Mack T12 Engine Test Update

Slides:



Advertisements
Similar presentations
Service Tips April COOLING SYSTEM To check and/or fill the cooling system it is necessary to remove the rear fender, the fuel tank (photo 1) and.
Advertisements

CGR Combustion Gas Recycling in Diesel Engines By Zoltan Kemeny, PhD Copyright©, 2014 LLC, 2010 Pat. Pend. All rights reserved.
New Technology Summary (Benefits vs. Drawbacks) Copyright ©, 2014LLC, 2010.
2008 / 06 NOTE Year / Month S4L(FOR 331),S4L2(FOR 335) T303/353NC P1 FIG 101 CYLINDER HEAD 4.
Fuel System The fuel system supplies the air and fuel necessary for an engine to produce power. The fuel system includes: Air Cleaner Fuel Supply Carburetor.
November 11,2004 Piston Temperature Profile CAT-1P & C13 James McCord.
Rob Midgley Oils and Oil Analysis deHavilland Moth Club.
For: Mike Landau, Southern California Gas By: James P. Chiu, Southwest Research Institute Study on the Effect of Varying Fuel Composition on Fuel Supplied.
Capture of Heat Energy From Diesel Engine After Cooler Circuit (2006 Annual Report) Mark Teitzel Alaska Village Energy Corporation
GCAA Tier 4 Specifications BP Lubricants USA Inc Geno Capitoni National Accounts Manger.
STTC 20/08/2002 Eva Sánchez-Corral 1 ST Division W2000 Migration status report Organisation and Management Strategy and Planning Review of experience Status.
Cummins ISB Test Development Task Force Cummins Surveillance Panel Mark Sarlo, SwRI January 11, 2005.
Research Updates Kapila Wadumesthrige 02/05/08. Engine testing (Kapila, Sidong, Mark and Nick) –Frequency 83.9 hrs –83.9 hrs to hrs.
08/02/011 Statistical Summary of the Mack T10 Precision/BOI Matrix.
INGAS - Integrated GAS Powertrain 24 months Meeting, October, 2010 Project number: October 2010 Project number: October.
TEI has received 21 skids of liners from Federal Mogul. Our original order was for 19 skids. The additional 2 skids were part overrun pieces and TEI decided.
Analysis of the ISM Matrix Draft 3 November 5, 2004.
Mack T-12 Precision Matrix Preliminary Analyses Presented to T-12 Task Force October 11, 2005 Jim Rutherford (510)
Bernie Kinker June 14, 2007 RohMax Oil Additives ROBO For ESCIT.
CPD Report Mack Surveillance Panel June CPD Report Mack Surveillance Panel June 2004.
GENERAL ENGINE DIAGNOSIS n Chapter 4 n Classroom Manual –Page 73 n Lab Manual –Page 77 n Tasks I-A-1 thru I-A-8 CBC AUTOMOTIVE RK.
Mack T-12 Pre-Matrix Data Analyses Version 3 Presented to T-12 Task Force March 17, 2005 Jim Rutherford (510)
CPD Report Mack Surveillance Panel September, 2005.
LBT Q Engineering Review DYB. 21-Dec-2007LBT Q Engineering Review Highlights (Q4/2007) Currently in Commissioning Phase Currently in Commissioning.
07/16/03 mrb McGeehan G EPA 1 G EarthBkgrd Engine Oils for Ultra Low Emission Diesel Engines Jim McGeehan, Manager of Global Heavy-Duty Diesel.
JACTest Monitoring Center Test Monitoring Center Report to the Mack Test Surveillance Panel June 17, 2002 Montreal.
© The Lubrizol Corporation 2006, all rights reserved Case Study: Sequence IIIG Phos Retention at 20 Hours Presented to ESCIT February 2007 San Antonio,
Cylinder Condition & Performance On-Board Diagnostic, OBD / CoCos
ISM Test Development Task Force Report June 21, 2004.
LTMS Task Force Statistics Subgroup Report to Joint LTMS Open Forum San Antonio, TX May 11, 2010.
February 28, 2006 ® Southwest Research Institute ® Engine Lubricants Research Department Overview of SwRI IR&D Program To Study Engine Oil Formulation.
Cummins ISB Test Development Task Force Cummins Surveillance Panel Mark Sarlo, SwRI February 21, 2005.
JACTest Monitoring Center T-10 PB Ad Hoc Task Force Report to the Mack Test Surveillance Panel September 10, 2004 Richmond, VA.
Slide 1 of 13 CONFIDENTIAL April 20, 2004 Caterpillar ECF-2 Program Field Follow data Test Criteria Test Matrix Results.
Cat Aeration Task Force Additional Prove Out Testing Proposal 1 PC-11 Statisticians Task Force July 1, 2014.
© Chevron 2008 ASTM PCEOCP VID Matrix Design and Funding Subgroup April 25, 2008 Teleconference.
Mack T12 Piston Distress October 11, CMIR piston 4 CMIR piston 5 TRWL = 101mg TRWL = 31 mg.
® 28 September 2006 Southwest Research Institute ® Engine Lubricants Research Department Update on SwRI’s IR&D Program To Study Engine Oil Formulation.
Chapter 41 Lubrication System Fundamentals.
Meeting RPC Gas Task Force Meeting – 15 A. Sharma January 21st, 2009
Ford LSPI Prove Out Analysis Kevin O’Malley The Lubrizol Corporation 1.
Draft 08/06/01 jar1 Draft Addendum to the Statistical Summary of the Mack T10 Precision/BOI Matrix Including IR Oxidation.
ESCIT Ballot January 8, Ballot Results Sequence IIIG preferred by a majority of the members –Sequence IIIG-EOT was the preferred duration Secondary.
LTMS Task Force Statistics Subgroup Report to Joint LTMS Open Forum San Antonio, TX May 11, 2010.
Mack Surveillance Panel
Variable Geometry Turbocharger
Engine Maintenance Workshop
Test Monitoring Center Report to the Mack Test Surveillance Panel
Heavy Duty Engine Oil Classification Panel
Carburetor, Mixture, and Icing.
Volvo/Mack CPD Report T8/T11/T12/T13
Status report / Activity Plan of Evap Task Force
Date of download: 10/22/2017 Copyright © ASME. All rights reserved.
Monthly Report For January 2017
Statistical Summary of the Mack T10 Precision/BOI Matrix
Agenda Introduction and membership
Test Monitoring Center Report to the Mack Test Surveillance Panel
Report to T-10 Task Force T-10 EGR Hardware Update 24 April 2001
Date of download: 12/21/2017 Copyright © ASME. All rights reserved.
Test Monitoring Center Report to the Mack Test Surveillance Panel
What are the Basic Causes of Leaks in Car Spark Plug Tubes
ENGINE COMPARISION Copyright © MILE 2011 MILE / XUV500 / ENGINE 01/ VER 01 / JUL 2011.

Ford LSPI Prove Out Operational Data Plots
Variable Geometry Turbocharger
Service Tips April 2005.



Presentation transcript:

Mack T12 Engine Test Update January 12th 2005

Increased EGR Flow (Heavy EGR) (35% Phase 1 – 15-% Phase 2) Mack T-12 Based on Mack T10 & Mack T11 With ULSD Fuel Length - ~ 300 Hours Two Phase Test Phase 1 100 hr ( 4.0 % Soot ) Phase 2 200 hr ( EOT of 6 % Soot ) Phase 2 260 F Oil Temp Increased EGR Flow (Heavy EGR) (35% Phase 1 – 15-% Phase 2) Precision Matrix Required

Task Force Recommends the use of dyed PC 10 ULSD Hardware ( External ) Same as T10 Except – VGT Turbo replaces small T10 Turbo 2 Production EGR Coolers ( Breadboard ) Replaces Tube Cooler-Test with 3 ? 80 C EGR Coolant Inlet Temp EGR on/off Valve Hardware ( Internal ) T11 Power Cylinder ( T10 Top Ring ) & T11 Heads New Nozzles & Spray Angle T12 Conversion Kits Sent to Labs T12 TASK FORCE – Numerous Teleconferences, Oct 20 Mtg in San Antonio – Meeting Nov 22nd @ ExxonMobil- Next Mtg Jan 12th in San Antonio Test Procedure Available, T12 Parts List Completed Completed Test on 820-2 ( T10 Ref Oil ) , 2nd Test to Complete Mid November 6 Engines in 4 Labs Running week of Jan 10th Task Force Recommends the use of dyed PC 10 ULSD Task Force Recommends 820-2 Should be Part of Precision Matrix

Lubrizol- 2 Coolers – 80 hrs with NO sign of fouling Perkin-Elmer – 2 Coolers 100 hrs live test (820-2) – Cleaned Coolers @ 77 hrs (Ni 1ppm) 2nd Stand with 3 Coolers – wk of Jan 24th Afton – Start 3 Coolers wk of Jan 10th 100 hrs ExxonMobil – Start 3 Coolers wk of Jan 17th – Live Test SWRI - Continue Running 2 Coolers until 3 Cooler data

T12 Pb (ppm) Discrimination Oil Hours GLS 12/06/05

Wear / T12 vs. T10 820-2 T12-820-2 vs. PC10 Prototype Wear Rate GLS JAN 12TH 2005 HDEOCP Nov 11th 04

HDEOCP Nov 11th 04