LN2 filling system 1.Filling the buffer tank 2.Filling the collector tube 3.Filling the detectors 4.Venting the collector tube 5.Monitoring then go to.

Slides:



Advertisements
Similar presentations
Logic Gates Some Most All Learning Objective
Advertisements

HS-30 Hydrostatic Pressure Sensor Presented By Peter Ward Hydrological Services Pty Ltd.
6890 GC Detectors - The Flame Ionization Detector
Dr. HABEEB HATTAB HABEEB Dr. HABEEB HATTAB HABEEB Office: BN-Block, Level-3, Room Ext. No.: 7292 UNITEN.
Software and hardware complex of experimental plant for pulp and paper production Master student of MMA department : Anton Kaverin Perm National Research.
Oxygen Concentrators.
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 15 Slide 1 Real-time Systems 2.
Clean Air Box Usage & Care CABs RAMs CO Monitors.
Xe leak status C. Garabatos. Leak story The maximum allowable leak rate corresponds to a loss of 10% of the total volume in one year – 0.3 l/h for the.
Purpose: Integration of AGATA detectors in triple modules Acceptation tests of triplets (energy resolution, crosstalk,…) Complementing the scanning table.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 20, 2009.
1 Status of Hydrogen System Development MICE Collaboration Meeting, Frascati, June 26-29, 2005 Yury Ivanyushenkov, Tom Bradshaw, Elwyn Baynham, Mike Courthold,
1 MICE Absorber working group Columbia, 13 June 2003 MICE Hydrogen System. Preliminary HAZOP. Elwyn Baynham, Tom Bradshaw and Iouri Ivaniouchenkov,
MICE Safety System DE Baynham TW Bradshaw MJD Courthold Y Ivanyushenkov.
1 New baseline for the magnet cooling system Yury Ivanyushenkov Engineering and Instrumentation Department, Rutherford Appleton Laboratory.
Module 2: Hardware and Terminology
Design and Implementation of SIP-aware DDoS Attack Detection System.
CHE 185 – PROCESS CONTROL AND DYNAMICS DCS AND PLC FUNDAMENTALS.
PLC: Programmable Logical Controller
VAC - Ctrl System 04Nov2011. Some points to be discussed Give support for the cryogenic control system prepared by Nikhef team for Cryotrap (and Genova.
-P&ID- Piping & Instrument Diagram
Overview of the 1.
Digital Design - Combinational Logic Design Chapter 2 - Combinational Logic Design.
1 isr Institute for Sustainable Resources CRICOS No J Automated Greenhouse Gas Measurement System.
PLC: Programmable Logical Controller
 P&I Diagram  Gas Room Controls  Gas Panels Controls in the Hall  GUI  Oxygen Sensor Cart.
AdV Vacuum system changes, 04Mar2010, NDRC option Preliminary Cryotrap_NI Link or tube? Cryotrap_NE Link Cryopump SR? Cryopump PR? Zeolites/27K/77K (or.
4 May I/O Control. 4 May What is I/O Control? A Doors feature that allows you to program input events to drive output responses – for example:
SMACS Slow Monitor And Control System Developed system for CDF-TOF proposed for Atlas-MDT/RPC.
LKr Calorimeter Control and monitoring R. Fantechi 19/02/2010 R. Fantechi.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
The Scheme of Slow Control System in BESIII Xie Xiaoxi Gao Cuishan
PLC Based sequential batch process CONTROL system
MV Network Operation and Control Barcelona May 2003 Eugenio Di Marino Italy Session 3 Alpha 1 Block 1.
AdV- VAC CTRL SYS/Cryo Interface 06Feb2013. Cryotrap cryogenics (simplified sketch) = the ‘electronic’ equipment needed to read LN2 level, temperature,
CPPM Pixel Evaporative Cooling Plant Description & Operation with C 3 F 8 or C 4 F 10 G. Hallewell, CPPM, Feb 07, 2005.
ALICE-TRD gas system 1/4/2015R. Guida PH-DT-DI1. TRD gas system Few numbers:  Total number of modules/racks: 20 (max leak rate certified at construction.
Acquisition Crate Design BI Technical Board 26 August 2011 Beam Loss Monitoring Section William Vigano’ 26 August
IBL cooling thermal chock incident 15 October The IBL cooling team.
© ABB University - 1 Revision C E x t e n d e d A u t o m a t i o n S y s t e m x A Chapter 16 Alarm and Events Course T314.
Turn Liquid Nitrogen tank vent towards the wall Dewar vented into Custodian’s ear as they walked into a lab To prevent injuries, turn Vent and Relief Valves.
I. Vankov, NEC’2003, September ‘03, Varna HV PS System NEC’2003, September 03, VARNA CMS HCAL High Voltage Power Supply System Dimitrov L.(*), Kunov B.(*),
ARM Based Gas Leakage Detection System Student Name USN NO Guide Name H.O.D Name Name Of The College & Dept.
1 Daya Bay RPC Gas Safety System - Gas Cabinet Test Report Changguo Lu, Kirk McDonald Princeton University (October 11, 2009)
IBL cooling operation at bake-out IBL CO2 meeting 10 April 2014 Bart Verlaat, Lukasz Zwalinski, Maciej Ostrega, Olivier Crespo Lopez 1.
DPCL Solid State Device Discrete Control Lecture.
CISSP Common Body of Knowledge Review by Alfred Ouyang is licensed under the Creative Commons Attribution-NonCommercial-ShareAlike 3.0 Unported License.
0-10V Ballast Dimmer HDL-MRDA HDL-MRDA channel 10A DC0 - 10V output module is a multifunction control module. It has 6 channel relay.
October Test Beam DAQ. Framework sketch Only DAQs subprograms works during spills Each subprogram produces an output each spill Each dependant subprogram.
MAGNET#1MAGNET#2MAGNET#3 SATELLITE VB#1 SATELLITE VB#2 SATELLITE VB#3 PRECOOLER#1PRECOOLER#2 DISTRIBUTION VALVE BOX DVB CP#1CP#3CP#2 BUFFER DEWAR LHe 5m.
0 Configuring a 3500 Using iTools 2 iTools Workshop - getting started Start iTools and from the New File menu choose 3504 v1.04 programmer.
DSS-GUI T.Habermann. overview log in tank(s) autofill schedule info admin section (preferences) operator section (control) user section (monitoring) „quick.
Simple Water Level Controller Circuit with Microcontroller and Alarm.
Presentation On Project Work Automatic bottle filling system using PLC
Hall B Gas System Controls Physics Detector Support Group.
Logging and Alarms Apparatus monitored through GPIB – LakeShore temperatures – Agilent power supplies – AMI liquid level monitor Apparatus monitored through.
Status CO2 Cooling IBBelle: Reconnection after Belle II Roll in
ProtoDUNE - SP SLOW CONTROLS MEETING 11/11/2016 CERN – EP/DT
Unit 45: Circuits and components Dr
ATLAS MDT HV – LV Detector Control System (DCS)
M.Tavlet, H.Taureg - ALICE
LEVEL CONTROL USING ULTRASONIC
Status of Hydrogen System Development
Manisha Goel, Lecturer, EE Deptt Govt. Polytechnic Manesar
8.0 Programmable Logic Controllers 1
Status Report on Fermilab CO2 cooling activities
Design Principles of the CMS Level-1 Trigger Control and Hardware Monitoring System Ildefons Magrans de Abril Institute for High Energy Physics, Vienna.
Overarching Commissioning Plan
What IS Relay?.
Presentation transcript:

LN2 filling system 1.Filling the buffer tank 2.Filling the collector tube 3.Filling the detectors 4.Venting the collector tube 5.Monitoring then go to 1 or 2

1. Filling the buffer tank Automatic? Alarm on the buffer tank to alert operators?

2. Filling the collector tube Logic sequence: – Open VP – Open VIN – While FP wait for TP to get to LN2 value – Close VP

3. Filling the detectors Logic sequence: – (VIN already open, VP closed) – Open VDi – Wait until TVi is at LN2 temp – Close VDi

4. Venting the collector tube Logic sequence: – Close VIN – Open VP

5. Monitoring Logic sequence: – Check P,V against alarm threshold ->Step 1: Fill the buffer – Check Tdi against limit value ->Step 2: Fill all the detectors – Check time since last fill ->Step 2: Fill all the detectors

Implementation – collector VIN 24V NI 9476 VP 24V NI 9476 NI 9217NI – 40 V DC NI 9217 Collector Safety Valve(s) NI /column NI /column NI V AC1 +1/column VDC1/column

Implementation - detector VDi 24V NI 9476 NI 9217 Collector Safety Valve(s) NI 94761/detector NI V AC1 /detector Dewar TDi

Implementation – monitoring V Collector P NI 9217 NI 9425? NI 9217 NI 9425? Dewar Crystal NI 9217

Custom modules To NI 9217 PTi From NI V Power On/Off Open / Close Opened / Closed Powered Y/N To NI 9425 Read PT100 Distribute valve signal Command one valve V DC Read flux sensors M1 M2 M3 M4 12V

M3 working principle 12 V Power On/Off Open / Close Opened / Closed Powered Y/N M3 12V NI 9476 Valve 12 V

Connection diagram Compact Rio Crate (6 x NI 9217, 1 x NI 9476, 1 x NI 9425) PT100 Prox M1 12V Prox M2 M3 Valve 12V? M4