Maruti Steel Fab. Shaping Ideas One of the Largest Manufactures of Formworks in INDIA.

Slides:



Advertisements
Similar presentations
ODOT Structure Project Manager Training
Advertisements

Structural Steel Construction
Unit 45 Metal Framing Industry and Code Regulations • Light-gauge Steel Framing Members • Fasteners • Framing Tools • Metal Framing Safety • Light-gauge.
FORMWORK Prof Awad S. Hanna.
Measurement for Civil Engineering works
2.2 STRUCTURAL ELEMENT Reinforced Concrete Slabs
Competency: Draw Wall Sections
Prof Awad S. Hanna Concrete Structures Concrete Structures.
INAR 243 FLOORS.  Structural element  Proper ground for functions.
Bridge Engineering (6) Superstructure – Concrete Bridges
Commercial Framing C D Prints Unit 13.
Gravity Force Resisting Systems
TEQIP-II Institutions
Welcomes to presentation on Segmental Construction by Crib & Crane and Crib & Goliath Gantry at National Seminar on Design & Construction of Bridges Welcomes.
1 Design and drawing of RC Structures CV61 Dr. G.S.Suresh Civil Engineering Department The National Institute of Engineering Mysore Mob:
Chapter 34 Bridge Construction.
Bridge Engineering (7) Superstructure – Reinforced Concrete Bridges
Foundation Systems.
CONSTRUCTION.
Competency: Draw wall sections and details. Objective: Apply concepts of wood sill and floor construction.
Chapter 19 Floors.
Basic Building Construction
REINFORCED CONCRETE Reinforced concrete is a composite material which utilizes the concrete in resisting compression forces, and steel bars and/or.
Chapter 18 Foundations.
Concrete Construction
Bridge Structure Types and Components. BRIDGE STRUCTURE TYPES AND COMPONENTS TECHNICAL STANDARDS BRANCH INTRODUCTION TO BRIDGES TRANSPORTATION Slide 2.
Main Goals of this Activity
Reading Structural Drawings
Bridge Engineering (5) Substructure – Abutments and Piers
Basic Structural Theory. BASIC STRUCTURAL THEORY TECHNICAL STANDARDS BRANCH INTRODUCTION TO BRIDGES TRANSPORTATION Slide 2 Beams Different member types.
BEAMS AND COLUMNS PRESENTED BY K.ROSHIN RUKSHANA.
FORMS, SCAFFOLDING and STAGING
Wood Construction CTC-375.
+ Sill and Floor Construction Vocabulary. + Anchor Bolt A threaded rod inserted in masonry construction to anchor the sill plate to the foundation.
Introduction to a pit-less lever scale “concrete deck” The scale to be shown is a B-Tek Side/rail Side/lever electromechanical Platform is 60’x11’ on.
ROB at Koratty in lieu of LC No.54 Progress as on
Day 20 PRECAST AND PRE-STRESSED CONCRETE Pre Cast concrete comprise units that are made under controlled conditions, with necessary preparations for.
Chapter 43 Common Commercial Construction Materials.
Chapter 23: Structural Drafting
FLAT SLAB Flat slab are also known as beamless slab, is a type of slab in which the flooring slab is directly supported on columns without the agency of.
BUILDING CONSTRUCTION
Industrial Training Report March 2013 VARIOUS SITES OF ULCCS Ltd Dept. of CE, GCE Kannur 1.
Drafting 2 (Arch) Quiz Review #5
Engineering the Future Chapter 12 Tower in the Sky.
Footings & Foundation Prepared By: (Vanani Sanket) Department of Civil Engineering B.H.Gardi College of Engineering & Technology.
Welcome to Gajanand Steel Website: ID: Mo No.:
Gantry Crane Price ,
Leads Institute of Technology & Engineering
Offsite manufactured Bridges
Commercial Floor Systems
INTRODUCTION to EUROFORM
Required Drawings and Info for Formwork or Scaffold Design
ENGINEERS & CONTRACTORS
FORMWORK DR. Nabil Dmaidi.
FORMWORK FORMWORK COMPONENTS Scaffold frames Plywood
SeminAR ON LINTELS --SANTHOSHKUMAR.M..,.
Competency: Draw wall sections and details.
By T.G.N.C.VAMSI KRISHNA. 171FB M.tech – Civil.
Arch205 Material and building construction 1 floor & Roof systems
G R E A T L A K E S B U I L D E R S A Re-construction Company Specializing in Structural Remediation and Alterations.
Arch205 building construction floor & Roof systems
Concrete Structures DR. Nabil Dmaidi.
Arch205 building construction floor & Roof systems
Arch205 building construction floor & Roof systems
Building Frame (Column & Beam)
Commercial Floor Systems
Commercial Floor Systems
Concrete A structural material made by combining cement, sand, aggregate, and water.
Cebus Rimon Industrialized Construction Ltd
. The sheathing for a floor form is secured to the beam or girder side when forming a monolithic beam or girder and floor slab systemBlock bridging is.
Presentation transcript:

Maruti Steel Fab. Shaping Ideas One of the Largest Manufactures of Formworks in INDIA.

INTRODUCTION  Maruti Steel Fab.  1 of the largest manufactures of formworks.  Launching Gantry.  Segmental Formwork.  Tunnel Formwork.  Specially designed formwork for Post Tension Slabs for IT & Malls.

Banglore Metro  Design & Fabrication of Elliptical shape of formwork size 1600mm X 2500 mm.  17 meters height Single Pour. For Karnataka most prestigious Project. On Main MG Road. Banglore Metro.

Casting on going in process

In line Pier along with Pier Cap

Fly over at Pune ( Hadpasar)  Pier & Pier Cap at Pune.  Client: M/s. J.Kumar Infra Projects Limited.  With groves Flaring like Sun Rays. In the Cap.  Crown between Pier & Pier Cap.

Pier, Pier Cap & I Girder formwork  Pier Diameter 1700mm Diameters, with Seamless grooves of 25 mm deep in full length of Pier.  Pier Cap Elliptical Flair Step Wise.  Top of the cap have 2 radius making it look like Pipe, thru out Periphery

Bhiwandi Flyover.  Raw Finish of the concrete surface where in casted using Maruti Steel Fab. Pier Formwork.  Client: J.Kumar Infrastructure Limited.

Box Girder Shuttering.  Pier Casting for Pathankot Highway. BOT.  Client M/s. Gannon Dunkerly & Co Limited ( Delhi Division)  Various Spans of 32.4 meters, 35 meters, 42 meters & 48 meters. Along with Trussels & supporting structure.

Phathankot Highway.  Around 1000 Tons of Steel Shuttering for Box girder & Cribs. Supplied by Us in 5 months time.

Box Girder  Bottom Slab ready with reinforcement along with the side shuttering, including intermediate blisters.

P.S.C. Girder Shuttering  P.S.C. Girder shuttering of height 2250 mm height & length of mm.  Client: Satav Infrastructure Limited.  Prestigious Project of NH – 4. B.O.T. For N.H.A.I.

Panchagutta Flyover  Under HUDA the flyover formwork was done by us with Elliptical Flair in 4 meters portion.  Client: M/s. Gammon India Limited.  Including Rubber Lining done by us.

D Shape Tunnel Formwork 5500mmHt X 5000mm (W)X6000mm long  D. Shaped Tunnel Form work with window arrangement for pouring of concrete, the frame done using high tensile steel thus reducing the weight of formwork, internal clear opening 3.5 X 3 meters for Dumper to pass thru for disposal of Mucking inside the tunnel thus enabling parallel, construction activities going on.  Client: M/s. Sammon Engineers &Earthmoving Corpration.  Site: Udaipur.

Tunnel Shuttering  D Shaped Tunnel formwork done way back in Very Light in weight using the truss type arrangement.  Client M/s. Mudhcon Projects Limited  D Shaped Tunnel formwork for MKDVC Project ( Water Tunnel )  5 meters ( W) X ( H ) X 6 meters long.  Client: M/s. Parwani Builders (P) Limited.  Site: Kolhapur

Tunnel Formwork.  Total Length of the tunnel 7 Kilometers.  Site: Devikhindi.   Side lining for tunnel.  7 meters wide, 3.6 meters Height & 6 meters long formwork.  Client : P.V.R Projects Limited.  With all window arrangements & pneumatic vibrators.

Retaining Walls  Retaining wall casted in single pour of height of 7300 mm.  Length of Trench 2 Kilometers.  1 side support only the other side rock was there over cut up t0 1 meter in some places.  Client: Shapoorji Pallonji & Co Limited  Site : Ranjangaon.  Total Tons: Approximate 100 Tons.

Shuttering designed for PT Salb  Ply wood plates specially designed for Post Tensions Slabs.  Where in only primary grid required secondary grid not required.  High Tensile Channels placed over the Stirrup heads & plates directly over that.

Plywood plates.  Plate Gives over 120 reputations.  All Standard components are used.  Weight of the plates much lighter that wall forms. Just 33 Kg per meter square.

Cuplock System  Cuplock system supplied for defense building.  27 meters height.  Beam of 1200mm Height & 24 meters span.  Slab Thickness 400 mm  Using Plywood Plates.  Client: Vijay Nirman Co P Limited.

List of Clients.  Ambience Construction India Ltd Hyderabad  Associated Engneering Co (P.V.Raj.) Hydrebad.  Gayatri Projects Ltd.Hyderabad / Banglore  H.H.Engineers Pune.  Ircon Constructions Limited.Pune.  J.Kumar Infraprojects LtdMumbai.  K.Raheja Construction (p) ltd Pune  Madhucon Projects Ltd.Hyderabad/ Pune.  Nagarjuna Construction Co. LtdBombay, Hyderabad  NCC – Maytas ( J.V) Singapore City.Hydrebad.  Petron Civil Engineering LtdPune

 Pratibha Construction Co.Kolhapur.  Rajdeep Buildcon (P) Limited.Pune/Nagar/Nagpur.  Ramky Infrastructure Limited.Hydrebad.  Satav Construction (P) Limited Pune.  Sew Construction Ltd Hyderabad  Shapoorji Pallonji & co Ltd.Pune  Shrinivasa Construction Ltd Hyderabad/ Pune.  Simplex Concrete Piles I LtdMumbai  Skanska Cementation I Ltd Bombay  Sobha Space ( P ) Limited Banglore / Pune.  Soma Enterprises Ltd Hyderabad (all India site ).  U.B.Engineering LtdPune, Chiplun.  Vascon Engineering P Limited Pune.  Vijay Nirman Co P Limited Pune / Nagpur / Nandurbar.  M.R.BuildersPune  Gammon India LimitedNasikh, Hydrebad.  Navayuga Engineering Co Limited.Banglore / Hydrebad.  Cherian Varkey construction company Pvt ltdKochi.  Bangalore Metro Rail Corporation LimitedBangalore.  And Endless list to follow………..

On going Works as on  Launching Girder Total length 72 meters ( Including nose) Span between 2 piers 32 meters. Client: Navayuga Engineering Co Limited.  Elliptical Pier, with elliptical flair & cap. Client Bangalore Metro Rail Corporation Limited.  Sky Walk for around 2000 Tons, Client: J.Kumar Infraprojects Limited.  Column & Slab casting single pour column height 9 meters. For Power Project J.S.W. Client: Raghu Constructions.  P.S.C. Girder Shuttering. Client Cherian Varkey construction company Pvt ltdKochi.

Rental Division. Material available on hire. S.NoDescriptionNumbers 1` Props – = opening = Props – = opening = Spans – = opening = 4.10 Mtr Centering plates X X H Frames – Cross Bracing – 2.00 X Cup lock systems Vertical – 2.00 Mtr Cup lock systems vertical – 1.50 mtr Cup lock systems vertical Mtr Cup lock systems horizontal – Cup lock systems horizontal – Cup lock systems horizontal –

Contact Us.  Maruti Steel Fab. Plot # 9. B.U. Bhandari Industrial Estate Sanaswadi. Pune Cell # Cell # Fax # – Branches: Bombay, Hyderabad, Bangalore, Chennai.