.
College of Engineering Problem Solving Lab Lab – Problem Solving Lab A Engineering Education Innovation Center ENGR 1181.
Introduction Intro Problem Materials Hypothesis Procedure Results
Silent Classroom Timer
EG1003: Introduction to Engineering
Laboratory 1A: Mousetrap Car Competition
Lab-On-A-Chip Overview
Wind Turbine Lab (Part B)
WIND TURBINE GENERATORS.
Circuits Lab Introduction
Welcome to Newton Lee Elementary Science Olympiad 2017
Roller Coaster Design Project
EG1003: Introduction to Engineering and Design
Marble Carrier Lab 1 Instructor:
Problem Solving Lab – Part C
Renewable Energy Lab.
15 seconds left 30 seconds left 3 minutes left 2 minutes left 1 minute
Magnetic Levitation Competition
Renewable Energy Lab.
Renewable Energy Lab.
Mousetrap Car Competition
Equivalent Ratios Guided Notes
1. How do I Solve Linear Equations
Magnetic Levitation Competition
Presentation transcript:

Eng 1181 College of Engineering Engineering Education Innovation Center Marble Delivery System Introduction Lab 1

Eng 1181 Lab Setup The above picture shows the testing table, the start line, and the bucket at the end of the table. The picture below shows the table setup. You will have a K’nex set, and a cup with 10 marbles

Eng 1181 Schedule of Events Lab Intro + Questions: 5 min Design and Construct : 35 min RUN #1 : 10 min Design Modifications:10 min RUN #2 : 10 min CLEANUP/Wrap-up:10 min When your team is called you have 1 minute to start the run.

Eng 1181 Scoring Points Marble in center Target10/marble Marble in outer Target5/marble Max score100

Eng 1181 Today’s Assignment At the end of class: Disassemble the vehicle, organize the kit and have a TA check it before leaving Get Checkout Procedure signed by TA or Instructor

Eng 1181 Helpful Hints Be aware of the time left in class –There will only be two opportunities to make runs. –The first run will conclude after 50 minutes –Your second run will be on a first-come first- served basis

Eng 1181 TopicDocument Type MARBLE DELIVERY SYSTEMNone Quality and ProductivityExecutive Summary CircuitsExecutive Summary Solar Meter-- Solar CellMemo (Combined) Quality & ProductivityMemo Wind Turbine 1-- Wind Turbine 2Report (Combined) Problem Solving Project 1 Project Notebook (Combined) Problem Solving Project 2 Problem Solving Project 3