26 Jan 2010Paul Dauncey1 DESY beam test preparations Paul Dauncey.

Slides:



Advertisements
Similar presentations
23 Jul 2008Paul Dauncey1 TPAC 1.1 vs TPAC2.0 vs TPAC2.1 Paul Dauncey.
Advertisements

17 Sep 2009Paul Dauncey1 US DHCAL integration with CALICE DAQ Paul Dauncey.
13/02/20071 Event selection methods & First look at new PCB test Manqi Ruan Support & Discussing: Roman Advisor: Z. ZHANG (LAL) & Y. GAO (Tsinghua))
Clock module for TB spring 2012 Uli Schäfer 1 R.Degele, P.Kiese, U.Schäfer, A.Welker Mainz.
24 September 2002Paul Dauncey1 Trigger issues for the CALICE beam test Paul Dauncey Imperial College London, UK.
Jaap Velthuis, University of Bristol SPiDeR SPiDeR (Silicon Pixel Detector Research) at EUDET Telescope Sensor overview with lab results –TPAC –FORTIS.
Using the EUDET pixel telescope for resolution studies on silicon strip sensors with fine pitch Thomas Bergauer for the SiLC R&D collaboration 21. May.
MICE Electronics Upgrade P J Smith (University of Sheffield) J Leaver (Imperial College) 17 th June 2009.
9 Sep 2005DAQ - Paul Dauncey1 DAQ/Online Status Paul Dauncey Imperial College London.
L1 Trigger for ACDC Jianchun (JC) Wang Syracuse University VELO ACDC Software Meeting 01/20/2006.
29 Mar 2007Tracking - Paul Dauncey1 Tracking/Alignment Status Paul Dauncey, Michele Faucci Giannelli, Mike Green, Anne-Marie Magnan, George Mavromanolakis,
CO2 cooling pressure drop measurements R. Bates, R. French, G. Viehhauser, S. McMahon.
US CMS Phase 2 R&D Discussion 30-July-2013 “Phase 2 muon R&D” J. Hauser, UCLA  Add redundancy (power) to trigger where most needed  First and innermost.
06/03/06Calice TB preparation1 HCAL test beam monitoring - online plots & fast analysis - - what do we want to monitor - how do we want to store & communicate.
David Cussans, AIDA/CALICE DAQ Palaiseau, 10 Nov 2011 Trigger/Timing Logic Unit (TLU) for AIDA Beam-Test.
SPiDeR  SPIDER DECAL SPIDER Digital calorimetry TPAC –Deep Pwell DECAL Future beam tests Wishlist J.J. Velthuis for the.
15 Dec 2010 CERN Sept 2010 beam test: Sensor response study Chris Walmsley and Sam Leveridge (presented by Paul Dauncey) 1Paul Dauncey.
14 Sep 2005DAQ - Paul Dauncey1 Tech Board: DAQ/Online Status Paul Dauncey Imperial College London.
SITRA Test beams Simulations Zdeněk Doležal Charles University Prague Annual EUDET meeting Munich October 2006.
7 Nov 2007Paul Dauncey1 Test results from Imperial Basic tests Source tests Firmware status Jamie Ballin, Paul Dauncey, Anne-Marie Magnan, Matt Noy Imperial.
FNAL testbeam planning Jan 27, 2014 Alain Bellerive.
DESY test beam (DAQ integration, measurement plans, analysis) Mathieu Benoit.
7 Apr 2010Paul Dauncey1 Tech Board: DECAL beam test at DESY, March 2010 Paul Dauncey.
23 Apr 2008Paul Dauncey1 Future proposal possibilities Paul Dauncey.
TPC Large Prototype cosmic trigger and Micromegas panels D. Attié, P. Colas, E. Delagnes, M. Dixit, A. Giganon, M. Riallot, F. Senée, S. Turnbull Large.
Toward the FNAL Beam Test S. Uozumi (Kobe) May Japan-Korea meeting.
11 Sep 2009Paul Dauncey1 TPAC test beam analysis tasks Paul Dauncey.
Lepton Collider Increased interest in high energy e + e - collider (Japan, CERN, China) STFC funded us for £75k/year travel money in 2015 and 2016 to re-
16 Sep 2009Paul Dauncey1 DECAL beam test at CERN Paul Dauncey for the CALICE-UK/SPiDeR groups: Birmingham, Bristol, Imperial, Oxford, RAL.
M. Chefdeville LAPP, Annecy, France. Introduction  Motivations for a Digital hadronic calorimeter Count hits instead of measuring energy deposits Reduce.
ATLU for AIDA High Rate Synchronous as well as Asynchronous 21/11/2013David Cussans, AIDA WP9.3, DESY1.
Status of NA62 straw electronics Webs Covers Services Readout.
8 Feb 2008Paul Dauncey1 Plans for FY08/09 Paul Dauncey.
1 October 2003Paul Dauncey1 Mechanics components will be complete by end of year To assemble ECAL, they need the VFE boards VFE boards require VFE chips.
1Malcolm Ellis - Tracker Meeting - 28th November 2006 Electronics - Station Acceptance  Hardware: u 1 MICE cryostat with 1 VLPC cassette. u VME crate,
DEPARTEMENT DE PHYSIQUE NUCLEAIRE ET CORPUSCULAIRE JRA1 - Data Acquisition Status Report Daniel Haas DPNC Genève Extended SC Meeting 1 Sep 2008.
21 Sep 2009Paul Dauncey1 Status of Imperial tasks Paul Dauncey.
26 Apr 2009Paul Dauncey1 Digital ECAL: Lecture 3 Paul Dauncey, Imperial College London.
26 Jan 2010Paul Dauncey1 TPAC papers Paul Dauncey.
1 Plans for first beams - - triggers from the BRM group (BSC, BPTX) Gábor Veres for the BRM group CMS Trigger Technical Coordination Meeting 8 October,
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
Custom mechanical sensor support (left and below) allows up to six sensors to be stacked at precise positions relative to each other in beam The e+e- international.
ScECAL Beam FNAL Short summary & Introduction to analysis S. Uozumi Nov ScECAL meeting.
1 Oct 2009Paul Dauncey1 Status of 2D efficiency study Paul Dauncey.
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
4 Jun 2008Paul Dauncey1 Crosstalk and laser results Paul Dauncey, Anne-Marie Magnan, Matt Noy.
SPD VFE installation and commissioning (status and plans) I.Status of VFE test at Barcelona II.First commissioning experience at CERN (15 th -16 th March)
ATLU for AIDA High Rate Synchronous as well as Asynchronous 21/11/2013 David Cussans, AIDA WP9.3, DESY 1.
5 May 2006Paul Dauncey1 The ILC, CALICE and the ECAL Paul Dauncey Imperial College London.
18 Sep 2008Paul Dauncey 1 DECAL: Motivation Hence, number of charged particles is an intrinsically better measure than the energy deposited Clearest with.
David Cussans, 18 th October 2006 Status of the JRA1 Trigger Logic Unit (TLU)
JRA1 – JRA2 Interface Tobias Haas DESY 4 January 2006.
9 Sep 2008Paul Dauncey1 Tracking software status Paul Dauncey.
AIDA (mini) Trigger/Timing Logic Unit (mini TLU) Introduction Status Plans Summary 21/11/2013David Cussans, AIDA WP9.3, DESY1.
Advanced Monolithic Active Pixel Sensors with full CMOS capability for tracking, vertexing and calorimetry Marcel Stanitzki STFC-Rutherford Appleton Laboratory.
SPiDeR  Status of SPIDER Status/Funding Sensor overview with first results –TPAC –FORTIS –CHERWELL Beam test 09 Future.
14.4. Readout systems for innovative calorimeters
Analysis of LumiCal data from the 2010 testbeam
Final CALICE OsC meeting: Status and summary of project
for the SPiDeR collaboration (slides from M. Stanitski, Pixel2010)
Markus Friedl (HEPHY Vienna)
AHCAL Beam Interface (BIF)
Preparation for CERN test beam
Testbeam Timing Issues.
SEABAS/EUTelescope Integration Idea
AIDA (mini) Trigger/Timing Logic Unit (mini TLU)
CALICE/EUDET Electronics in 2007
DECAL beam test at CERN Paul Dauncey for the CALICE-UK/SPiDeR groups:
Trigger issues for the CALICE beam test
Presentation transcript:

26 Jan 2010Paul Dauncey1 DESY beam test preparations Paul Dauncey

26 Jan 2010Paul Dauncey 2 Two main goals for beam test MIP paper Find efficiency for other sensor variants which were not covered in enough detail at CERN Requires that enough sensor variants are available and trimmed Aim for two each of 12  m non-deep P-well, 12  m hi-res and 18  m hi- res, plus as many as possible (at least five) of standard sensors All need to be trimmed, potted and checked beforehand Shower density paper Measure electron shower response and core density Requires accurate knowledge of shower centre Need external tracking to find projected impact point Use EUDET telescope and combine with TPAC DAQ data

26 Jan 2010Paul Dauncey 3 Telescope interface EUDET trigger handed by TLU Designed by Dave Cussans, Bristol Can send (lowest 15 bits of) trigger number for each trigger via hardware interface; need RJ45 cable to connect to TLU Add interface to master USB_DAQ firmware Rui Gao, Oxford, has started working on this Will make a custom RJ45-IDC short cable to plug into USB_DAQ Record trigger arrival timestamps and trigger numbers in FPGA Also need run number; accessible through EUDET socket software Read out run/trigger data along with other data following bunch train Associate systems offline Use standard EUDET software to internally align telescope and form tracks (as being done by Alessandro Calderone at Bristol) Use run/trigger data and timestamps to associate tracks with one (or a few) BX in TPAC data Do alignment by comparing TPAC hits to tracks; new code needed

26 Jan 2010Paul Dauncey 4 Suggested stack geometry Put tungsten slabs within sensor array, not in front Still allows several layers behind tungsten Could be three before/three behind rather than two/four Initial layers give direct cross-check of telescope and make alignment easier Also give backup in case telescope data cannot be interpreted Initial layers allow “MIP” measurements to continue even while doing shower measurements

26 Jan 2010Paul Dauncey 5 Triggering What does EUDET telescope trigger use for triggering? TPAC 1×1cm 2 scintillators or some other, larger ones? Do we need to know about showers just outside the scintillators? These would give tails which would look like random noise Makes comparison with out-of-time BXs more complicated Larger scintillators, e.g. 5×5cm 2, would catch these tails Downsides to using larger scintillators Higher rate of telescope triggers so more deadtime; probably not a big issue Need to buy/borrow and commission them!

26 Jan 2010Paul Dauncey 6 Plan Reassemble system as used at CERN Start running with any/all sensors which are trimmed as they become available System should be assembled asap – Marcel, Jan Sensor gluing, potting and trimming – Jamie, Paul Try out stack geometries with sensors both sides of tungsten Find out what is feasible/easy Do as soon as system is stable – Marcel, Jan Add in new TPAC master firmware and TLU when Rui is ready Get EUDET online software interface running also Check run/trigger data look sensible offline Aim for ~two weeks – Rui, Paul Get larger scintillators for telescope trigger Need HV and logic also Ideally ready when interface is ready – John, Nigel?