The Case for Successful Execution: Hips and Knees Priority Action Team Presentation to the South West LHIN Board of Directors April 30, 2008.

Slides:



Advertisements
Similar presentations
Leicestershires Vision for short break transformation Leicestershire is committed to the transformation and expansion of short break services for disabled.
Advertisements

Welcome to the new acute and community County Durham and Darlington NHS Foundation Trust Clinical strategy FT member events April 2011.
Partners in Mind Workshop 17 November 2009
1 ACHSE 48 th Residential Conference Future Directions for Quality Improvement Patricia Faulkner Secretary Department of Human Services Friday 15 March.
Monday 17 September (Materials presented to the Mayoral Team on 28 August 2012)
Paramedic evidence-based education project (PEEP)
Building the Digital Infrastructure for Vermont’s Learning Health System ONC HIT Policy Committee Testimony September 14, 2011 Hunt Blair, Deputy Commissioner.
Right First Time: Update. Overview Making sure Sheffield residents continue to get the best possible health services is the aim of a new partnership between.
Addressing Fetal Alcohol Spectrum Disorder (FASD) in New Brunswick Stacy Taylor Department of Health January 24, 2012.
The Health Roundtable 3-3b_HRT1215-Session_MILLNER_CARRUCAN_WOOD_ADHB_NZ Orthopaedic Service Excellence – Implementing Management Operating Systems Presenter:
1 The Impact of the ACA: How Readmissions Penalties Will Affect the Healthcare Executive’s Mission Healthcare Leadership Network of the Delaware Valley.
Health Line of Business Revised Health Domains January 26, 2005 Outcomes / Domains have been revised.
Nursing and Midwifery Strategic Framework Overview
Action Implementation and Monitoring A risk in PHN practice is that so much attention can be devoted to development of objectives and planning to address.
By Saurabh Sardesai October 2014.
Building the Foundations for Better Health Health Services Organization.
Diabetes Programme Progress Report Dr Charles Gostling, Joint Diabetes Clinical Director October 2013.
1 A Crystal Ball: How to Improve the Health Care System Tom Closson President and CEO Ontario Hospital Association NAPAN 8th Annual Conference Sunday,
Together we’re better Working in partnership with our patients, communities & GP member practices to continually improve quality of care & to support people.
Prepared by Sean McKelvey Network Healthcare Innovating Care Delivery in the Community The ReachCare Exchange.
Ontario’s Special Needs Strategy Spring The Vision “An Ontario where children and youth with special needs get the timely and effective services.
Presented By Sheila Lucas Ferris State University NURS 511
VP Quarterly Report on Strategies Q1– June 23, 2015 Robbie Peters, Vice President, Financial Services & Chief Financial Officer Vision: Healthy people,
Success Principles in Integrated Delivery System.
Guidelines for Establishing Medical Rehabilitation in Developing Countries Martin Grabois, M.D. Professor and Chairman Baylor College of Medicine Department.
CCG Strategy Update Lewisham Children and Young People Strategic Partnership Board 26 th January 2015.
VP Quarterly Report on Strategies Q1 – 2015/16 VP: Carol Klassen – Knowledge & Technology Services Multi-year Plans: - IT/IM/Equipment Multi-year Plan.
Atlanta Public Schools Project Management Framework Proposed to the Atlanta Board of Education to Complete AdvancED/SACS “Required Actions” January 24,
SESIH Redesign Update Older Persons and Chronic Care Project Paul Preobrajensky Manager Redesign Program 19 September 2007.
Training of Process Facilitators Training of Process Facilitators.
WHO–ITU National eHealth Strategy Toolkit An effective approach to national Strategy Development and Implementation Clayton Hamilton WHO Regional Office.
Measuring and Improving Practice and Results Practice and Results 2006 CSR Baseline Results Measuring and Improving Practice and Results Practice and Results.
Ontario Stroke Network Best Practices Leader Linda Kelloway Saving the Brain Annual Conference March
A Regional Approach to Improvement Julie Branter Associate Director for Clinical Governance and Patient Safety 21 September 2010 South West Strategic Health.
CHILDREN, YOUTH AND WOMEN’S HEALTH SERVICE New Executive Leadership Team 15 December 2004 Ms Heather Gray Chief Executive.
Clinical Care Improvement System Mark Murray, MD, MPA Mark Murray & Associates.
Instructions: Developing a Presentation for Communicating with Board This PowerPoint template is meant to serve as a starting point for the development.
Year 1 Evaluation of Speech Language Demonstration Sites Interim Report September 2011-June 2012.
Programme for Health Service Improvement in Cardiff and the Vale of Glamorgan CARDIFF AND VALE NHS TRUST YMDDIRIEDOLAETH GIG CAERDYDD A’R FRO.
Introduction to Case Management. Why Case Management ?  The context of care is changing; we now have an ageing population and an increase in chronic.
6 Key Priorities A “scorecard” for each of the 5 above priorities with end of 2009 deliverables – with a space beside each for a check mark (i.e. complete)
Mental Health Services Act Oversight and Accountability Commission June, 2006.
Health Quality Ontario: Health System Performance New Zealand Master Class March 25, 2014.
UNDERSTANDING AND DEFINING QUALITY Quality Academy – Cohort 6 April 8, 2013.
Anne Foley Senior Advisor, Ministry of Health New Zealand Framework for Dementia Care.
The Implementation of BPR Pertemuan 9 Matakuliah: M0734-Business Process Reenginering Tahun: 2010.
Linking the learning to the National Standards for Safer Better Healthcare Joan Heffernan Inspector Manager Regulation – Healthcare Health Information.
A NEW REIMBURSEMENT STRUCTURE FOR AMERICA ADVANCED DISEASE CONCEPTS.
Creating an Interoperable Learning Health System for a Healthy Nation Jon White, M.D. Acting Deputy National Coordinator Office of the National Coordinator.
VP Quarterly Report on Strategies Q3 – 2015/16 VP: Michael Redenbach – Integrated Health Services Seniors Multi-year Plan Vision: Healthy people, families.
PATIENTS FIRST: A Proposal to Strengthen Patient- Centred Health Care in Ontario © 2015 Ipsos. Overview for Consultation 2016.
1 An Overview of Process and Procedures for Health IT Collaboration GSA Office of Citizen Services and Communications Intergovernmental Solutions Division.
The Health Roundtable MELBOURNE HEALTH | Community Pathways Model of Care Presenter: Sandra Savy Hospital Code Name: Innovation Poster Session HRT1215.
NHS West Kent Clinical Commissioning Group West Kent Urgent Care DRAFT Strategy Delivering a safe and sustainable urgent care system by
ESSB 6656 Overview and Scope of the Select Committee on Quality Improvement in State Hospitals April 29, 2016 Kevin Black, Senate Committee Services Andy.
Delivery System Reform Incentive Payment Program (“DSRIP”) New York Presbyterian Performing Provider System.
Standards and Competencies for Cancer Chemotherapy Nursing Practice in Canada: CANO/ACIO AN INTRODUCTION.
HIP Alignment Jackie Kearney February Overview Responding to demographic changes The journey so far Why change Why now Your concerns Where to from.
The Workforce, Education Commissioning and Education and Learning Strategy Enabling world class healthcare services within the North West.
Aging at Home in the South West LHIN Invitational Elder Health Think Tank: Aging at Home: Getting There from Here November 19, 2008.
Context for Next Stage of Integration Professor Tony WellsGerry Marr Chief ExecutiveChief Operating OfficerNHS Tayside.
Rural West Primary Health Care (PHC) Team December 9 – 10, Calgary.
Context and Problem Effects of Changes Strategy for Change Aim: To reduce the length of handover by standardising the quality of information transmitted.
Sustainability and Transformation Partnership
Accreditation Canada Medicine Accreditation 2016.
International Summer School on Integrated Care Daniela Gagliardi
Developing a Sustainability and Transformation Plan
Action Plan 1: 2017 – 2020 For Information Only.
Towards Integrated Health in Ontario
Presentation transcript:

The Case for Successful Execution: Hips and Knees Priority Action Team Presentation to the South West LHIN Board of Directors April 30, 2008

2 South West LOCAL HEALTH INTEGRATION NETWORK Acknowledgements This work would not have been possible if it were not for the commitment of the:  Hips and Knees Priority Action Team (PAT)  Hips and Knees Task Teams

3 South West LOCAL HEALTH INTEGRATION NETWORK Agenda  Approach  Overview of the Recommendation  Recommendation for Implementation  Evaluation of Recommendation

4 South West LOCAL HEALTH INTEGRATION NETWORK Approach

5 South West LOCAL HEALTH INTEGRATION NETWORK Mission Statement The hip and knee replacement delivery model strives to:  Ensure that individuals have timely, appropriate and equitable access  Incorporate best practices and evidence-based care  Utilize a common multidisciplinary pathway spanning the entire continuum of care  Enable services to be standardized, and delivered efficiently in a coordinated manner

6 South West LOCAL HEALTH INTEGRATION NETWORK Vision Within the next five years, measures will show achievement of the following elements in the evidence-based care and management of hip and knee replacement patients:  Clearly defined continuum of care available to all patients resulting in positive clinical and functional outcomes  Individuals have equitable timely access to services  Reduction in surgical wait times  The patient, family and/or their support system is an active participant in their care and self management  Demonstrated improvement in consumer satisfaction measures  The model delivers high quality best practice care

7 South West LOCAL HEALTH INTEGRATION NETWORK Scope The work of the Hips and Knees PAT did not:  Fully address system wide capacity issues  Resolve discrepancy between current funding and underlying costs  Focus on prevention and health promotion  Focus on urgent surgeries but instead focused on elective surgeries  Address issues relating to provision of services between LHINs  Commit organizations to specific activities, as such assessment of resource requirements and availability are preliminary

8 South West LOCAL HEALTH INTEGRATION NETWORK Assumptions The Hips and Knees PAT identified the following assumptions: The primary methods of improving wait times will be through enhanced effectiveness Wait times will be monitored to ensure that changes have a positive effect Preliminary resource requirements reflect best estimates Further detailing of processes and configuration of services and associated costs and other resource requirements will occur in subsequent phases of the project The information technology requirements will be dependent on  The Provincial E-Health strategy  The E-Health priorities of the South West LHIN

9 South West LOCAL HEALTH INTEGRATION NETWORK Approach The Hips and Knees PAT was identified as a Quick Start opportunity in the Integrated Health Service Plan. The PAT completed the following activities to fulfill the associated objectives:  Refreshed quantitative data  Reviewed inventories of services and practices  Conducted additional best practice research  Developed a proposed model of integrated service delivery  Implemented a community engagement strategy  Engaged Task Teams to develop specific components of the overall recommendation

10 South West LOCAL HEALTH INTEGRATION NETWORK Overview of the Recommendation

11 South West LOCAL HEALTH INTEGRATION NETWORK Rationale for Change  Wait times are higher than the provincial benchmark  Demand is expected to grow significantly  Current system is fragmented and inequitable This presents a challenge that demands change

12 South West LOCAL HEALTH INTEGRATION NETWORK High-Level Recommendation Create an integrated model of care to improve service delivery efficiency and effectiveness, resulting in:  Decreased wait times  Enhanced quality of care  Equitable access Fundamental goal is to ensure LHIN-wide consistency in service delivery by incorporating evidence-based research and lessons learned into the design of the model

13 South West LOCAL HEALTH INTEGRATION NETWORK Future State An Integrated Model of Care

14 South West LOCAL HEALTH INTEGRATION NETWORK Education Tools  Research and best practices show that quality patient education can improve patient outcomes, anxiety and discharge planning resulting in lower healthcare costs and improved functional outcomes for the patients  The education tools will be Introduced as early as possible Standardized to ensure consistency Based on best practices Customizable for specific patient pathway Accessible  Patient education materials will include Model of Care Brochure Hip and Knee Replacement Services Website Patient Education Binder Teaching Checklist

15 South West LOCAL HEALTH INTEGRATION NETWORK Scope of Services Key Components of the Model:  Standardized Referral Process  Central Registry  Assessment and Education Centres  Secondary Prevention  Pre-Admit / In-Hospital Care  Post-Acute Care

16 South West LOCAL HEALTH INTEGRATION NETWORK Standardized Referral Process Who will provide the service and where?  Patients may be referred by a family physician, nurse practitioner or other physician  Through Family Medicine practices, Family Health Teams, Walk-in clinics, long-term care facilities, urgent care clinics or emergency departments How will the service be provided?  A standardized referral form will incorporate patient choice and streamline the intake process to expedite patients to receive appropriate services

17 South West LOCAL HEALTH INTEGRATION NETWORK Central Registry Who will provide the service and where?  Referrals will go through one Central Registry (one number, one location) serving the entire LHIN How will the service be provided?  Referral forms will be forwarded to this single point of entry into system  Forms will be assessed for completeness  Form will be forwarded as appropriate in a timely manner  The Central Registry will utilize a single wait list to help ensure wait times are distributed appropriately across the LHIN

18 South West LOCAL HEALTH INTEGRATION NETWORK Assessment and Education Centres Who will provide the service and where?  Multidisciplinary clinical assessment team  Three Assessment and Education Centres: One within each planning area Within an existing orthopaedic clinic at a surgical site How will the service be provided?  An initial consultation will be performed to: Obtain required health information Assess surgical status Assess secondary prevention needs Identify post-acute care needs Educate the patient

19 South West LOCAL HEALTH INTEGRATION NETWORK Secondary Prevention What is Secondary Prevention?  Secondary Prevention refers to a wide variety of support available through specific community programs, providers, select outpatient departments and other resources  Secondary Prevention for surgical candidates focus on optimizing their mental and physical readiness for surgery  Secondary Prevention for non-surgical candidates focuses on reducing risk factors and /or better managing their risk factors where surgery is not the best option with the overall aim to optimizing their condition Who will provide the service and where?  Various providers throughout the South West LHIN

20 South West LOCAL HEALTH INTEGRATION NETWORK Secondary Prevention (cont’d) How will the service be provided?  Assessment at earliest point possible: Identify the Secondary Prevention needs of surgical and non- surgical candidates Provide patients with available options and arrange care  Outcomes of Secondary Prevention: Improve patient's knowledge and empower the patient Identify and address safety issues Improve level of fitness and function Enable patient to remain at work and/or at home longer Improve overall quality of life and outcomes  Common assessment tools and guidelines for care

21 South West LOCAL HEALTH INTEGRATION NETWORK Pre-Admit / In-Hospital Care Who will provide the service and where?  Multidisciplinary teams  Each of the surgical sites How will the service be provided?  Pre-admit clinic will be streamlined due to work done in advance at Assessment and Education Centres  Utilize common clinical care pathway and Teaching Checklist to ensure patient treatment is equitable and in accordance with best practices  Adherence to pathway in combination with the Assessment and Education Centres and Secondary Prevention should result in a standardization in the length of stay

22 South West LOCAL HEALTH INTEGRATION NETWORK Post-Acute Care Who will provide the service and where?  Three streams of post-acute care have been identified: Outpatient rehabilitation / private clinic Facility-based rehabilitation Home Care  Services are provided by clinical professionals in a variety of post-acute settings How will the service be provided?  Early identification of most appropriate post-acute care stream Utilize common guidelines Pre-arrange with post-acute care service provider Confirm initial assessment while patient is in-hospital  Post-Acute service providers will track patient progress against key milestones and outcome measures to determine transitions between streams and appropriate time to discharge

23 South West LOCAL HEALTH INTEGRATION NETWORK Recommendations for Implementation

24 South West LOCAL HEALTH INTEGRATION NETWORK Moving from Planning to Implementation Phase One – Next 6 Months Pre-ImplementationImplementation PeriodPost-Implementation First 3 to 6 Months Phase Two – Next 24 Months Following 12 Months Performance Management, Governance and Accountability, Financial Accountability Change Management Plan and Communications Plan Monitoring, Evaluating and Refining

25 South West LOCAL HEALTH INTEGRATION NETWORK Ongoing activities As we move from planning through to implementation the following activities will be critical to our success:  Performance Management  Governance and Accountability  Financial Accountability  Change management  Communication  Monitoring evaluating and refining

26 South West LOCAL HEALTH INTEGRATION NETWORK Performance Management High-Level performance indicators have been identified  Align with the Hips and Knees PAT Mission and Vision  Align with Provincial Wait Time Strategy mandate  Incorporate balancing measures (quality & efficiency)  Include baseline, transitional and end-state measures  Indicators and reporting requirements need to be confirmed with health service providers Service-level measures have also been identified  Task Teams have proposed these additional measures  Beneficial in monitoring and refining specific components of the model

27 South West LOCAL HEALTH INTEGRATION NETWORK Accountability Council Implementation Steering Committee Project Manager Implementation Task Team 1 Implementation Task Team 2 Implementation Task Team X Implementation only Implementation and Ongoing Monitoring Hips and Knees Governance Structure Governance and Accountability

28 South West LOCAL HEALTH INTEGRATION NETWORK Financial Accountability  Funding to be determined during pre-implementation  High-level accountabilities will be reflected in the initial Memorandum of Understanding  Some funding is anticipated to come through cost and resource sharing and would be absorbed by existing budgets  Any funding controlled by the Hips and Knees project itself Hips and Knees Accountability Council and South West LHIN will have oversight Project Manager would track budget and be accountable to explain any significant variances

29 South West LOCAL HEALTH INTEGRATION NETWORK Moving from Planning to Implementation Phase One – Next 6 Months Pre-ImplementationImplementation PeriodPost-Implementation First 3 to 6 Months Phase Two – Next 24 Months Following 12 Months Performance Management, Governance and Accountability, Financial Accountability Change Management Plan and Communications Plan Monitoring, Evaluating and Refining

30 South West LOCAL HEALTH INTEGRATION NETWORK Pre-Implementation Period  Finalize endorsements  Finalize and implement new governance structure  Finalize Memorandums of Understanding  Confirm anticipated costs and funding sources  Confirm funding for and hire Project Manager The success of the Pre-Implementation Period and the entire rollout of the model is dependent on support from key health service providers Activities:

31 South West LOCAL HEALTH INTEGRATION NETWORK Moving from Planning to Implementation Phase One – Next 6 Months Pre-ImplementationImplementation PeriodPost-Implementation First 3 to 6 Months Phase Two – Next 24 Months Following 12 Months Performance Management, Governance and Accountability, Financial Accountability Change Management Plan and Communications Plan Monitoring, Evaluating and Refining

32 South West LOCAL HEALTH INTEGRATION NETWORK Implementation Period Throughout the Implementation Period:  Components of Phase One and Phase Two may occur in parallel  Confirmation of tools and processes will include Initial introduction at a specific location Refinements made before moving forward with LHIN- wide implementation  Monitoring, evaluating and refining components of the model based on feedback

33 South West LOCAL HEALTH INTEGRATION NETWORK Implementation Period – Phase One Phase One  Within 6 months from start of Implementation Period: Confirm tools and processes associated with Standardized Referral, Central Registry, and Education Tools LHIN-wide implementation

34 South West LOCAL HEALTH INTEGRATION NETWORK Implementation Period – Phase Two Phase Two  Within 12 months from start of Implementation Period: Confirm detailed design of Assessment and Education Centres, Secondary Prevention, In-Hospital Care and Post- Acute Care  Within 24 months from the start of implementation period: Modify tools and processes associated with Phase One as necessary Confirm tools and processes associated with all components of the integrated model of care LHIN-wide implementation

35 South West LOCAL HEALTH INTEGRATION NETWORK Moving from Planning to Implementation Phase One – Next 6 Months Pre-ImplementationImplementation PeriodPost-Implementation First 3 to 6 Months Phase Two – Next 24 Months Following 12 Months Performance Management, Governance and Accountability, Financial Accountability Change Management Plan and Communications Plan Monitoring, Evaluating and Refining

36 South West LOCAL HEALTH INTEGRATION NETWORK Post-Implementation period  Project Manager will become redundant  Governance structure will maintain oversight role  Guidelines, care pathways and other tools will help ensure new processes carry on  Continuous monitoring, evaluating and refining of model  Performance Management process will ensure stakeholders remain focused on managing the processes behind the metrics

37 South West LOCAL HEALTH INTEGRATION NETWORK Evaluation of Recommendation

38 South West LOCAL HEALTH INTEGRATION NETWORK Evaluation Criteria  The recommendation was scored based on the degree to which it met each of these eight criteria: Consumer-focused Focused on population health Evidence-based Promotes integration innovation Supports sustainability Supports the health system Demonstrates partnerships Aligns with provincial directives

39 South West LOCAL HEALTH INTEGRATION NETWORK Scoring of Recommendation  Each criteria was scored on a 1 to 5 point for a maximum total score of 40 points The Hips and Knees PAT gave an overall score of 35 The Strategic Advisory Board gave an overall score of 32.6  Scores for each of the individual criteria were consistently high with lower scores for two criteria  Focused on population health  Supports sustainability

40 South West LOCAL HEALTH INTEGRATION NETWORK Recommendations  On April 14 th the Hips and Knees PAT presentation to the Strategic Advisory Group (SAG) resulted in the following outcomes: The SAG accepted the Hips and Knees Case for Successful Quick-Win Execution and supported moving forward to Quick Win Step 5 Executing for Quick Win Success The SAG extended their thanks to everyone who worked on the Hips and Knees PAT and Task Teams

41 South West LOCAL HEALTH INTEGRATION NETWORK Comments & Questions