1 of 5 Time & Cost Overrun in North Eastern Projects – Causes and Solutions. Workshop on ‘Enforcement of Contract Clauses and Timely Recovery’ Barapani.

Slides:



Advertisements
Similar presentations
ISTISNA AS MODE OF FINANCE
Advertisements

DBE: Disadvantaged Business Enterprise Program DBEs are generally small firms owned and controlled minority or women.
VISION & MISSION OF KeNHA VISION : Quality, safe and adequate National Road Network. MISSION : Provide quality National Road Network for sustainable social.
TRAFFIC MANAGEMENT Tender and Construction Phase
Practical Car Ijarah.
DISTRICT FIVE CONSTRUCTION CONTRACT ADMINISTRATION UPDATE TRAINING Submission of Working Schedule Specification SP A.
Funds administration, also referred to as funds control, funds disbursement, funds management, and escrow, is a method that sureties use to offset the.
NMDOT 2013 Specifications- Section 100 Presented by: Rod Billingsley Billingsley Engineering, P.C. Las Vegas, NM.
Security of Payment workshop Andrew Robertson Important Disclaimer: The material contained in this publication is comment of a general nature only and.
Workshop on “Enforcement of Contract Clauses & Timely Recovery” on 23-24th February, 2012 ‘Time and Cost Over-run in AAI Projects (Causes and Solutions)’
4/28/20151 PRESENTED BY NAKABAGO JOHN CONTRACT MANAGEMENT AND ADMINISTRATION IPPU PRESENTATION JOHN NAKABAGO.
1 MOSS ADAMS LLP | 1 Case Studies in Contract Close Out Audits May 2014.
Dr. Lic. Herfried Wöss, LL.M. (Exeter), MCIArb. © The relationship between Arbitration and the Dispute Adjudication Board under the FIDIC Silver Book (EPCT)
17 th Contracting Squadron I n t e g r i t y - S e r v i c e - E x c e l l e n c e LETTER CONTRACTS 2k7 01 Dec 05 Train and deploy the world’s foremost.
DPW General Conditions Articles 32 through 37. Articles Covered Today  32 Owner’s Right to Withhold Payment  33 Owner’s Right to Stop Work and Terminate.
Texas Real Estate Contracts 4 th Edition © 2015 OnCourse Learning.
RTI International Contractor International is a trade name of Research Triangle Institute Worst Mistakes in Government Contracting Post-Award.
Introduction -Discussed preparation of the overall plan for the project - as well as its implementation. -The control system quantitatively measures actual.
ISLAMIC UNIVERSITY OF GAZA FACULTY OF ENGINEERING CIVIL ENGINEERING DEPARTMENT 20. Claim, Disputes and Arbitration [Construction Contract Administration]
ISLAMIC UNIVERSITY OF GAZA FACULTY OF ENGINEERING CIVIL ENGINEERING DEPARTMENT Defects Liability [Construction Contract Administration] Chapter 11.
An Act of Parliament to provide for compensation to employees for work related injuries and diseases contracted in the course of their employment and for.
Business Studies Grade 11.
XII- COST CONTROL, MONITORING & ACCOUNTING
Construction Engineering 221 Contracts & Contractor Procurement.
ZHRC/HTI Financial Management Training Session 8: Annual Procurement Plans, Procurement Contracts, and Contract Management.
Contract price & payment
Insurance provisions under JCT 1998 and JCT Standard Building Contract 2005 Brian Lewis – QBE CAR.
Introductory to the “Basics” of Contract Types and Their Impact in the Management of Government Property Presented by: Fay K. Schulte, CPPM.
WORKSHOP ON ENFORCEMENT OF CONTRACT CLAUSES B.PRADHAN,CVO,AAI GUWAHATI
CHAPTER PowerPoint ® Presentation Prepared By Susan McManus, Mount Royal College CHAPTER PowerPoint ® Presentation Prepared By Susan McManus, Mount Royal.
1 IMPLIMENTATION OF CONTRACT CLAUSES Presentation by SRI. S. SREEKUMAR GM(ENGG), NER Dt
Nabil dmaidi1 Bid Submission Documents A LATE BID IS NO BID.
Study Unit 4 Performing Contractual Obligations.  The outcomes for this learning unit are that you should be in a position to: ◦ Discuss Agency ◦ Discuss.
S10 CONS5Q25 Lara Tookey. Review of estimators workings Decision on what margin to apply Bid submission details Submit your Tender.
Compensation events and claims Presented by Prof. Khem Dallakoti.
1. Introduction Time is of essence in basically every construction project Yet, delays of some sort are general rule, rather than the exception Consequence:
Chapter 4 continued. Intermittent Inspection –Oversight of several projects makes continuous observation impossible –Do weekly reports instead of dailies.
CONSTRUCTION ADMINISTRATION Construction Operations Dr. Alaattin Kanoğlu Spring, 2013 Professional Practice Management I.B.U. Architecture Undergraduate.
General Condition THE EMPLOYER Construction Law Supervised By : Dr. Kamalain Shaath Prepared By : Eng. Fawzy El.farra.
CONSTRUCTION CONTRACTS DOCUEMENTS
LECTURE 4 FORMULATION & PRESENTATION OF MONETARY CLAIMS  Recovery of Loss / Expenses / Damages  Notice of intention to claim  Particular and further.
Statewide Monitoring Tool Approved Effective July 1, 2015 Early Learning Coalition of Orange County 1.
7 Plant, Materials and Workmanship. 7.1Manner of Execution The Contractor shall carry out the manufacture of Plant, the production and manufacture of.
CHANGE WORK ORDER A change work order may be issued by implementing official any increase or decrease in quantities of original work items in the contract.
PREPAREDBY: PREPARED BY: Ahmed Al Tayeb Saed Al Qeshawe Tareq Amen Abdalla Syiam SUPERVISED BY: Dr. Kamalain K. Shaat CHAPTER8: Application Of Controls.
Receivables Management For Management Related Notes and Assignments, Visit
LAW for Business and Personal Use © 2012 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible.
1 Chapter 8 karvaytMélKMerag nig kareFVIr)aykarN_ nig karbiTKMerag Project Evaluation, Reporting, and Termination.
Final Accounts. Accounts Submissions Last Bill for Contracted Works ( excluding Retention) Presented at Practical Completion Practical Definition dependant.
Change Orders, Extras and Claims Presented by Geoffrey Cantello, City of Ottawa.
By Khalil T. Hasan Construction Solutions ( Joint Operation/Administration of multiple FIDIC Forms – A Case Study.
Jeff Newman May 21, GSA Schedule Contracting – The Opportunity – The Acquisition – Contract Administration and Revenue Generation 2.
HOW TO PROTECT YOUR INTEREST IN A SALE CONTRACT Focus on what you “get” when you sign!
Welcome. Contents: 1.Organization’s Policies & Procedure 2.Internal Controls 3.Manager’s Financial Role 4.Procurement Process 5.Monthly Financial Report.
Licensing Determinations and Contractor Licensing Responsibility Licensing Determinations The Housing Authority will specify the classification(s) of a.
CONTRACT ADMINISTRATION
Administration of a FIDIC Contract - Project Control
Administration of a FIDIC Contract - Commencement Date to + 28 Days -
Content of Tender Dossier - Instructions to Tenderers - Tenders
Bills of Quantities Introduction to FIDIC - Bills of Quantities -
Reconstruction site Investigation, Planning, Scheduling, Estimating and Design Eng. Fahmi Tarazi.
Administration of a FIDIC Contract - Financial Management
Administration of a FIDIC Contract - Award to Commencement -
Extension of time and how it is granted to a contractor (Referencing JCT 2005)
AGENCY FORMATION AND TERMINATION
Role and Responsibility for Quality Assurance Vishnu P. Shrestha
Find the Problems with the Provisions May 11, 2016 Presented By:
Construction Contract Performance
DSC Default Process January 2019
Role and Responsibility for Quality Assurance Vishnu P. Shrestha
Presentation transcript:

1 of 5 Time & Cost Overrun in North Eastern Projects – Causes and Solutions. Workshop on ‘Enforcement of Contract Clauses and Timely Recovery’ Barapani Terminal Building

Workshop on ‘Enforcement of Contract Clauses and Timely Recovery’ 2 of 5 Tools of Contract Management Contract Agreement. Important clauses of contract for time management : Clause 13 Handing over of site. Site order book. Obtaining time & progress chart. Diligence notices in the event of not meeting the commitment given in time & progress chart : The notice should specify the default / breach on the part of the contractor. Notice should indicate the intended action under clause 32 i.e. Compensation for Delay

Workshop on ‘Enforcement of Contract Clauses and Timely Recovery’ 3 of 5 Proper Interpretation of Contract Clauses Discrepancies and adjustment of errors. Description in Schedule of Quantities. Particular specification and special conditions. Drawings. General Specifications. Timely decision. Prompt reply to letters of contractors. Deployment of requisite plant and machineries. Job mix formula and its approval.

Workshop on ‘Enforcement of Contract Clauses and Timely Recovery’ 4 of 5 Case Study Construction of isolation bay and connecting taxiway at Guwahati Airport : Scheduled date of start : Contractual date of completion: Actual date of completion: Delay in completion: 901 Days. Action taken for delay: Levied compensation. From to

Workshop on ‘Enforcement of Contract Clauses and Timely Recovery’ 5 of 5 Case Study Existing RunwayExtended Runway Original Alignment of Taxiway Isolation Bay New Alignment of Taxiway Taxiway : Flexible Planed. Hot mix plant : Not mobilized. Extended runway contract : Awarded Taxiway to I-bay directly connected to extended runway. Connecting taxiway made rigid. Crux of the issue : site for taxiway original planned not made available. There was slow progress of work. Meantime, runway got extended. Hence, alignment of taxiway changed Summary : Right decision at right time will save time. 20

Workshop on ‘Enforcement of Contract Clauses and Timely Recovery’ 6 of 5 Important tips for effective contract management Immediately on receipt of letter of acceptance, open site order book. Hand over the site. This is important, since time allowed in contract for execution of work commences from 10 th day after the date on which the Engineer-In-Charge issues written orders to commence the work. If handing over site is made in phases. Please make an entry in site order book to the extent site handed over. In accordance with clause 13, insist time & progress chart from the contractor. Closely monitor the progress made. Compare the progress achieved in relation to clause 13.1 of contract. This clause envisage progress of work with relation to time lapsed.

Workshop on ‘Enforcement of Contract Clauses and Timely Recovery’ 7 of 5 Important tips for effective contract management In case, there is back log in the progress, promptly issue a diligence notice. The notice should highlight the slippages. Clause 32 of contract envisage compensation for delay. This clause stipulate that the contractor, if failed to maintain the required progress (as agreed), they are liable to pay compensation. Hence, diligence notice should invariably notify the intended action for breach caused. Closely watch the progress at the portion of site handed over. Read the contract thoroughly. Take timely decision.