Railway Development in Ottawa From Colonel By to the O Train Part Colin J. Churcher
Ottawa Area
Periods of Development Early local railways Part of national network Consolidation of companies Commencement of route reduction Elimination of cross town tracks and rationalization Reduction of the network to date Rise of short lines and the O Train. These dates are approximate and overlap each other.
1934
1939
1942 CN airport spur
1946-1
1946-2
1947
1951 CPR Airport Spur
1952
1953
1956 CPR Wamo connection built
1957 NYC abandoned
End of Part 3 See Part 4