Senior Design Project Et 493 Design of a Two-story Office/Apt For: Dr. Cris Koutsougeras Advisor: Mr. R.E. Rode Prepared by Joshua Price.

Slides:



Advertisements
Similar presentations
Floor Plans and Furniture Arranging
Advertisements

PROFESSIONAL WORK 1. CORGAN ASSOCIATES, DALLAS, TX CENTERPORT –II TWA
GE-final House of fun………... ROOF Solar power and wind powered house 4 wind intakes that transport collected wind into a wind turbine to produce electricity.
Chapter 2 Analyzing the Business Case.
Smoke Alarm Placement Example #1 Single story house Laundry Garage Living Dining Kitchen Bedroom Bathroom.
3305 Tidewater Drive Norfolk, Va Duplex 2bed /1 bath downstairs 1 bedroom studio upstairs with separate entrance Close to shopping and bus line Assed.
Robert Adkins Et 494 Instructor: Dr. Cris Koutsougeras Advisor: Mr. Rode 12/04/2013.
Robert Adkins Et 493 Dr. Kris Koutsougeras Advisor: Dr. Rodi.
ET-493 Senior Design By: Brian Toomer Advisor: Mr. Rode’
Steel Building Apartment- Design and Build
Types of Drawings University of Palestine Eng. Nagham Ali Hasan
WAINAINA PATRICK NJENGA. * The floor plan: is a view looking down a horizontal plane that is cut through a building from above about 1.5m, illustrating.
Steel Building Apartment- Design and Build Sutton Yanosky ET494 – Dr. Cris Koutsougeras Advisor –Mr. Rode.
Thesis Proposal Virtual Reality in Construction Cost Estimating By: Mandy Frazure Date: 5/12/04.
Steel Fabrication & Erection of Belle Chasse Primary School Belle Chasse, LA Derek Duhon ET Instructor: Chris Koutsougeras Advisor: Edward Rode’
By: Brian Toomer ET-494 Senior Design Dr. Cris Koutsougeras Advisor: Mr. Rode’
Let’s create a floor plan in 3D to help visualize how it works
Room Relationships and Sizes
My Dream House Rebecca Learman School XYZ. WHAT I LEARNED…
NEW MEDICAL FACILITY BUILDING By: Vincent Cannatella and Shelbi Remy Advisor: Edward Rode Instructor: Cris Koutsougeras ET Senior Design 1.
Basement Suite Renovations. Storage Room Under stairs East Bedroom West Bedroom Living Room Furnace Fridge Bathroom Previous Basement Entrance to stairs.
Drawings ACT Objective Realize the organization and intent of construction drawings 2.
By Ahmed Munshey.  Front Page  Other Information  Contents  Objective  House Design  Basic Human Needs  Lowering Ecological Footprints  Materials.
HUNTING CAMP FACILITY BY: Ryan Fremin ET 493 Senior Design Construction Engineering Technology Professor: Dr. Koutsougeras Advisor : Mr. Rode.
Energy Conservation Project UNIT 7 STANDARDS: NCES 2.2.2,
1535 Capel St Park West ~ Mt Pleasant ~ MLS# ~ $735,000 This beautiful elevated home is a wonderful opportunity to move into the highly desirable.
IET 120 CONSTRUCTION PROJECT Name: Elizabeth McClain.
Describe, in German, the following: I live in a house. On the ground floor I have a kitchen, bathroom and living room. On the first floor I have 3 bedrooms.
 Presented by: Stephen DeMatteo  Engineering Technology, Construction  ET- 494 Fall 2014  Advisors: Ed Rode Cris Koutsougeras.
Fundamentals of Project Control Chapter 11 Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project.
How many bedrooms are there?. bedroom bathroom kitchen dining room living room study bedroom.
Steel Fabrication & Erection of Belle Chase Primary School Proposal – Fall 2015 ET 494 – Senior Design II Derek Duhon Instructor: Dr. Koutsougeras Advisor:
ET 493: Senior Design Design of a New Hammond Head Start Center By: Cody Menard and Taylor Bishop Instructor: Dr. C. Koutsougeras Advisor: Mr. R. Edward.
Steel Fabrication & Erection of Belle Chasse Primary School ET-493 Final Proposal Spring 2015 Instructor: Chris Koutsougeras Advisor: Edward Rode’ Derek.
NEW MEDICAL FACILITY BUILDING By: Vincent Cannatella and Shelbi Remy Advisor: Edward Rode Instructor: Cris Koutsougeras ET Senior Design II.
NEW MEDICAL FACILITY BUILDING By: Vincent Cannatella and Shelbi Remy Advisor: Edward Rode Instructor: Cris Koutsougeras ET Senior Design 1.
Planning and Sketching a Floor Plan. Bubble Diagrams Quick Sketches.
ET 493 – Senior Design Design of a Multi-Office Building BY: WOODROW WILSON INSTRUCTOR: DR. C. KOUTSOUGERAS ADVISOR: MR. R. EDWARD RODE.
ET 494 – Senior Design II Design of a Multi-Office Building BY: WOODROW WILSON INSTRUCTOR: DR. C. KOUTSOUGERAS ADVISOR: MR. R. EDWARD RODE.
Service Area Planning. Standard ACT-ADDI-1 Students will identify components related to the design process.
Planning and Sketching a Floor Plan
20065 Bartel St. WAS PRICED AT $274,500
Commercial Office Building
Designing a Commercial Shopping Center
House for Sale.
Design of a Commercial Shopping Center
Multistory Office Building
ET 494: Senior Design Design of a New Hammond Head Start Center
Commercial Office Building
Larry & Kathy Mazalatis
PLAN, NETWORK ANALYSIS AND 3D MODELING OF MULTISTORY BUILDING
Space Planning Objective 5.01.
COST PLANNING AND ESTIMATION
Pre-contract Planning and Practice
Instructor: C. Koutsougeras
Homes have Zones We are going to study the different areas of a home.
MODULE 2 – Project Introduction
My home.
Programming.
Space Planning Objective 5.01.
By: Cody Menard and Taylor Bishop Instructor: Dr. C. Koutsougeras
Commercial Office Building
NEW MEDICAL FACILITY BUILDING
Factors in residential design/Traffic patterns
New Medical Facility Building
Multi-Family Fourplex Apartment
Three Little Pig Analysis
Senior Design Project Prepared for: Dr. Koutsegeras Advisor: E. Rode
82806 E Calamus Dr, Calamus Lake – Near Golf Course
Presentation transcript:

Senior Design Project Et 493 Design of a Two-story Office/Apt For: Dr. Cris Koutsougeras Advisor: Mr. R.E. Rode Prepared by Joshua Price

Abstract ● My project was to designing a two-story office/apartment. ● It required knowledge that was acquired throughout courses in the construction concentration. – Largest concentration being in Autocad

Introduction ● Purpose of this project was to design a building within budget that incorporated certain materials – Design a steel framed building – Most steel being used is steel that I already have – Had to plan the structure to incorporate these materials ● Research on materials – what will be the best materials based on feasibility and cost

Procedures ● Three phases for project – Predesign phase – Design phase – Preconstruction phase

Predesign Phase ● Predesign phase also known as the planning phase – Project was defined based on function and size – First task of this phase was the project definition ● Includes activities, functions, and spaces required – This included approximate sizes and relationships

Project Definition ● Function of building – Serve as an office, pool house, and apartment ● First floor – Includes office, half bath, full bath, and laundry room ● Office will be approximately 25’x20’ ● Half bath approximately 6’x6’6” ● Full bath approximately 6’x14’ ● Laundry room approximately 6’x14’

Project Definition ● Relationships of first floor – Office will be the front of the building – Bathrooms and laundry room will be on the backside of the office – Access to the half bath and laundry room will be from office and outside ● Full bath will only have access from outside

Downstairs Floor Plan

Project Definition ● Second floor – Includes bedroom, closet, bathroom, and area for kitchen, living room, and dining ● Bedroom – 15’x15’ ● Closet – 6’x15’ ● Bathroom – 13’8”x15” ● Remaining area – 39’x35’

Upstairs Floor plan

Design Phase ● Consists of schematic design stage, design development stage, and construction documents stage – Schematic design ● Bubble/block diagram ● Preliminary sketch ● Spaces were optimized by laying out the building according to its uses

Design Phase ● Design Development Stage – Schematic design developed further ● Preliminary working drawings – Includes floor plans and elevations ● Construction Documents stage – Construction drawings developed ● Finalized steel design, stairwells, electrical, etc.

Drawings

Preconstruction Phase ● Budget/cost analysis – Used to evaluate feasibility and impact of materials and techniques ● Decide between metal or wood framing ● Went with wood – prices were close and wood is stronger ● Estimate – Materials and labor broken down to develop projected cost ● Schedule – Planning of activities

Budget/Cost Analysis ● Budget for Project is $80,000 ● Estimated total cost is $155, ● Due to total running over budget, project will be broken into phases – Phase 1 – Slab, Structural, and Framing ● Total estimate - $114, ● Savings - $34, ● New total for Phase 1 - $80, – Slightly over budget

Estimate

Schedule